mi_id: MIMR-node_d334792
type: market_report
canonical_url: "https://www.pheonixresearch.com/automotive-transportation/parking-curb-airport-mobility/market-report/global-ev-charging-at-parking-assets-market/"
md_url: "https://www.pheonixresearch.com/automotive-transportation/parking-curb-airport-mobility/market-report/global-ev-charging-at-parking-assets-market.md"

schema:
  "@type": Dataset
  "@id": MIMR-node_d334792
  url: "https://www.pheonixresearch.com/automotive-transportation/parking-curb-airport-mobility/market-report/global-ev-charging-at-parking-assets-market/"
  title: "Global EV Charging at Parking Assets Market Report, Size, Share and Forecast 2026–2033: Charging Turns a 90-Minute Bay Into a Four-Hour Bay — and Nobody Has Repriced It"
  description: "Global EV charging at parking assets reaches USD 25.00bn in 2025 and USD 63.60bn by 2033 at 12.38%. A 44 kWh charge takes 4 hours at 11 kW and 9 minutes at 300 kW - and the bay was never repriced."
  datePublished: "2026-11-20T11:07:38+00:00"
  dateModified: "2026-11-20T11:10:10+00:00"
  keywords:
    - EV charging at parking assets market
    - parking EV charging market size
    - charging bay dwell time
    - AFIR occupancy fee
    - Public Charge Point Regulations 2023
    - destination charging economics
    - Q-Park EV charging
    - APCOA charging
  isPartOf:
    - id: MISG-node_2ae3967
      type: CollectionPage
      url: "https://www.pheonixresearch.com/automotive-transportation/parking-curb-airport-mobility/"
      name: "Parking, Curb & Airport Mobility"
    - id: MIIN-node_233f7ed
      type: CollectionPage
      url: "https://www.pheonixresearch.com/automotive-transportation/"
      name: "Automotive & Transportation"
    - id: MIWS-root
      type: WebSite
      url: "https://www.pheonixresearch.com/"
      name: Pheonix Research
  mentions:
    - id: MIEN-node_8d955358
      type: Organization
      url: "https://www.q-park.com"
      name: Q-Park
      sameAs:
        - "https://www.wikidata.org/wiki/Q1127798"
    - id: MIEN-node_80c5a410
      type: Organization
      url: "https://www.apcoa.com"
      name: APCOA Parking
      sameAs:
        - "https://www.wikidata.org/wiki/Q296108"
    - id: MIEN-node_3fbe1843
      type: Organization
      url: "https://www.spplus.com"
      name: SP+
      sameAs:
        - "https://www.wikidata.org/wiki/Q7598289"
    - id: MIEN-node_11f19906
      type: Organization
      url: "https://www.ncp.co.uk"
      name: National Car Parks (NCP)
      sameAs:
        - "https://www.wikidata.org/wiki/Q6971273"
    - id: MIEN-node_6625b14d
      type: Organization
      url: "https://www.park24.co.jp"
      name: Park24
      sameAs:
        - "https://www.wikidata.org/wiki/Q11089693"
    - id: MIEN-node_226809e4
      type: Organization
      url: "https://www.amano.co.jp"
      name: Amano Corporation
      sameAs:
        - "https://www.wikidata.org/wiki/Q11284890"
    - id: MIEN-node_b1f92903
      type: Organization
      url: "https://www.bp.com/en/global/bp-pulse.html"
      name: bp pulse
    - id: MIEN-node_d95a1965
      type: Organization
      url: "https://www.shell.com"
      name: Shell Recharge
    - id: MIEN-node_2fa56a06
      type: Organization
      url: "https://www.chargepoint.com"
      name: ChargePoint
    - id: MIEN-node_2fd37e71
      type: Organization
      url: "https://www.evgo.com"
      name: EVgo
    - id: MIMR-node_ead42e1
      type: Dataset
      url: "https://www.pheonixresearch.com/automotive-transportation/parking-curb-airport-mobility/market-report/global-on-street-parking-enforcement-digital-permitting-market/"
      name: "Global On-Street Parking Enforcement & Digital Permitting Market Report, Size, Share and Forecast 2026–2033: The Citation Is the Product, and the Plate Is the Evidence"
    - id: MIMR-node_91680b4
      type: Dataset
      url: "https://www.pheonixresearch.com/automotive-transportation/parking-curb-airport-mobility/market-report/global-parking-management-concession-operations-market/"
      name: "Global Parking Management & Concession Operations Market Report, Size, Share and Forecast 2026–2033: The Bay Was Never the Asset — the Contract Is"
    - id: MIMR-node_a106064
      type: Dataset
      url: "https://www.pheonixresearch.com/automotive-transportation/parking-curb-airport-mobility/market-report/global-curb-kerbside-management-market/"
      name: "Global Curb & Kerbside Management Market Report, Size, Share and Forecast 2026–2033: Ninety-Four Per Cent Parking by Default — the Curb Is a Schedule, Not a Car Park"
    - id: MIMR-node_b2546f5
      type: Dataset
      url: "https://www.pheonixresearch.com/automotive-transportation/parking-curb-airport-mobility/market-report/global-parking-occupancy-sensing-space-guidance-market/"
      name: "Global Parking Occupancy Sensing & Space-Guidance Market Report, Size, Share and Forecast 2026–2033: The Sensor That Gets Bought Is the One That Isn’t Installed"
    - id: MIMR-node_743a979
      type: Dataset
      url: "https://www.pheonixresearch.com/automotive-transportation/parking-curb-airport-mobility/market-report/global-airport-parking-pre-booked-reservation-platforms-market/"
      name: "Global Airport Parking & Pre-Booked Reservation Platforms Market Report, Size, Share and Forecast 2026–2033: A Bay Is Perishable — a Booking Is an Asset"
    - id: MIMR-node_2521e41
      type: Dataset
      url: "https://www.pheonixresearch.com/automotive-transportation/parking-curb-airport-mobility/market-report/global-smartphone-credential-reader-market/"
      name: "Global Smartphone Credential Reader Market Report, Size, Share and Forecast 2026–2033: The Box Is Priced per Door, the Credential per Person — and That Gap Is the Whole Market"
    - id: MIMR-node_b4ffaa7
      type: Dataset
      url: "https://www.pheonixresearch.com/automotive-transportation/parking-curb-airport-mobility/market-report/global-parking-access-revenue-control-systems-market/"
      name: "Global Parking Access & Revenue Control Systems (PARCS) Market Report, Size, Share and Forecast 2026–2033: The Gate Is Free Now — PARCS Is Sold by the Transaction, Not by the Lane"
  about:
    - "@type": Thing
      name: Market Intelligence
      mi_id: "MIMR-node_d334792#intelligence"
    - "https://www.wikidata.org/wiki/Q1901028"
  base_year: 2025
  forecast_year: 2033
  value_base_year: 25.00
  value_forecast_year: 63.60
  value_cagr: 12.38
  value_currency: USD
  value_unit_scale: Billion

acf:
  base_year: 2025
  forecast_year: 2033
  value_base_year: 25.00
  value_forecast_year: 63.60
  value_cagr: 12.38
  value_currency: USD
  value_unit_scale: Billion
  coverage_type: Global
  coverage_name: Global
  competitive_intensity_level: high
  market_structure_type: fragmented
  tier1_player_count: 10
  investment_trend_direction: rising
  capital_intensity_level: high
  recent_mna_activity: yes
  overall_market_risk_level: moderate
  geopolitical_exposure_level: moderate
  substitution_risk_level: moderate
  regulatory_complexity_level: high
  approval_pathway_structure: multi_jurisdictional
  innovation_intensity_level: high
  technology_maturity_stage: growth
  patent_activity_level: moderate
  supply_chain_complexity_level: high
  distribution_structure: hybrid
  primary_operational_model: hybrid
  executive_summary: "Global spend on EV charging delivered through parking assets reaches USD 25.00 billion in 2025 and USD 63.60 billion by 2033, a CAGR of 12.38 per cent. But the composition is shifting faster than the total: equipment and installation fall from 58.4 to 40.7 per cent of the market while electricity resold rises from 29.9 to 39.8 per cent and software and operations from 11.7 to 19.5 per cent. Of the USD 38.60 billion added by 2033, energy supplies 46.2 per cent and the physical build only 29.3 per cent. The market's defining constraint is physical, not financial. A 44 kWh top-up takes 6.29 hours at 7 kW, 4.00 hours at 11 kW and 0.15 hours at 300 kW — so the power rating a site selects determines how long the bay is occupied. Holding tariff and energy margin constant, revenue per available bay-hour rises from USD 4.84 at 7 kW to USD 39.11 at 300 kW, a 8.26x gradient generated entirely by dwell. The industry has built the slow end: 56 per cent of UK public devices are 3-8 kW and only 20 per cent are 50 kW or above. Q-Park's 7,310 operated ports consumed 21.2 GWh in 2025, or 2,900 kWh per port per year — a 3.01 per cent capacity utilisation at 11 kW. The repricing instruments now exist, including AFIR's occupancy fee per minute above 50 kW and the UK's p/kWh transparency rules, but both are scoped to the fast minority that already turns over quickly."
  toc: "<ol><li><a href=\"#section-01\">Market Snapshot</a></li><li><a href=\"#section-02\">Executive Summary</a></li><li><a href=\"#section-03\">What This Market Actually Sells</a></li><li><a href=\"#section-04\">Demand Drivers</a></li><li><a href=\"#section-05\">Segment and Product Split</a></li><li><a href=\"#section-06\">Regional Analysis</a></li><li><a href=\"#section-cl\">Competitive Landscape</a></li><li><a href=\"#section-vc\">Value Chain</a></li><li><a href=\"#section-ia\">Investment Activity</a></li><li><a href=\"#section-ti\">Technology and Innovation</a></li><li><a href=\"#section-mr\">Market Risk</a></li><li><a href=\"#section-rl\">Regulatory Landscape</a></li></ol>"
  competitive_landscape_content: "<h2 id=\"section-cl\">7. Competitive Landscape</h2><p>This market has no consolidator, and the reason is structural rather than commercial: the thing being competed for is a lease on somebody else's ground, and leases expire.</p><p>Q-Park finished 2025 with <strong>5,573 parking facilities and 1,237,940 spaces</strong>, having acquired 67 facilities with 36,088 spaces during the year. Across that estate it held <strong>9,416 charge points across 398 facilities</strong> — up 37 per cent and 52 per cent respectively — of which it operated <strong>7,310</strong>. APCOA reported <strong>5,375</strong> charge points installed, a 43 per cent increase, across a network it describes as more than 13,000 sites, and has set an ambition of up to <strong>100,000</strong> charging stations by 2035 alongside a 1,000-station high-power partnership programme. SP+ operates predominantly as an agent, a structure examined at length in the companion concession report on this segment. NCP, Park24 and the Amano group hold national positions of similar shape.</p><p>Set those numbers against the size of the installed base. The Pheonix model puts <strong>3.40 million</strong> parking-asset charging ports in place at the end of 2025. The two largest European parking operators between them account for well under one per cent of it. Pheonix estimates the top ten operators by installed parking-asset ports at <strong>18 to 22 per cent combined</strong> — and that figure should be read as an estimate, not a measurement, because no operator discloses an installed base on a comparable basis.</p><table><thead><tr><th>Operator</th><th>Model</th><th>Disclosed charging position</th><th>Participation in energy margin</th></tr></thead><tbody><tr><td>Q-Park</td><td>Owner-operator, long leases</td><td>9,416 ports, 398 facilities, 7,310 operated</td><td>Direct on 78% of ports</td></tr><tr><td>APCOA</td><td>Partnership-led</td><td>5,375 ports, +43% in 2025</td><td>Indirect — space rental</td></tr><tr><td>SP+</td><td>Agent</td><td>Not separately disclosed</td><td>Fee-based</td></tr><tr><td>NCP</td><td>Owner-operator, national</td><td>Not separately disclosed</td><td>Mixed</td></tr><tr><td>Park24</td><td>Owner-operator, Japan-centric</td><td>Not separately disclosed</td><td>Direct</td></tr><tr><td>CPO specialists</td><td>Site-host agreements</td><td>Multi-site networks</td><td>Full where they own the port</td></tr></tbody></table><p>The fragmentation has three causes. The first is land: parking capacity is held by tens of thousands of municipalities, landlords, airports and retailers, and each negotiation is local. The second is capital: a charging portfolio is built site by site, and there is no way to acquire scale except by acquiring the underlying parking business. The third, and the one that is specific to this market, is <strong>that the two sides of the transaction are different industries</strong>. A parking operator's competence is land, access and enforcement. A charge point operator's competence is power, uptime and payments. The contract that joins them determines who owns the customer, and neither side wants to give that up.</p><h3>The two competitive positions</h3><p><strong>Integrator.</strong> The operator funds and runs the ports. Q-Park's 78 per cent self-operation ratio is the reference case. Advantages: full capture of the energy margin, a single customer relationship, control over tariff design — including the ability to price the bay-hour rather than the electron. Disadvantages: capital intensity, and the obligation to hold operational competence in a business that is not parking. Q-Park's EV charging revenue rose <strong>45.6 per cent</strong> in 2025 and 57.9 per cent in 2024, which is what an integrator's curve looks like in the growth phase.</p><p><strong>Landlord.</strong> The operator provides the site and a rental fee; a partner funds and operates. APCOA's disclosed arrangements follow this shape. At Rotterdam Westblaak, the 300 kW hub is delivered with bp pulse and THORNICO; in Austria, APCOA \"defines a location-dependent parking space rental fee\" while Wien Energie conducts feasibility, installs, operates and bills. Advantages: no capital, no operational risk, immediate amenity value. Disadvantage: the operator captures a rent that is fixed at contract signature while the partner captures a margin that compounds at 16.45 per cent.</p><p>Between those two positions sits a third that the industry has barely begun to price: <strong>revenue share</strong>. It appears in the sector but rarely as a formula tied to bay-hour economics. Where it exists it is typically a percentage of gross charging revenue, which aligns neither party — the operator still bears the opportunity cost of the bay and is compensated on a basis that ignores it.</p><h3>Who actually competes with whom</h3><p>The competitive map is not one map. Three contests run in parallel and only occasionally touch.</p><p><strong>For the site.</strong> Charge point operators bid against each other for the same car park, and against the operator's own build option. The bid is essentially a land-rent auction, and it is being won on a metric — rent per port per year — that takes no account of dwell.</p><p><strong>For the driver.</strong> At a parking asset the driver is captured before arrival, because they are going to that destination anyway. Competition is therefore on reliability and price transparency, not on location. The UK's 99 per cent reliability obligation on rapid networks and AFIR's comparability requirements are attempts to make that competition legible.</p><p><strong>For the vehicle's charging event.</strong> This is the contest the parking industry underestimates: the same charge can be delivered at home, at work, at a forecourt or at the destination. At a parking asset the operator is competing against the driver's own driveway, and the asset's advantage — no cable, no driveway, guaranteed space — is worth more to a driver with no off-street parking than to one with it.</p><h3>Concentration and its direction</h3><p>Pheonix expects concentration to increase, but slowly and unevenly. The mechanism is not charging — it is parking M&A. Q-Park's 67 acquisitions in a single year add 36,088 spaces and, bundled with them, the right to install. Every parking portfolio transaction is also a charging portfolio transaction, whether or not either party models it that way.</p><p>The constraint is that acquisitions buy the remainder of a lease rather than its renewal, a structural fact examined in the concession report. A charging portfolio assembled through parking M&A inherits that duration risk, and charging assets have a shorter economic life than the leases they sit under.</p><p>The likely end state is a barbell: a handful of integrators with 100,000-plus ports and genuine energy margin, a long tail of landlord-model operators renting bays to regional charge point operators, and a middle layer of operators who installed ports without repricing bays and will find, at the next lease renewal, that the incumbent has more negotiating leverage than the asset does.</p>"
  value_chain_content: "<h2 id=\"section-vc\">8. Value Chain</h2><p>The chain runs from a substation to a driver's payment card, and the way to read it is by asking at each stage who bears the cost of the bay being occupied.</p><h3>Stage 1 — Grid connection</h3><p>Everything starts here, and here is where the market's real bottleneck sits. A new load requires a service application, an engineering review, and either a service extension or a distribution upgrade. The New York Department of Public Service, in a December 2025 filing on capacity constraints, describes the range: where capacity does not exist at the requested location, the utility must upgrade substation, feeder or circuit assets, a process that \"can take from one to ten years, depending on the asset in question, and can cost several million dollars.\"</p><p>The same filing identifies precisely why EV load is harder to serve than building load: it is <strong>power-dense</strong> — a great deal of capacity requested relative to site area — and it has a <strong>low load factor</strong>, meaning average demand is a small fraction of nameplate. A parking-asset site requesting 1 MW to serve an average load of 30 kW is asking the network to reserve capacity it will almost never use.</p><p>In the parking-asset value chain, the connection is the one stage where the cost is fixed by the maximum power requested rather than by the energy delivered. That single fact explains most of the industry's behaviour. It is why operators install AC where they would prefer DC, fit load management to cap the site's import, and in some cases accept curtailed charging rather than fund an upgrade.</p><h3>Stage 2 — Equipment</h3><p>Hardware is the least differentiated stage and the most deflationary. The published DC deployment cost range runs from <strong>USD 30,000 to USD 285,000</strong> — a spread driven almost entirely by the connection and civil works rather than by the charger. Ultra-fast hardware prices fell roughly <strong>20 per cent between 2022 and 2024</strong>. In AC, the post is a commodity and the margin sits in the installation.</p><p>For a parking operator, this stage is a procurement exercise with one decision that matters: the power rating. Everything downstream depends on it.</p><h3>Stage 3 — Site host</h3><p>This is where the market's economics are decided and where almost no analysis is done. The site host contributes land, access, security, lighting, signage and — critically — the opportunity cost of the bay.</p><p>Three contractual forms dominate. Under a <strong>lease</strong>, the host takes a fixed rent per space or per port. Under a <strong>concession</strong>, the host takes a share of revenue. Under <strong>self-operation</strong>, the host is the operator and bears everything.</p><p>Only self-operation gives the host any incentive to think about bay-hours, because only self-operation makes the host indifferent between parking revenue and charging revenue. Under a lease, the host has sold the bay's time and no longer cares how long it is used. Under a concession, the host cares about revenue but not about the alternative use of the bay.</p><p>The consequence is counter-intuitive and is one of this report's central points: <strong>the party best placed to price the bay-hour is the party with the least contractual reason to do so.</strong></p><h3>Stage 4 — Charge point operator</h3><p>The CPO funds, installs, energises, maintains and bills. Its revenue is the retail tariff less wholesale electricity, network charges, roaming fees and payment processing. Its cost base is dominated by fixed elements — the connection capacity charge, the management platform subscription, field maintenance — which means its profitability is a function of utilisation and almost nothing else.</p><p>This is why CPOs and parking operators want different things from the same site. The CPO wants throughput. The parking operator wants either throughput or dwell, depending on whether the car park is full. Where the car park is full, the two objectives are in direct conflict, and the contract between them usually resolves it in favour of whoever has the longer duration.</p><h3>Stage 5 — Mobility service provider and roaming</h3><p>The MSP sits between the CPO and the driver, aggregating networks and providing access. Regulation has pushed hard on this layer. AFIR requires ad hoc access at every public point and prohibits extra charges for cross-border roaming; the UK requires operators to enable payment through at least one roaming provider and to notify the Secretary of State of their roaming arrangements.</p><p>The MSP layer compresses margin at the CPO end while adding friction at the driver end — the well-documented problem being that the price displayed in an app frequently differs from the price at the post.</p><h3>Stage 6 — The driver</h3><p>The driver is buying a charge and, at a parking asset, also buying the right to leave the car. Because the two are bundled, the driver's price sensitivity is split in a way that neither the operator nor the CPO measures. A driver who has paid to park has already sunk the parking cost; the marginal decision is whether to charge there or later. A driver who has come specifically to charge treats the parking charge as a fee on charging.</p><p>The UK regulations address this directly: where charging is sold alongside parking in a single combined price, \"the portion of this price that relates to charging must be clearly displayed separately in p/kWh.\" The requirement exists because the industry bundled the two and the bundle concealed which product was expensive.</p><h3>Where the margin sits</h3><table><thead><tr><th>Stage</th><th>Cost driver</th><th>Margin shape</th><th>Who bears bay-occupancy cost</th></tr></thead><tbody><tr><td>Grid connection</td><td>Maximum import capacity</td><td>Regulated return</td><td>Nobody</td></tr><tr><td>Equipment</td><td>Unit volume, civil works</td><td>Deflationary</td><td>Nobody</td></tr><tr><td>Site host</td><td>Land, opportunity cost of bay</td><td>Rent or share</td><td><strong>The host</strong></td></tr><tr><td>CPO</td><td>Utilisation, fixed connection charges</td><td>Operating leverage</td><td>Partially, via throughput</td></tr><tr><td>MSP</td><td>Transaction volume</td><td>Thin, regulated</td><td>Nobody</td></tr><tr><td>Driver</td><td>Energy price, time</td><td>—</td><td>Bears it, unpriced</td></tr></tbody></table><p>The table exposes the structural flaw. The cost of a bay being occupied is borne by the site host. The revenue from a bay being occupied is earned by the CPO. The two are joined by a contract that prices land by the space or by the year, and never by the hour. Until that changes, the bay-hour will remain an externality inside the transaction that creates it.</p>"
  investment_activity_content: "<h2 id=\"section-ia\">9. Investment Activity</h2><p>Capital is entering this market through four doors, and only one of them is charging investment.</p><h3>Door one: parking portfolio acquisition</h3><p>The largest flows are parking transactions that carry charging as a bundle. Q-Park acquired <strong>67 parking facilities with 36,088 spaces</strong> in 2025, taking its portfolio to <strong>5,573 facilities and 1,237,940 spaces</strong>. It also grew charge points from 6,854 to <strong>9,416</strong> and operated ports from 4,708 to <strong>7,310</strong> — a 55 per cent increase in the operated base against a 37 per cent increase in the total, meaning a meaningful share of the growth came from taking operational control of ports it already had.</p><p>That distinction matters. Buying a car park with chargers in it and operating them yourself is a different investment from buying a car park and installing chargers. The first is an operating leverage play; the second is a construction project. Q-Park did both, and the disclosures do not separate them.</p><h3>Door two: operator-led rollout programmes</h3><p>APCOA's stated ambition — up to <strong>100,000</strong> charging stations across more than 13,000 sites by 2035, plus <strong>1,000</strong> high-power stations with partners — is the largest disclosed parking-asset charging programme in the market. It is delivered through partnership rather than balance sheet, which means the capital sits with utilities and energy majors rather than with the operator. The Wien Energie arrangement is the template: APCOA provides prioritised locations and defines a location-dependent space rental fee; the partner conducts feasibility, installs, operates and bills.</p><p>What makes that investable for the partner is a guaranteed location with an existing customer base — a demand anchor that a roadside site does not have.</p><h3>Door three: energy majors buying position</h3><p>bp pulse's Westblaak hub in Rotterdam, delivered with APCOA and THORNICO at 300 kW, is the clearest example of an oil major buying urban parking-asset real estate as a charging location without buying the parking business. The logic is straightforward: the site is already permitted, already has access control, already has a customer, and the marginal cost of the connection is lower than a greenfield site. The operator gets amenity and rent; the energy company gets a city-centre location it could not otherwise assemble.</p><h3>Door four: public programmes, largely undelivered</h3><p>NEVI allocated <strong>USD 5 billion</strong>. By the end of 2024, roughly <strong>USD 30 million</strong> had been spent on charging points in operation. In 2025, states spent about <strong>USD 94 million of the USD 4.4 billion available</strong>, delivering <strong>497 ports at 99 locations</strong> — around 3 per cent of the 18,041 fast ports added nationally that year.</p><p>The programme's failure is instructive rather than incidental. It was designed for corridor coverage, where utilisation is structurally low because the corridor exists for the few vehicles making long journeys. A parking asset has the opposite profile: the customer is coming anyway. The public programme funded the harder site type, delivered it slowly, and the private market grew 30 per cent without it.</p><p>By contrast, the EU's obligation-based approach — 1.3 kW per BEV, enforced nationally — does not pick sites at all. It sets a quantity and lets the market decide where. That is a materially better-designed instrument for this particular problem, because it lets parking assets compete on their natural advantage.</p><h3>Valuation and multiples</h3><p>Pheonix's estimate of transaction multiples in parking-asset charging is <strong>6 to 9 times EBITDA</strong>, and it should be read as an estimate rather than an observed range — no disclosed transaction in this segment isolates a charging asset from its parking host. The range spans the two models almost exactly: a self-operated, energy-margin-exposed asset supports the upper end, while a landlord-model asset with contracted rent sits at the lower.</p><p>The multiple is also unstable in a way that matters to any buyer. A charging asset's EBITDA is highly sensitive to utilisation, and utilisation in this market is measured in single digits at the slow end. A 1 percentage point improvement in a 3.01 per cent utilisation figure is a 33 per cent improvement in throughput. That is the operating leverage that justifies a multiple — but it cuts in both directions, and the same mathematics applies to a demand shock.</p><h3>Where capital is going next</h3><p>Three destinations are attracting disproportionate attention.</p><p><strong>High-power hubs at long-stay assets.</strong> Airport, park-and-ride and retail destination sites where four hours of dwell is acceptable or irrelevant, and where a 150–300 kW post delivers the 8.26-fold bay-hour improvement without destroying the parking proposition.</p><p><strong>Load-managed AC estates.</strong> The capital-efficient play. Rather than upgrading a connection, cap the site's aggregate import and let a management system distribute it across many AC ports. The reasoning is the New York regulators' point about load factor: if the site's average demand is a few per cent of nameplate, the site does not need more capacity, it needs better scheduling.</p><p><strong>Software and compliance.</strong> The 19.81 per cent growth arm. Regulatory obligations on data, reliability, payment and reporting have created a category of spend that scales with device count and is not price-shopped.</p><h3>The capital gap nobody is funding</h3><p>The one thing that would most improve returns in this market — repricing the bay — requires no capital at all. It requires a contract change. That is precisely why it is not happening: there is no transaction to earn a fee on, no asset to mark up, and no party whose mandate covers it.</p>"
  technology_innovation_content: "<h2 id=\"section-ti\">10. Technology and Innovation</h2><p>The most important technology decision in this market is also the oldest: how many kilowatts to put in the ground.</p><h3>Power rating as the design variable</h3><p>At 7 kW, a 44 kWh top-up takes <strong>6.29 hours</strong>. At 11 kW, <strong>4.00 hours</strong>. At 22 kW, 2.00 hours. At 50 kW, <strong>0.88 hours</strong>. At 150 kW, 0.29 hours. At 300 kW, <strong>0.15 hours</strong>.</p><p>Those six numbers are the technology chapter of this report. Everything else — the connector standard, the payment terminal, the management platform — is implementation detail by comparison.</p><p>There is a constraint that makes the ladder steeper than it looks. On AC, the vehicle's onboard charger is usually the limiting device, and 11 kW is the common ceiling for current passenger EVs. Fitting a 22 kW AC post to an 11 kW-capable vehicle delivers 11 kW. The hardware cost rises, the dwell does not fall, and the bay-hour economics are unchanged. This is the single most common specification error in parking-asset charging.</p><h3>The deflation at the top</h3><p>Ultra-fast charging — 150 kW and above — grew by more than <strong>50 per cent in 2024</strong> and now accounts for nearly <strong>10 per cent of all fast chargers</strong> globally. The IEA attributes part of that shift to cost: ultra-fast charger prices fell roughly <strong>20 per cent between 2022 and 2024</strong>.</p><p>That deflation changes the calculus for parking assets, because the bay-hour gradient is steepest at the top of the power range. The jump from 11 kW to 50 kW multiplies revenue per bay-hour by 1.88; the jump from 50 kW to 150 kW multiplies it by 2.20. As the capital cost at the top falls, the case for putting a small number of high-power posts into a large AC estate gets stronger, not weaker.</p><p>That is the barbell strategy APCOA has disclosed without naming it: 11–50 kW AC and DC across the estate, plus a separate partner-funded programme of 1,000 high-power stations. Volume in the middle, margin at the top.</p><h3>Battery buffering and the connection problem</h3><p>Where the grid cannot deliver the requested capacity — which, per the New York filing, can take one to ten years and several million dollars to fix — the technical answer is to stop asking for it. A battery energy storage system behind the meter can absorb a slow trickle from the network and deliver a fast charge to the vehicle, decoupling the charger's power rating from the site's import capacity.</p><p>The economics are unusual and worth stating plainly: the battery does not make the energy cheaper, it makes the <em>bay-hour</em> cheaper, by allowing a site to offer 150 kW dwell economics on a 50 kW connection. In a market where revenue per bay-hour varies 8.26-fold, that is a high-value application.</p><h3>Load management at the estate level</h3><p>The obverse of buffering is simply to manage the load. A site with forty AC ports and a 100 kW connection cannot run all forty at 11 kW simultaneously; a management system that rotates or throttles them can. The vehicle does not care, because it is parked for four hours anyway.</p><p>This is where the AC estate's apparent weakness becomes a technical advantage. Slow charging is inherently interruptible. A 300 kW session cannot be paused without the driver noticing; a four-hour 11 kW session can be paused for twenty minutes without consequence. The AC estate is therefore the natural home for demand flexibility, and the revenue from providing it — to a network operator, an aggregator or a flexibility market — is a second income stream on a port that is otherwise 3 per cent utilised.</p><h3>Standards and the compliance stack</h3><p>Open Charge Point Protocol governs communication between the charger and the management system; Open Charge Point Interface governs the data that must be published. The UK mandates OCPI for public points and requires reference and availability data to be machine-readable and available to government bodies, distribution network operators and system operators.</p><p>ISO 15118 and Plug & Charge — where the vehicle authenticates over the cable without a card or app — remain the most consequential standard in the chain, because they remove the payment terminal from the bill of materials while simultaneously satisfying the contactless requirement in spirit. AFIR's requirement from 1 January 2027 for card or contactless payment at all public points above 50 kW on the TEN-T network and at safe and secure parking areas has pushed terminal costs back into the equation for exactly the sites that did not want them.</p><h3>Vehicle-to-grid and the parked battery</h3><p>A parking asset holds a large aggregate battery for hours at a time. Vehicle-to-grid and vehicle-to-building have been technically feasible for years and commercially marginal, for a reason that this report's framing makes obvious: the value of a bidirectional charger depends on the vehicle being plugged in for a long, predictable duration — which is precisely the dwell profile that the bay-hour analysis says destroys parking revenue.</p><p>The two markets therefore want the same thing from opposite directions. V2G needs long dwell and values it; parking needs short dwell and is penalised by it. A site that can sell grid services during a four-hour dwell has, for the first time, a way to monetise the duration itself rather than the electrons — which is the repricing this market has been missing.</p><h3>What is not coming</h3><p>Wireless inductive charging at parking assets is technically proven and commercially absent; the efficiency penalty and the retrofit cost of embedding pads in existing decks do not clear the bar. Robotic charging arms are in pilot and solve a real problem — the cable — at a cost per bay that exceeds the bay's annual revenue in most assets. Neither will move the 2025–2033 numbers in this report.</p><p>The innovation that matters is cheaper than both: put the right number of kilowatts in the ground, and contract for the hour.</p>"
  market_risk_content: "<h2 id=\"section-mr\">11. Market Risk</h2><p>The risks in this market are not the ones usually listed. Demand is not the problem — 141 million charging sessions were completed in the United States in 2025 alone. The risks are contractual, physical and regulatory, in that order.</p><h3>Utilisation risk, and why it is asymmetric</h3><p>Q-Park's disclosed figures imply <strong>2,900 kWh per operated port per year</strong> — about eight kilowatt-hours a day, or <strong>3.01 per cent</strong> capacity utilisation at an 11 kW rating. At that level, a one percentage point improvement in utilisation is a 33 per cent improvement in throughput. The operating leverage is extraordinary in both directions.</p><p>The asymmetry matters because the cost base is largely fixed. A connection capacity charge is paid whether the port is used or not; a management platform subscription is per port; maintenance is scheduled by device. Revenue varies with utilisation and cost does not. A site that misses its demand forecast by a third does not lose a third of its profit — it loses most of it.</p><p>The offsetting consideration is that the low utilisation figure is not evidence of failure but of availability. A port that is used 3 per cent of the time is available 97 per cent of the time, which is the product being sold. The risk is not that utilisation is low; it is that nobody has priced availability.</p><h3>Grid connection and the capacity trap</h3><p>The New York Department of Public Service's December 2025 filing is the clearest published description of this risk. Where distribution capacity is constrained, upgrades \"can take from one to ten years, depending on the asset in question, and can cost several million dollars.\" EV load is characterised as power-dense with a low load factor — average demand a small fraction of nameplate — which is exactly the profile that makes a utility reluctant to reserve capacity.</p><p>For a parking operator the exposure is threefold. A committed connection capacity that exceeds need is a permanent cost. A deferred connection is a deferred revenue stream. And a site that guesses wrong on power rating cannot easily change it — the trench, the cable and the protection are sized for the original decision.</p><p>Pheonix treats this as the single largest execution risk in the market, ahead of demand, because it is the one that cannot be fixed by commercial action after the fact.</p><h3>The stranded AC estate</h3><p>If regulatory attention, capital and pricing innovation all migrate toward high power — as the current direction of travel suggests — then a large installed base of 7–11 kW posts at short-stay assets becomes a stranded asset in the specific sense that it cannot be repriced upward. The hardware is fine. The connection is fine. The problem is that dwell is set by physics and the tariff cannot recover the opportunity cost of a four-hour occupancy in a car park that turns over every ninety minutes.</p><p>The scale of that exposure is visible in the UK data: <strong>56 per cent</strong> of 86,021 devices are in the 3–8 kW band, and only 20 per cent are at 50 kW or above. If the estate's economic centre of gravity moves to fast charging, the majority of the installed base is on the wrong side of the 8.26-fold gradient.</p><p>The counter-argument is strong and should be stated: in assets where the alternative use of the bay is worthless — overnight, workplace, long-stay airport, residential — a slow charger is the correct technology at any utilisation, because there is no opportunity cost to recover. The stranded-asset risk is concentrated in short-stay, high-tariff, high-demand assets, not across the estate.</p><h3>Regulatory cost and scope creep</h3><p>The compliance burden per device has risen sharply and is still rising. The UK requires p/kWh price display, contactless above 8 kW for new installations, 99 per cent reliability across rapid networks with published compliance and an annual report to the Secretary of State, a free 24/7 staffed helpline advertised at every point, OCPI open data, and roaming through at least one provider. AFIR requires ad hoc access, comparable and non-discriminatory pricing, and from 1 January 2027 card-based payment at all public points above 50 kW along the TEN-T network and at safe and secure parking areas.</p><p>Each obligation is individually modest. Collectively they convert the software and services layer from a margin centre into a cost of doing business, and they fall most heavily on small operators. That is a consolidation force, and it is already visible in the data: operators are growing device counts faster than they are growing revenue per device.</p><h3>Demand risk is real but differently shaped than assumed</h3><p>The standard worry is that EV adoption slows and the chargers have no customers. The evidence does not support that as the primary risk. Global public charging points passed <strong>five million</strong> at the end of 2024 and added 1.3 million in one year; US fast charging grew 30 per cent in 2025 to over <strong>70,000 ports</strong> with 141 million sessions completed; UK devices grew 23 per cent in a year.</p><p>The real demand risk is <strong>distributional</strong>. Demand may fail to arrive at specific sites rather than in aggregate — a car park with the wrong dwell profile, a town with too little EV penetration, an asset whose catchment charges at home. Aggregate growth can coexist with severe local under-utilisation, and in this market it does.</p><h3>Technology and obsolescence risk</h3><p>Charging hardware is deflationary and improving. Ultra-fast prices fell roughly 20 per cent in two years, and 150 kW posts are becoming the default at sites that would have specified 50 kW in 2022. A site built to a 2023 specification will look over-capitalised and under-powered by 2028. The mitigating factor is that the civil and connection works — the expensive, slow, hard-to-change part — are power-agnostic up to a point. A site that over-sizes its connection and under-sizes its cabinets can be upgraded cheaply. A site that does the reverse cannot.</p><h3>Competitive and contractual risk</h3><p>The parking industry's structural weakness — that an operator owns a term granted by a procuring authority, not an asset — is examined in the companion concession report and applies here with a specific twist: charging assets have a shorter economic life than the leases they sit under, and a well-built charging portfolio can outlive its host contract. On renewal, the incumbent has more to lose than the asset does.</p><p>Pheonix rates overall market risk as <strong>moderate</strong>, with the distribution heavily skewed: <strong>low</strong> at long-stay assets with self-operated ports, <strong>high</strong> at short-stay assets with landlord-model arrangements and AC-only infrastructure. That is not a market-level judgement. It is a site-level one, and the market average conceals more than it reveals.</p>"
  regulatory_landscape_content: "<h2 id=\"section-rl\">12. Regulatory Landscape</h2><p>Two regimes govern this market, and they share a structural flaw: both were written for fast charging, and both are being applied to an estate that is mostly slow.</p><h3>The European Union: obligation-led</h3><p>Regulation (EU) 2023/1804, the Alternative Fuels Infrastructure Regulation, is the most consequential instrument in this market because it sets a quantity rather than funding a project.</p><p><strong>Article 3</strong> requires Member States to ensure that at the end of each year from 2024, publicly accessible recharging stations deliver a total power output of <strong>at least 1.3 kW for every light-duty battery electric vehicle</strong> registered in their territory, and <strong>0.80 kW for every plug-in hybrid</strong>. The requirement is cumulative and national. A Member State that falls short has no option but to add capacity, and the cheapest capacity to add is at an existing parking asset.</p><p>There is an escape clause: where the BEV share of the fleet reaches at least 15 per cent and a Member State can demonstrate that the requirement is discouraging private investment, it may request authorisation to apply lower requirements. As of the sources reviewed for this report, no such authorisation had been granted.</p><p><strong>Article 5</strong> governs the commercial interface, and three provisions matter here.</p><p><em>Ad hoc access.</em> Operators must allow recharging on an ad hoc basis, and at points deployed from 13 April 2024 this must be possible using a widely used payment instrument — card readers, contactless, or for points below 50 kW a QR-code based internet payment. From <strong>1 January 2027</strong>, all public points at 50 kW or above on the TEN-T road network and at safe and secure parking areas, including those deployed before April 2024, must offer card or contactless payment.</p><p><em>Pricing.</em> Prices must be \"reasonable, easily and clearly comparable, transparent and non-discriminatory,\" with no discrimination between end users or between mobility service providers, and any differentiation must be \"proportionate and objectively justified.\"</p><p><em>Occupancy fees.</em> At points of 50 kW and above, the ad hoc price must be based on price per kWh, and operators <strong>may additionally charge an occupancy fee as a price per minute to discourage long occupancy</strong>, with both displayed before the session starts.</p><p>That last provision is the only place in either regime where the law explicitly recognises that a charging bay's time has value. It is scoped above 50 kW. The overstay problem — which Q-Park names in its own report — is worst below 50 kW.</p><h3>The United Kingdom: transparency-led</h3><p>The Public Charge Point Regulations 2023 came into force on 24 November 2023 and apply across the United Kingdom to charge points accessible to the public, including those providing electricity free of charge.</p><table><thead><tr><th>Requirement</th><th>Scope</th><th>Deadline</th></tr></thead><tbody><tr><td>Pricing transparency in p/kWh, with all fixed fees included</td><td>All public charge points</td><td>Immediate (24 November 2023)</td></tr><tr><td>Contactless payment</td><td>New points 8 kW+ and existing points 50 kW+</td><td>24 November 2024</td></tr><tr><td>99% reliability, published annually with a report to the Secretary of State</td><td>Rapid charge point networks</td><td>24 November 2024</td></tr><tr><td>Free 24/7 staffed telephone helpline, advertised at every point</td><td>All public charge points</td><td>24 November 2024</td></tr><tr><td>Open data via OCPI, machine-readable, available to network operators and government</td><td>All public charge points</td><td>24 November 2024</td></tr><tr><td>Payment through at least one roaming provider</td><td>All public charge points</td><td>24 November 2025</td></tr></tbody></table><p>The pricing rule is the most interesting for this report. Where charging is sold alongside parking in a single combined price, \"the portion of this price that relates to charging must be clearly displayed separately in p/kWh.\" That is an explicit acknowledgement that the industry bundled two products with different cost drivers, and that the bundle concealed which one was expensive.</p><p>The reliability rule is the most revealing. A 99 per cent availability obligation across a rapid network, measured annually and published, is a genuine constraint. It does not apply to the 56 per cent of the estate in the 3–8 kW band. Nor does the contactless obligation below 8 kW. The regulation is a rigorous regime for the fast fifth of the estate and a light-touch one for the slow majority — which is the majority that determines how long a bay is occupied.</p><h3>The United States: programme-led, and under-delivering</h3><p>NEVI was allocated <strong>USD 5 billion</strong> under the Bipartisan Infrastructure Law to build fast charging along designated corridors. By the end of 2024, roughly <strong>USD 30 million</strong> had been spent on charging points in operation. In 2025, states spent about <strong>USD 94 million of the USD 4.4 billion available</strong>, delivering <strong>497 ports at 99 locations</strong> — approximately 3 per cent of the <strong>18,041</strong> fast ports added nationally.</p><p>The programme's design explains its performance. Corridor charging has structurally low utilisation because the corridor exists for the minority of journeys that are long. Parking assets have the opposite profile: the customer arrives regardless. The US funded the harder site type and the private market grew 30 per cent without it.</p><h3>The gap: no instrument prices the bay</h3><p>Across both regimes, the obligations run to availability, payment, transparency and data. None of them prices the duration of occupancy except AFIR's optional occupancy fee, and that instrument is confined to high power.</p><p>The consequence is a market in which the legally mandated product is availability, the commercially valued product is throughput, and the scarce resource — the bay-hour — has no price. An operator complying fully with both regimes can still be destroying value at every busy hour of the day, and nothing in the regulatory framework would tell them.</p><h3>What would change the picture</h3><p>Three developments would materially alter the 2025–2033 trajectory.</p><p><strong>An occupancy-fee obligation below 50 kW.</strong> If AFIR's per-minute occupancy mechanism were extended to slow charging — or adopted voluntarily by operators as a standard term — the AC estate would acquire a repricing tool it currently lacks. The technical barrier is trivial; the political one is that slow charging is where equity concerns are sharpest, since residents without driveways depend on it.</p><p><strong>Bay-level metering and disclosure.</strong> The UK already requires p/kWh separation when charging is bundled with parking. Extending that to require disclosure of the bay's occupancy cost would make the trade-off visible to the driver and to the operator's own management accounts.</p><p><strong>Flexibility markets that pay for interruptibility.</strong> A four-hour 11 kW session is inherently interruptible. If network operators and aggregators pay for that flexibility at a level that reflects its value, the AC estate acquires a second revenue stream and the case for slow charging stops depending on energy margin alone.</p><p>Pheonix rates regulatory complexity <strong>high</strong> and the approval pathway <strong>multi-jurisdictional</strong>. Both are correct descriptions of the compliance burden. Neither captures the more important point: the regulation has arrived, the repricing has not, and the gap between them is where this market's returns will be decided.</p>"
  faq_question_1: "How large is the EV charging at parking assets market?"
  faq_answer_1: "Pheonix Research sizes the market at USD 25.00 billion in 2025, rising to USD 63.60 billion by 2033 at a compound annual growth rate of 12.38 per cent. The market covers equipment and installation at parking assets (USD 14.60 billion in 2025), electricity resold through those ports (USD 7.48 billion) and the software, management and O&M layer (USD 2.92 billion). Home charging and corridor charging not sited at a parking asset are excluded."
  faq_question_2: "Why does installing a charger lengthen parking dwell?"
  faq_answer_2: "Because the power rating sets the duration of the charge, and the duration is the dwell. A 44 kWh top-up — roughly a seventy per cent replenishment of a mid-size EV — takes 6.29 hours at 7 kW, 4.00 hours at 11 kW, 0.88 hours at 50 kW and 0.15 hours at 300 kW. Most AC posts are capped further by the vehicle's onboard charger, typically 11 kW. The bay that served six ninety-minute visits in a ten-hour day now serves two and a half four-hour visits."
  faq_question_3: "What is the occupancy fee under AFIR and why does it matter?"
  faq_answer_3: "Article 5(4) of Regulation (EU) 2023/1804 permits operators of publicly accessible recharging points at 50 kW and above to charge an ad hoc price per kWh and, in addition, an occupancy fee priced per minute to discourage long occupancy of the charging point. It matters because it is the first regulatory instrument that prices the bay-hour rather than the electron — but it applies only above 50 kW, while overstay is worst at the slow end of the estate."
  faq_question_4: "Why has the parking industry not repriced charging bays?"
  faq_answer_4: "Because the party that owns the bay and the party that earns the energy margin are usually different companies, and the contract between them is a space rental rather than a revenue share. Q-Park self-operates 78 per cent of its charge points and books the energy revenue; APCOA's disclosed model is partnership, taking a location-dependent space rental fee while the partner funds and operates the infrastructure. A landlord has no access to the energy margin and therefore no reason to reprice the hour."

global_schema:
  organization:
    "@id": MIWS-root#organization
    "@type": Organization
    url: "https://www.pheonixresearch.com/"
    name: Pheonix Research
  website:
    "@id": MIWS-root
    "@type": WebSite
    url: "https://www.pheonixresearch.com/"
    name: Pheonix Research
  api:
    "@id": MIWS-root#api
    "@type": WebAPI
    url: "https://www.pheonixresearch.com/"

graph:
  node_id: MIMR-node_d334792
  graph_node_endpoint: "https://graph.pheonixresearch.com/api/v1/query/live/node/MIMR-node_d334792"
  graph_snapshot: "https://graph.pheonixresearch.com/api/v1/read/live/graph"
  graph_exclusions: "https://graph.pheonixresearch.com/api/v1/read/live/exclusions"
  graph_meta: "https://graph.pheonixresearch.com/api/v1/read/live/meta"
  graph_bundle: "https://graph.pheonixresearch.com/api/v1/read/live/bundle"

discovery:
  discovery_json: "https://www.pheonixresearch.com/.well-known/pheonix-discovery.json"
  llms_txt: "https://www.pheonixresearch.com/llms.txt"
  sitemap: "https://www.pheonixresearch.com/sitemap.xml"
---
# Global EV Charging at Parking Assets Market Report, Size, Share and Forecast 2026–2033: Charging Turns a 90-Minute Bay Into a Four-Hour Bay — and Nobody Has Repriced It

- **Market Size (Base Year):** USD 25.00 Billion
- **Forecast Value:** USD 63.60 Billion
- **CAGR:** 12.38%
- **Forecast Period:** 2026 - 2033
- **Coverage:** Global - Global

## Executive Summary

Global spend on EV charging delivered through parking assets reaches USD 25.00 billion in 2025 and USD 63.60 billion by 2033, a CAGR of 12.38 per cent. But the composition is shifting faster than the total: equipment and installation fall from 58.4 to 40.7 per cent of the market while electricity resold rises from 29.9 to 39.8 per cent and software and operations from 11.7 to 19.5 per cent. Of the USD 38.60 billion added by 2033, energy supplies 46.2 per cent and the physical build only 29.3 per cent. The market's defining constraint is physical, not financial. A 44 kWh top-up takes 6.29 hours at 7 kW, 4.00 hours at 11 kW and 0.15 hours at 300 kW — so the power rating a site selects determines how long the bay is occupied. Holding tariff and energy margin constant, revenue per available bay-hour rises from USD 4.84 at 7 kW to USD 39.11 at 300 kW, a 8.26x gradient generated entirely by dwell. The industry has built the slow end: 56 per cent of UK public devices are 3-8 kW and only 20 per cent are 50 kW or above. Q-Park's 7,310 operated ports consumed 21.2 GWh in 2025, or 2,900 kWh per port per year — a 3.01 per cent capacity utilisation at 11 kW. The repricing instruments now exist, including AFIR's occupancy fee per minute above 50 kW and the UK's p/kWh transparency rules, but both are scoped to the fast minority that already turns over quickly.

## Market Report

## 1. Market Snapshot

Global spend on electric vehicle charging delivered through parking assets reached **USD 25.00 billion in 2025** and is forecast to reach **USD 63.60 billion by 2033**, a compound annual growth rate of **12.38 per cent**. That number is real, and it is the least interesting number in this report.

The interesting number is the split underneath it. In 2025, **58.4 per cent** of everything spent on charging at parking assets was capital — equipment and installation. By 2033 that share falls to **40.7 per cent**. Over the same window, electricity resold through those same ports rises from **29.9 per cent to 39.8 per cent** of the market, and the software and operations layer that sits between the hardware and the driver rises from **11.7 per cent to 19.5 per cent**. Of the **USD 38.60 billion** added to this market between 2025 and 2033, energy sales supply **46.2 per cent**, software and operations supply **24.6 per cent**, and the physical build supplies **29.3 per cent**.

This is the profile of a market that is transitioning from a construction phase into an operating phase. The asset is being finished. The question that follows is who gets paid for using it.

 | Segment |  | 2025 (USD bn) |  | 2033 (USD bn) |  | CAGR |  | Share 2025 |  | Share 2033 |  | Share of increment |

 | Equipment and installation |  | 14.60 |  | 25.90 |  | 7.43% |  | 58.4% |  | 40.7% |  | 29.3% |

 | Electricity resold through parking-asset ports |  | 7.48 |  | 25.30 |  | 16.45% |  | 29.9% |  | 39.8% |  | 46.2% |

 | Software, management and O&M |  | 2.92 |  | 12.40 |  | 19.81% |  | 11.7% |  | 19.5% |  | 24.6% |

 | **Total** |  | **25.00** |  | **63.60** |  | **12.38%** |  | **100.0%** |  | **100.0%** |  | **100.0%** |

Market definition matters here, because this is not the charging infrastructure market and it is not the parking market. It is the value transacted at the intersection: capital spent putting charging equipment into bays that already exist, electricity sold through those bays, and the software and service layer required to bill for it. Home charging is excluded. Corridor and forecourt charging not sited at a parking asset is excluded. Fleet depot charging is included only where the depot is operated as a parking asset open to third-party vehicles.

The model is built from disclosed company data, national statistics and enacted regulation, supplemented by a primary research programme: 27 semi-structured interviews across six markets, nine conference-floor interviews, one closed roundtable with parking and charge point operators, and 41 survey responses. Where a number is a Pheonix construction rather than a sourced figure — the bay-hour table in Section 3 is the principal example — the text says so in the sentence that carries it.

Figure 1 — The market at a glance. Capital falls from 58.4 to 40.7 per cent of total value while electricity resold supplies 46.2 per cent of the USD 38.60 billion increment.

### Volume and utilisation

The installed base of charging ports at parking assets grows from **3.40 million at the end of 2025 to 9.90 million at the end of 2033**, a CAGR of **14.29 per cent** — faster than value, because value per port falls. Energy delivered through those ports rises from **18.70 TWh to 72.30 TWh** at **18.42 per cent**. Energy per port, the only honest measure of utilisation available at this level of aggregation, rises from **5,500 kWh to 7,303 kWh** a year, a CAGR of **3.61 per cent**.

Value captured per installed port per year falls from **USD 7,350 to USD 6,420**. That is not a market shrinking. It is a market in which the expensive part — the civil works, the connection, the cabinet, the commissioning — is paid once and then deflates, while the recurring part takes longer to mature. Anyone modelling this market as a hardware market with an energy tail has the shape inverted.

### The finding

Then there is the physical fact that governs everything else.

A parking bay earns by the hour. Its capacity is trading hours multiplied by tariff, and its utilisation depends on how quickly a car leaves. A bay used for a ninety-minute shopping trip can serve six or seven vehicles in a ten-hour day. Put an 11 kW charging post in it and the arithmetic changes completely: a 44 kWh top-up — roughly a seventy per cent replenishment of a mid-size EV — takes **four hours** at 11 kW. The bay now turns over two and a half times.

At **22 kW** the same 44 kWh takes two hours. At **50 kW** it takes fifty-three minutes. At **150 kW**, eighteen minutes. At **300 kW**, nine.

Which means the power rating a site chooses is not primarily an engineering decision. It is a decision about how long the bay will be occupied, and therefore about what the bay can earn. Hold the parking tariff and the energy margin constant and compute revenue per available bay-hour across that ladder and the figure rises from **USD 4.84 at 7 kW to USD 39.11 at 300 kW** — a **8.26×** gradient, generated entirely by dwell.

The industry has, on the whole, built the slow end. In the United Kingdom, **56 per cent** of public charging devices at 1 October 2025 sat in the 3–8 kW band and only **20 per cent** were rated 50 kW or above. Q-Park operated **7,310** charge points in 2025 and consumed **21.2 GWh** across them — **2,900 kWh per port per year**, which at an 11 kW rating is a capacity utilisation of **3.01 per cent**.

That is the subject of this report. Charging has been installed into parking assets without repricing either the bay or the electron, and the two numbers that would have to move — dwell and tariff — are owned by different parties who do not share a ledger.

## 2. Executive Summary

Three findings carry this report, and they build on each other.

### First: the value is migrating off the hardware and onto the hour

Equipment and installation spend grows at **7.43 per cent**. Electricity resold grows at **16.45 per cent**. Software and operations grow at **19.81 per cent**. The divergence is not a pricing effect — it is a mix effect working in two directions at once. Hardware is deflating: ultra-fast charger prices fell by roughly **20 per cent between 2022 and 2024** according to the IEA, and the same source records that unit economics improve as volumes rise. Meanwhile the installed base is compounding at 14.29 per cent and each port is delivering more energy every year — **5,500 kWh to 7,303 kWh** over eight years, or 3.61 per cent annually.

So the market's growth is not a build story. It is a maturation story. The capital is largely committed; what has not yet been solved is the operating model that converts the installed base into recurring revenue.

### Second: the power rating is a commercial decision wearing an engineering uniform

Dwell time is set almost entirely by charger power. At 11 kW — the rating Q-Park uses across most of its Belgian estate, chosen because it suits "the hours you park" — a useful charge takes half a working day. At 7 kW it takes more than six hours.

This is not a defect; for a long-stay urban garage it is correct. The car is there for four hours anyway. The charger is a service enhancement that costs the operator relatively little and adds a reason to choose that facility. But it is a *parking* product, not an energy product: its value is in attracting dwell, and its return is measured in occupancy, not in kilowatt-hours.

The same charger in a short-stay, high-turnover asset is a different instrument entirely, and a worse one. It converts a bay that could serve six vehicles a day into one that serves two, and it does so at the moment when demand is highest. A Q-Park report states the operational version of this problem plainly: an electric vehicle "may also occupy an EV charging point even when it is fully charged," creating "an operational as well as a commercial challenge."

Underneath all of it sits a single number. Hold tariff and energy margin constant, vary only the power rating, and revenue per available bay-hour runs from **USD 4.84 to USD 39.11**. The gradient is 8.26×. Nothing else in this market has that range.

### Third: the repricing tools now exist, and are aimed at the wrong half of the estate

Regulation has quietly handed the industry the instruments it needs. The EU's Alternative Fuels Infrastructure Regulation permits operators of public points at 50 kW and above to levy an occupancy fee priced per minute, explicitly to discourage long occupancy, provided the ad hoc price per kWh is displayed. The UK's Public Charge Point Regulations 2023 require the maximum session price in pence per kWh to be displayed before charging begins, and explicitly allow charging to be sold combined with parking provided the charging component is separated out in p/kWh.

Both are repricing instruments. Both are scoped to fast charging.

The UK estate is **56 per cent** in the 3–8 kW band and only **20 per cent** at 50 kW or above — and the 99 per cent reliability obligation falls on rapid networks only. The regulation covers the minority of devices that already turn over quickly, and leaves untouched the majority that determine whether a bay is occupied for one hour or six.

Figure 3 — Revenue per available bay-hour by charger rating. The 8.26× gradient comes entirely from dwell, not from the electricity.

### What follows, by reader

**For parking operators:** the decision is not whether to install charging but whether to be the charge point operator. Q-Park self-operates 78 per cent of its ports and grew charging revenue 45.6 per cent in 2025. APCOA partners — bp pulse at Rotterdam Westblaak, Wien Energie in Austria — and takes a space rental plus visibility. Both are coherent. They are not the same business, and the second one does not participate in the 16.45 per cent.

**For charge point operators:** site acquisition is becoming a dwell-time negotiation. The sites worth paying for are the ones where four hours of occupancy is not a cost, which means long-stay, destination and airport assets — not the short-stay kerbside the industry has spent a decade arguing about.

**For investors:** the hardware multiple and the energy multiple are now different multiples attached to the same site. A portfolio valued on installed ports is being valued on the wrong denominator.

**For equipment suppliers:** the addressable volume is growing at 14.29 per cent while the addressable value grows at 7.43 per cent. Share gains will have to come from mix — DC and high-power — not from unit growth.

## 3. What This Market Actually Sells

Ask what a parking operator sells and the answer is an hour of a defined piece of ground. Ask what a charge point operator sells and the answer is a kilowatt-hour. Both answers are correct and neither describes this market, because at a parking asset the two products are sold from the same square metre, to the same customer, at the same moment, by two parties who frequently are not the same company.

The unit that reconciles them is the **bay-hour**. Everything in this report follows from it.

### The dwell arithmetic

A charge delivers energy at a rate set by the vehicle's onboard converter and the post's rating, whichever is lower. For most current passenger EVs, the onboard charger caps AC intake at 11 kW regardless of what the post can supply. This is the detail that most site appraisals miss: fitting a 22 kW AC post to a vehicle with an 11 kW onboard charger delivers 11 kW, and pays for hardware that will never be used.

Take a 44 kWh top-up — about seventy per cent of a 60 kWh usable pack, which is what a driver arriving at a destination charger typically wants. At 7 kW it takes **6.29 hours**. At 11 kW, **4.00 hours**. At 22 kW, 2.00 hours. At 50 kW, **0.88 hours**. At 150 kW, 0.29 hours. At 300 kW, **0.15 hours**.

Now price the bay. Assume a parking tariff of USD 4.00 per hour and an energy margin to the site of USD 0.12 per kWh — deliberately conservative, and both figures are Pheonix constructions for illustration, not observed market rates. The session earns USD 5.28 of energy margin wherever it happens. The parking revenue is the dwell multiplied by the tariff. Divide the total by the hours the bay was occupied and the result is what the square metre earned per hour of its life.

 | Charger rating |  | Dwell for 44 kWh |  | Parking revenue |  | Energy margin |  | Revenue per bay-hour |

 | 7 kW |  | 6.29 h |  | USD 25.14 |  | USD 5.28 |  | **USD 4.84** |

 | 11 kW |  | 4.00 h |  | USD 16.00 |  | USD 5.28 |  | **USD 5.32** |

 | 22 kW |  | 2.00 h |  | USD 8.00 |  | USD 5.28 |  | **USD 6.64** |

 | 50 kW |  | 0.88 h |  | USD 3.52 |  | USD 5.28 |  | **USD 10.00** |

 | 150 kW |  | 0.29 h |  | USD 1.17 |  | USD 5.28 |  | **USD 22.00** |

 | 300 kW |  | 0.15 h |  | USD 0.59 |  | USD 5.28 |  | **USD 39.11** |

Figure 2 — The dwell ladder. Charger power sets dwell, dwell sets the number of times a bay can be sold in a day, and the tariff was never rebuilt around it.The gradient is **8.26×**, and none of it comes from the electricity. It comes entirely from the denominator.

This is why the same technology reads as a good investment in one asset and a poor one in another. In an airport long-stay car park, the car is there for a week; a four-hour charge is free. In a city-centre short-stay garage at Saturday lunchtime, a four-hour charge is the most expensive thing that will happen to that bay all week. The charger is identical. The economics are opposite.

### The utilisation that isn't there

Q-Park's 2025 CSR report gives the only clean public measurement of parking-asset charging utilisation in the industry. The company operated **7,310** charge points and recorded **21.2 GWh** consumed across them. That is **2,900 kWh per operated port per year** — about eight kilowatt-hours a day, or roughly forty minutes of charging at 11 kW.

Expressed as capacity utilisation at an 11 kW rating, across 8,760 hours, the figure is **3.01 per cent**.

Three per cent is not a failure. It is the correct number for an asset whose purpose is to be available when a customer wants it, in the same way a hotel's occupancy is not a hundred per cent. But it has two consequences that the industry has not priced. The first is that a port rated 11 kW and used 3 per cent of the time is, from the grid's perspective, a request for 11 kW of capacity to serve an average load of 0.33 kW. The second is that the marginal cost of the next kilowatt-hour delivered through that port is close to zero — the capital is sunk, the connection is paid for, the cabinet is energised — which means the correct commercial response is to fill it, and the correct pricing response is to price the *hour*, not the electron.

Almost nobody does. The dominant retail model remains a per-kWh tariff plus, sometimes, a fixed session fee. That structure charges for the thing that is nearly free and gives away the thing that is scarce.

### The overstay problem, named by an operator

Q-Park's own disclosure is unusually candid on this point. The report notes that an EV "not only occupies a parking space, but it may also occupy an EV charging point even when it is fully charged," and that offering seamless parking means allowing customers to leave the car where it is even though the battery is topped up. The company describes this as "an operational as well as a commercial challenge" requiring "ample EV CPs available for our EV customers."

This is the bay-hour problem in a sentence. After the charge completes, the port delivers nothing and the bay earns only parking revenue — while denying a charging customer access. The asset is simultaneously under-used and unavailable, which is the definition of a mispriced capacity good.

The regulatory answer already exists in Europe. AFIR Article 5(4) permits operators of public points at 50 kW and above to charge an occupancy fee as a price per minute "to discourage long occupancy," alongside the ad hoc price per kWh. The instrument is there. It is scoped above 50 kW. The overstay problem is worst below 50 kW.

### What the market sells, restated

This market does not sell charging equipment, and it does not sell kilowatt-hours. It sells **the right to occupy a defined piece of ground for a duration that a charger has determined**. The equipment sets the duration. The tariff monetises it. The software arbitrates it. And the operator — the party that owns the ground and bears the opportunity cost of the duration — is, in most contractual structures, the party with the least control over it.

## 4. Demand Drivers

Four forces are pushing charging into parking assets, and one force is pulling it back out. Understanding which is which determines whether a site is a good investment or an expensive gesture.

### 1. The charging ratio is a policy obligation, not a market signal

Under the EU's Alternative Fuels Infrastructure Regulation, Member States must ensure that at the end of each year from 2024, publicly accessible recharging provides **at least 1.3 kW of total power output for every light-duty battery electric vehicle registered in their territory**, and 0.80 kW for every plug-in hybrid. This is the single most consequential piece of regulation in this market, because it converts charging capacity into a legal obligation measured per vehicle, and it makes parking assets the cheapest place to discharge it.

A parking asset already has land, access, lighting, security and a billing relationship. The marginal cost of adding a connection there is a fraction of the cost of creating a new site. Where a Member State is short of its 1.3 kW obligation — and several are — the fastest route to compliance runs through existing car parks.

Europe finished 2024 with just over **one million** public charging points, up more than 35 per cent, and an average public charging capacity of **2.6 kW per electric light-duty vehicle**. That is comfortably above the obligation in aggregate. The problem is distributional: capacity per vehicle varies enormously between Member States, and the obligation is national.

### 2. Destination charging is a footfall instrument, and is bought as one

Roughly half the UK estate is classified as "destination" charging — **41,390 devices, 48 per cent** of all public devices at 1 October 2025. This is the retail, leisure and workplace segment, and it is bought for a different reason than the rest.

A supermarket does not install chargers to sell electricity. It installs them to secure a longer visit from a higher-spending customer. The charger's return is measured in basket size and dwell, not in kilowatt-hours. On that logic, a slow charger is better than a fast one: an 11 kW post guarantees a two-to-four-hour visit, a 150 kW post guarantees twenty minutes.

This is why the AC estate keeps growing despite poor energy economics. In the UK, the 3–8 kW band added enough devices in the year to 1 October 2025 to remain **56 per cent** of a stock that itself grew **23 per cent** to **86,021** devices. If slow charging were failing commercially, that share would be falling. It is not.

### 3. Workplace and depot charging is the quiet volume

The IEA's projections make the structural point clearly: in the Stated Policies Scenario, around 150 million charging points are added globally between 2025 and the end of 2030, and almost two-thirds of those are home chargers, with 30 per cent "other private chargers" and only 8 per cent public. The "other private" category is workplace, fleet and depot — and much of it sits in parking assets.

Workplace charging has the best utilisation profile in the industry, because dwell is eight hours and predictable. A 7 kW post used for six hours a day is at 75 per cent utilisation on a working day — against 3 per cent for the public destination estate. The economics are not comparable, and yet the hardware is identical.

### 4. Fleet electrification forces depot charging into the parking asset

Light commercial fleets return to base and charge overnight. Where the base is a depot with a gate and a barrier, it is structurally a parking asset. The charging requirement is high-energy and low-power — 60 to 100 kWh per vehicle per night — which at 7–22 kW is a six-to-ten-hour dwell over a period when the bay has no alternative use. This is the one segment where slow charging is unambiguously correct, because the opportunity cost of the bay overnight is close to zero.

### The force pulling the other way: public subsidy is not delivering

The US National Electric Vehicle Infrastructure programme is the clearest available evidence that capital subsidy does not create this market.

NEVI was allocated **USD 5 billion** to build fast charging along corridors. By the end of 2024, according to the IEA, only around **USD 30 million** had been spent on charging points then in operation. Across 2025 the programme delivered **497 new DC fast-charging ports at 99 locations** — about **3 per cent** of the **18,041** ports added nationally that year — while states spent roughly **USD 94 million of the USD 4.4 billion made available**.

The market grew anyway. US public DC fast charging passed **70,000 ports** at the end of 2025, up about 30 per cent, and completed roughly **141 million charging sessions** during the year. The growth came from private capital, at sites chosen on commercial logic.

The lesson for parking operators is uncomfortable and useful: the demand is real, but it is not being manufactured by policy. Sites that work do so because a car is going to be parked there anyway.

### What demand actually looks like

Global public charging points passed **five million** at the end of 2024, having added **1.3 million** in that year alone — an increase of more than 30 per cent, and roughly equal to the entire global stock in 2020. The United States closed 2024 at just under **200,000** public points, up 20 per cent. India installed about **40,000** new public chargers, reaching **75,000**. The UK reached **86,021** by October 2025 and has stated an ambition of **300,000** by 2030 — about three and a half times the 2024 stock.

Those are the demand-side numbers. The supply-side question — whether the assets exist to host them at a price that works — is the subject of the next section.

## 5. Segment and Product Split

The market divides three ways, and the divisions are not cosmetic: each has a different cost structure, a different owner and a different margin shape.

### Equipment and installation — USD 14.60bn in 2025, 7.43 per cent to 2033

This is the layer that gets quoted, and it is the layer with the least pricing power. It splits into hardware and civil works, and the civil works are where the variance lives.

The published cost ranges for DC fast charging equipment are extraordinarily wide. A 2025 study in *Transportation* by Alan Jenn, drawing on 5.6 million charging events across roughly 1,300 DC fast chargers in California, records deployment costs across the literature from **USD 30,000 on the low end to as high as USD 285,000**. That spread is not confusion; it is the difference between a site with capacity at the boundary and a site that needs a new connection.

For AC, the hardware is a commodity — a wall box or a post — and the cost is dominated by cabling, trenching, earthing, protection and the distribution board. In an existing car park with spare capacity, a 7–22 kW post is a modest incremental cost. In a car park with no spare capacity, it is a substation.

This asymmetry is the reason the equipment segment's growth (7.43 per cent) lags the market. Volume grows at 14.29 per cent; unit prices fall as the mix shifts toward AC and as DC hardware deflates. The IEA records ultra-fast charger prices falling roughly **20 per cent between 2022 and 2024** — and that is the top of the range, which means the deflation is being led by the most expensive product.

### Electricity resold — USD 7.48bn in 2025, 16.45 per cent to 2033

This is the segment that decides whether a site is a business. It is also the segment that is least visible in installed-base statistics, because a port count tells you nothing about how much energy passes through it.

The energy economics of a parking-asset port are unusual. Because the assets are typically grid-connected with a fixed capacity charge, the marginal cost of a kilowatt-hour delivered through an existing port is the wholesale price plus losses. The marginal revenue is the retail tariff. The gap is the gross margin, and it is protected by the fact that the customer is already parked — there is no search cost, no detour, and no competitor within the building.

Q-Park's disclosure shows what happens when that margin starts to work. Charging revenue rose **45.6 per cent in 2025** against a year in which the port count rose 37 per cent and the operated port count rose 55 per cent — meaning revenue per port was roughly flat while volume grew. Energy consumed by operated ports rose **32 per cent to 21.2 GWh**. Revenue growing faster than ports and slower than operated ports is what an estate mid-transition looks like: it is buying ports faster than it is filling them.

The Pheonix model has electricity resold at **USD 0.40 per kWh in 2025 falling to USD 0.35 by 2033** — a deliberate assumption that retail spreads compress as competition and transparency requirements bite. AFIR Article 5(3) requires prices to be "reasonable, easily and clearly comparable, transparent and non-discriminatory." The UK requires the maximum session price in pence per kWh to be displayed before charging starts and prohibits it rising during the session. Both are margin-compression mechanisms in the long run.

### Software, management and O&M — USD 2.92bn in 2025, 19.81 per cent to 2033

The fastest-growing arm, and the least understood. It comprises charge point management systems, roaming and payment processing, network operations, field maintenance, energy management and reporting.

Its growth is driven by regulation as much as by commerce. The UK's Public Charge Point Regulations 2023 require operators to hold and open their data using the Open Charge Point Interface, to publish reliability compliance on their website, to submit an annual reliability report to the Secretary of State, to provide a free 24/7 staffed telephone helpline advertised at every charge point, and to enable payment through at least one roaming provider. Every one of those obligations is a cost that did not exist in 2023 and that scales with the estate.

AFIR adds a parallel layer: ad hoc payment, contactless or card readers from 13 April 2024 for new public points, and from **1 January 2027** card-based or contactless payment at all public points at 50 kW or above on the TEN-T network and at safe and secure parking areas — including points deployed before April 2024.

The consequence is that the software and services layer is becoming a compliance layer, and compliance layers have different economics from software: they are sticky, they are not price-shopped, and they scale with the number of physical devices rather than with the number of users.

 | Layer |  | Who pays |  | Margin shape |  | Exposure |

 | Equipment and installation |  | Site owner or CPO |  | Project margin, one-off |  | Grid capacity, civil cost, hardware deflation |

 | Electricity resold |  | Driver |  | Gross spread per kWh, recurring |  | Utilisation, wholesale price, price transparency |

 | Software, management and O&M |  | CPO or site owner |  | Subscription or per-port fee |  | Regulatory scope creep, device count |

Figure 4 — Three revenue arms, 2025 versus 2033. The physical build grows at 7.43 per cent while electricity resold grows at 16.45 per cent and software at 19.81 per cent.

### The ownership split that matters more than the segment split

Under all three layers sits a single contractual question: does the parking operator own the port or rent the bay to someone who does?

The two models produce completely different participation in the fastest-growing part of the market. Q-Park operated **7,310** of its **9,416** charge points in 2025 — **78 per cent** — and so books the energy revenue. APCOA reported **5,375** charge points installed across its car parks, a **43 per cent** increase, and states an ambition of up to **100,000** new charging stations across more than 13,000 sites by 2035, alongside a separate partnership programme for **1,000 high-power charging stations**. Its disclosed model is partnership: at Rotterdam Westblaak, a 300 kW hub with bp pulse and THORNICO; in Austria, with Wien Energie, where APCOA "defines a location-dependent parking space rental fee" while the partner funds construction, owns the operation and manages billing.

That is a landlord model. It receives rent, not margin. It participates in the capex decision and not in the 16.45 per cent.

Both are defensible. They are not the same market position, and a valuation that treats them as equivalent is wrong by a wide margin.

## 6. Regional Analysis

Charging at parking assets is not one market with regional variations. It is several structurally different markets that happen to use the same hardware.

### China: capacity-led, and already past the installation phase

China holds roughly **65 per cent of global public charging** and 60 per cent of the electric light-duty vehicle stock. It added about **850,000** public charging points in 2024 alone and is projected to reach over **12 million** by 2030 in the Stated Policies Scenario. Estimated public charging capacity per electric LDV is already **over 3 kW** — more than double the EU figure and roughly twice the American one.

Two features matter for the parking-asset segment. First, Chinese EV owners are concentrated in dense cities with limited access to home charging, which makes the shared, off-street parking asset the primary charging location rather than a secondary one. Second, the share of public fast chargers is rising from around **45 per cent in 2024 to over 50 per cent in 2030**. A market moving above half fast is a market where the bay-hour problem is being solved by building fast enough that dwell stops mattering.

### Europe: obligation-led, and therefore uneven

Europe passed **one million** public charging points in 2024, growing more than 35 per cent, and holds **2.6 kW per electric LDV**. The Netherlands has over **180,000** points, Germany **160,000**, France **155,000**. Eleven of 27 Member States grew their public stock by more than 50 per cent in 2024.

The fast-charging estate reached **71,000** in the EU in 2024, up nearly 50 per cent, and about **85 per cent of the EU highway network** had fast chargers at least every 50 km by the end of 2024. That is corridor coverage, not parking-asset coverage, and the two are funded by different mechanisms.

The parking-asset opportunity in Europe is a function of the 1.3 kW per BEV obligation meeting a continent where roughly half the housing stock has no off-street parking. Those two facts together make the municipal and commercial car park the default charging location for a large share of urban drivers — which is why the AC estate is growing fastest in exactly the countries with the oldest housing stock.

### United Kingdom: the most transparent market in the world, and still mispriced

The UK publishes a quarterly census of public charging devices, sourced from Zapmap. At **1 October 2025** there were **86,021** public devices, up **15,979 or 23 per cent** year on year.

 | Cut |  | Devices |  | Share |

 | 3 kW to 8 kW |  | 47,882 |  | 56% |

 | 8 kW to 49 kW |  | — |  | 24% |

 | 50 kW to 149 kW |  | — |  | 9% |

 | 150 kW and above |  | — |  | 11% |

 | Rated 50 kW and above (total) |  | 17,356 |  | 20% |

 | Destination chargers |  | 41,390 |  | 48% |

 | On-street chargers |  | 32,981 |  | 38% |

London added **4,759** devices, the largest absolute increase of any region, at 21.7 per cent; the South East grew fastest in percentage terms at 27.2 per cent; the East Midlands slowest at 12.2 per cent. The government's stated ambition is at least **300,000** public charging stations by 2030 — roughly three and a half times the 2024 stock.

The UK is also the only major market where the charging estate's composition is published in a form that exposes the problem. A market that is 56 per cent slow, 24 per cent medium and only 20 per cent fast is a market in which the modal charging event takes hours, at assets whose tariffs are set per hour. Nobody publishing a charging strategy has reconciled those two facts.

### United States: private capital, corridor-shaped, and thin on power

The US closed 2024 with just under **200,000** public charging points, up 20 per cent, and expanded its fast-charging stock from 40,000 to over **50,000**. By the end of 2025 public DC fast charging had passed **70,000 ports**, having added **18,041** in the year — a 30 per cent increase — with **141 million** charging sessions completed. Average station size rose from 4.1 to **4.5** stalls. California alone holds **16,542** fast ports; California, Texas, Florida, New York and Georgia together hold more than **45 per cent** of the national total.

But the capacity figure is the one that matters: at the end of 2024 there was **less than 1.5 kW of public charging capacity per electric LDV** in the United States, against 2.6 kW in the EU and over 3 kW in China. The US has built a lot of stations and not much power. In a parking-asset context that is a specific handicap, because the assets most suited to charging — long-stay, destination, airport — are precisely the ones where low power produces dwell that the tariff cannot absorb.

NEVI's underperformance compounds it. Roughly **USD 94 million of USD 4.4 billion** available was spent in 2025, delivering 497 ports at 99 locations. The programme was designed for corridor charging, not parking assets, and it has delivered neither at scale.

### India and the rest of the world: the volume is coming, the power is not

India reached **75,000** public charging points at the end of 2024, adding about 40,000 in the year, and is projected to reach around **375,000** by 2030 in the Stated Policies Scenario, supporting fewer than three million electric LDVs. Brazil passed **12,000** public points by early December 2024. Indonesia, Thailand, Malaysia and Vietnam together hold over **24,000** chargers — nine times the 2022 figure.

These markets matter to this report for one reason: they will be built predominantly in shared, off-street parking assets because private off-street parking is scarce. That makes the AC post the default technology, at a power rating that guarantees multi-hour dwell, in assets where the parking tariff is typically low and therefore the opportunity cost of the bay is low too. It is the one set of conditions under which slow charging at a parking asset is straightforwardly correct.

The regional conclusion is uncomfortable: the markets building the fastest are building the technology with the worst bay-hour economics, and it works for them precisely because their parking is cheap. The markets where parking is expensive — London, Rotterdam, San Francisco — are the ones where the same technology destroys value.

## Table of Contents

Market Snapshot
Executive Summary
What This Market Actually Sells
Demand Drivers
Segment and Product Split
Regional Analysis
Competitive Landscape
Value Chain
Investment Activity
Technology and Innovation
Market Risk
Regulatory Landscape

## Competitive Landscape

7. Competitive Landscape
This market has no consolidator, and the reason is structural rather than commercial: the thing being competed for is a lease on somebody else’s ground, and leases expire.
Q-Park finished 2025 with 5,573 parking facilities and 1,237,940 spaces, having acquired 67 facilities with 36,088 spaces during the year. Across that estate it held 9,416 charge points across 398 facilities — up 37 per cent and 52 per cent respectively — of which it operated 7,310. APCOA reported 5,375 charge points installed, a 43 per cent increase, across a network it describes as more than 13,000 sites, and has set an ambition of up to 100,000 charging stations by 2035 alongside a 1,000-station high-power partnership programme. SP+ operates predominantly as an agent, a structure examined at length in the companion concession report on this segment. NCP, Park24 and the Amano group hold national positions of similar shape.
Set those numbers against the size of the installed base. The Pheonix model puts 3.40 million parking-asset charging ports in place at the end of 2025. The two largest European parking operators between them account for well under one per cent of it. Pheonix estimates the top ten operators by installed parking-asset ports at 18 to 22 per cent combined — and that figure should be read as an estimate, not a measurement, because no operator discloses an installed base on a comparable basis.



Operator
Model
Disclosed charging position
Participation in energy margin




Q-Park
Owner-operator, long leases
9,416 ports, 398 facilities, 7,310 operated
Direct on 78% of ports


APCOA
Partnership-led
5,375 ports, +43% in 2025
Indirect — space rental


SP+
Agent
Not separately disclosed
Fee-based


NCP
Owner-operator, national
Not separately disclosed
Mixed


Park24
Owner-operator, Japan-centric
Not separately disclosed
Direct


CPO specialists
Site-host agreements
Multi-site networks
Full where they own the port



The fragmentation has three causes. The first is land: parking capacity is held by tens of thousands of municipalities, landlords, airports and retailers, and each negotiation is local. The second is capital: a charging portfolio is built site by site, and there is no way to acquire scale except by acquiring the underlying parking business. The third, and the one that is specific to this market, is that the two sides of the transaction are different industries. A parking operator’s competence is land, access and enforcement. A charge point operator’s competence is power, uptime and payments. The contract that joins them determines who owns the customer, and neither side wants to give that up.
The two competitive positions
Integrator. The operator funds and runs the ports. Q-Park’s 78 per cent self-operation ratio is the reference case. Advantages: full capture of the energy margin, a single customer relationship, control over tariff design — including the ability to price the bay-hour rather than the electron. Disadvantages: capital intensity, and the obligation to hold operational competence in a business that is not parking. Q-Park’s EV charging revenue rose 45.6 per cent in 2025 and 57.9 per cent in 2024, which is what an integrator’s curve looks like in the growth phase.
Landlord. The operator provides the site and a rental fee; a partner funds and operates. APCOA’s disclosed arrangements follow this shape. At Rotterdam Westblaak, the 300 kW hub is delivered with bp pulse and THORNICO; in Austria, APCOA “defines a location-dependent parking space rental fee” while Wien Energie conducts feasibility, installs, operates and bills. Advantages: no capital, no operational risk, immediate amenity value. Disadvantage: the operator captures a rent that is fixed at contract signature while the partner captures a margin that compounds at 16.45 per cent.
Between those two positions sits a third that the industry has barely begun to price: revenue share. It appears in the sector but rarely as a formula tied to bay-hour economics. Where it exists it is typically a percentage of gross charging revenue, which aligns neither party — the operator still bears the opportunity cost of the bay and is compensated on a basis that ignores it.
Who actually competes with whom
The competitive map is not one map. Three contests run in parallel and only occasionally touch.
For the site. Charge point operators bid against each other for the same car park, and against the operator’s own build option. The bid is essentially a land-rent auction, and it is being won on a metric — rent per port per year — that takes no account of dwell.
For the driver. At a parking asset the driver is captured before arrival, because they are going to that destination anyway. Competition is therefore on reliability and price transparency, not on location. The UK’s 99 per cent reliability obligation on rapid networks and AFIR’s comparability requirements are attempts to make that competition legible.
For the vehicle’s charging event. This is the contest the parking industry underestimates: the same charge can be delivered at home, at work, at a forecourt or at the destination. At a parking asset the operator is competing against the driver’s own driveway, and the asset’s advantage — no cable, no driveway, guaranteed space — is worth more to a driver with no off-street parking than to one with it.
Concentration and its direction
Pheonix expects concentration to increase, but slowly and unevenly. The mechanism is not charging — it is parking M&A. Q-Park’s 67 acquisitions in a single year add 36,088 spaces and, bundled with them, the right to install. Every parking portfolio transaction is also a charging portfolio transaction, whether or not either party models it that way.
The constraint is that acquisitions buy the remainder of a lease rather than its renewal, a structural fact examined in the concession report. A charging portfolio assembled through parking M&A inherits that duration risk, and charging assets have a shorter economic life than the leases they sit under.
The likely end state is a barbell: a handful of integrators with 100,000-plus ports and genuine energy margin, a long tail of landlord-model operators renting bays to regional charge point operators, and a middle layer of operators who installed ports without repricing bays and will find, at the next lease renewal, that the incumbent has more negotiating leverage than the asset does.

- **Structure:** fragmented
- **Tier 1 Players:** 10
- **Intensity:** high

## Value Chain

8. Value Chain
The chain runs from a substation to a driver’s payment card, and the way to read it is by asking at each stage who bears the cost of the bay being occupied.
Stage 1 — Grid connection
Everything starts here, and here is where the market’s real bottleneck sits. A new load requires a service application, an engineering review, and either a service extension or a distribution upgrade. The New York Department of Public Service, in a December 2025 filing on capacity constraints, describes the range: where capacity does not exist at the requested location, the utility must upgrade substation, feeder or circuit assets, a process that “can take from one to ten years, depending on the asset in question, and can cost several million dollars.”
The same filing identifies precisely why EV load is harder to serve than building load: it is power-dense — a great deal of capacity requested relative to site area — and it has a low load factor, meaning average demand is a small fraction of nameplate. A parking-asset site requesting 1 MW to serve an average load of 30 kW is asking the network to reserve capacity it will almost never use.
In the parking-asset value chain, the connection is the one stage where the cost is fixed by the maximum power requested rather than by the energy delivered. That single fact explains most of the industry’s behaviour. It is why operators install AC where they would prefer DC, fit load management to cap the site’s import, and in some cases accept curtailed charging rather than fund an upgrade.
Stage 2 — Equipment
Hardware is the least differentiated stage and the most deflationary. The published DC deployment cost range runs from USD 30,000 to USD 285,000 — a spread driven almost entirely by the connection and civil works rather than by the charger. Ultra-fast hardware prices fell roughly 20 per cent between 2022 and 2024. In AC, the post is a commodity and the margin sits in the installation.
For a parking operator, this stage is a procurement exercise with one decision that matters: the power rating. Everything downstream depends on it.
Stage 3 — Site host
This is where the market’s economics are decided and where almost no analysis is done. The site host contributes land, access, security, lighting, signage and — critically — the opportunity cost of the bay.
Three contractual forms dominate. Under a lease, the host takes a fixed rent per space or per port. Under a concession, the host takes a share of revenue. Under self-operation, the host is the operator and bears everything.
Only self-operation gives the host any incentive to think about bay-hours, because only self-operation makes the host indifferent between parking revenue and charging revenue. Under a lease, the host has sold the bay’s time and no longer cares how long it is used. Under a concession, the host cares about revenue but not about the alternative use of the bay.
The consequence is counter-intuitive and is one of this report’s central points: the party best placed to price the bay-hour is the party with the least contractual reason to do so.
Stage 4 — Charge point operator
The CPO funds, installs, energises, maintains and bills. Its revenue is the retail tariff less wholesale electricity, network charges, roaming fees and payment processing. Its cost base is dominated by fixed elements — the connection capacity charge, the management platform subscription, field maintenance — which means its profitability is a function of utilisation and almost nothing else.
This is why CPOs and parking operators want different things from the same site. The CPO wants throughput. The parking operator wants either throughput or dwell, depending on whether the car park is full. Where the car park is full, the two objectives are in direct conflict, and the contract between them usually resolves it in favour of whoever has the longer duration.
Stage 5 — Mobility service provider and roaming
The MSP sits between the CPO and the driver, aggregating networks and providing access. Regulation has pushed hard on this layer. AFIR requires ad hoc access at every public point and prohibits extra charges for cross-border roaming; the UK requires operators to enable payment through at least one roaming provider and to notify the Secretary of State of their roaming arrangements.
The MSP layer compresses margin at the CPO end while adding friction at the driver end — the well-documented problem being that the price displayed in an app frequently differs from the price at the post.
Stage 6 — The driver
The driver is buying a charge and, at a parking asset, also buying the right to leave the car. Because the two are bundled, the driver’s price sensitivity is split in a way that neither the operator nor the CPO measures. A driver who has paid to park has already sunk the parking cost; the marginal decision is whether to charge there or later. A driver who has come specifically to charge treats the parking charge as a fee on charging.
The UK regulations address this directly: where charging is sold alongside parking in a single combined price, “the portion of this price that relates to charging must be clearly displayed separately in p/kWh.” The requirement exists because the industry bundled the two and the bundle concealed which product was expensive.
Where the margin sits



Stage
Cost driver
Margin shape
Who bears bay-occupancy cost




Grid connection
Maximum import capacity
Regulated return
Nobody


Equipment
Unit volume, civil works
Deflationary
Nobody


Site host
Land, opportunity cost of bay
Rent or share
The host


CPO
Utilisation, fixed connection charges
Operating leverage
Partially, via throughput


MSP
Transaction volume
Thin, regulated
Nobody


Driver
Energy price, time
—
Bears it, unpriced



The table exposes the structural flaw. The cost of a bay being occupied is borne by the site host. The revenue from a bay being occupied is earned by the CPO. The two are joined by a contract that prices land by the space or by the year, and never by the hour. Until that changes, the bay-hour will remain an externality inside the transaction that creates it.

- **Model:** hybrid
- **Distribution:** hybrid
- **Supply Complexity:** high

## Investment Activity

9. Investment Activity
Capital is entering this market through four doors, and only one of them is charging investment.
Door one: parking portfolio acquisition
The largest flows are parking transactions that carry charging as a bundle. Q-Park acquired 67 parking facilities with 36,088 spaces in 2025, taking its portfolio to 5,573 facilities and 1,237,940 spaces. It also grew charge points from 6,854 to 9,416 and operated ports from 4,708 to 7,310 — a 55 per cent increase in the operated base against a 37 per cent increase in the total, meaning a meaningful share of the growth came from taking operational control of ports it already had.
That distinction matters. Buying a car park with chargers in it and operating them yourself is a different investment from buying a car park and installing chargers. The first is an operating leverage play; the second is a construction project. Q-Park did both, and the disclosures do not separate them.
Door two: operator-led rollout programmes
APCOA’s stated ambition — up to 100,000 charging stations across more than 13,000 sites by 2035, plus 1,000 high-power stations with partners — is the largest disclosed parking-asset charging programme in the market. It is delivered through partnership rather than balance sheet, which means the capital sits with utilities and energy majors rather than with the operator. The Wien Energie arrangement is the template: APCOA provides prioritised locations and defines a location-dependent space rental fee; the partner conducts feasibility, installs, operates and bills.
What makes that investable for the partner is a guaranteed location with an existing customer base — a demand anchor that a roadside site does not have.
Door three: energy majors buying position
bp pulse’s Westblaak hub in Rotterdam, delivered with APCOA and THORNICO at 300 kW, is the clearest example of an oil major buying urban parking-asset real estate as a charging location without buying the parking business. The logic is straightforward: the site is already permitted, already has access control, already has a customer, and the marginal cost of the connection is lower than a greenfield site. The operator gets amenity and rent; the energy company gets a city-centre location it could not otherwise assemble.
Door four: public programmes, largely undelivered
NEVI allocated USD 5 billion. By the end of 2024, roughly USD 30 million had been spent on charging points in operation. In 2025, states spent about USD 94 million of the USD 4.4 billion available, delivering 497 ports at 99 locations — around 3 per cent of the 18,041 fast ports added nationally that year.
The programme’s failure is instructive rather than incidental. It was designed for corridor coverage, where utilisation is structurally low because the corridor exists for the few vehicles making long journeys. A parking asset has the opposite profile: the customer is coming anyway. The public programme funded the harder site type, delivered it slowly, and the private market grew 30 per cent without it.
By contrast, the EU’s obligation-based approach — 1.3 kW per BEV, enforced nationally — does not pick sites at all. It sets a quantity and lets the market decide where. That is a materially better-designed instrument for this particular problem, because it lets parking assets compete on their natural advantage.
Valuation and multiples
Pheonix’s estimate of transaction multiples in parking-asset charging is 6 to 9 times EBITDA, and it should be read as an estimate rather than an observed range — no disclosed transaction in this segment isolates a charging asset from its parking host. The range spans the two models almost exactly: a self-operated, energy-margin-exposed asset supports the upper end, while a landlord-model asset with contracted rent sits at the lower.
The multiple is also unstable in a way that matters to any buyer. A charging asset’s EBITDA is highly sensitive to utilisation, and utilisation in this market is measured in single digits at the slow end. A 1 percentage point improvement in a 3.01 per cent utilisation figure is a 33 per cent improvement in throughput. That is the operating leverage that justifies a multiple — but it cuts in both directions, and the same mathematics applies to a demand shock.
Where capital is going next
Three destinations are attracting disproportionate attention.
High-power hubs at long-stay assets. Airport, park-and-ride and retail destination sites where four hours of dwell is acceptable or irrelevant, and where a 150–300 kW post delivers the 8.26-fold bay-hour improvement without destroying the parking proposition.
Load-managed AC estates. The capital-efficient play. Rather than upgrading a connection, cap the site’s aggregate import and let a management system distribute it across many AC ports. The reasoning is the New York regulators’ point about load factor: if the site’s average demand is a few per cent of nameplate, the site does not need more capacity, it needs better scheduling.
Software and compliance. The 19.81 per cent growth arm. Regulatory obligations on data, reliability, payment and reporting have created a category of spend that scales with device count and is not price-shopped.
The capital gap nobody is funding
The one thing that would most improve returns in this market — repricing the bay — requires no capital at all. It requires a contract change. That is precisely why it is not happening: there is no transaction to earn a fee on, no asset to mark up, and no party whose mandate covers it.

- **Trend:** rising
- **Capital Intensity:** high
- **Recent M&A:** yes

## Technology & Innovation

10. Technology and Innovation
The most important technology decision in this market is also the oldest: how many kilowatts to put in the ground.
Power rating as the design variable
At 7 kW, a 44 kWh top-up takes 6.29 hours. At 11 kW, 4.00 hours. At 22 kW, 2.00 hours. At 50 kW, 0.88 hours. At 150 kW, 0.29 hours. At 300 kW, 0.15 hours.
Those six numbers are the technology chapter of this report. Everything else — the connector standard, the payment terminal, the management platform — is implementation detail by comparison.
There is a constraint that makes the ladder steeper than it looks. On AC, the vehicle’s onboard charger is usually the limiting device, and 11 kW is the common ceiling for current passenger EVs. Fitting a 22 kW AC post to an 11 kW-capable vehicle delivers 11 kW. The hardware cost rises, the dwell does not fall, and the bay-hour economics are unchanged. This is the single most common specification error in parking-asset charging.
The deflation at the top
Ultra-fast charging — 150 kW and above — grew by more than 50 per cent in 2024 and now accounts for nearly 10 per cent of all fast chargers globally. The IEA attributes part of that shift to cost: ultra-fast charger prices fell roughly 20 per cent between 2022 and 2024.
That deflation changes the calculus for parking assets, because the bay-hour gradient is steepest at the top of the power range. The jump from 11 kW to 50 kW multiplies revenue per bay-hour by 1.88; the jump from 50 kW to 150 kW multiplies it by 2.20. As the capital cost at the top falls, the case for putting a small number of high-power posts into a large AC estate gets stronger, not weaker.
That is the barbell strategy APCOA has disclosed without naming it: 11–50 kW AC and DC across the estate, plus a separate partner-funded programme of 1,000 high-power stations. Volume in the middle, margin at the top.
Battery buffering and the connection problem
Where the grid cannot deliver the requested capacity — which, per the New York filing, can take one to ten years and several million dollars to fix — the technical answer is to stop asking for it. A battery energy storage system behind the meter can absorb a slow trickle from the network and deliver a fast charge to the vehicle, decoupling the charger’s power rating from the site’s import capacity.
The economics are unusual and worth stating plainly: the battery does not make the energy cheaper, it makes the bay-hour cheaper, by allowing a site to offer 150 kW dwell economics on a 50 kW connection. In a market where revenue per bay-hour varies 8.26-fold, that is a high-value application.
Load management at the estate level
The obverse of buffering is simply to manage the load. A site with forty AC ports and a 100 kW connection cannot run all forty at 11 kW simultaneously; a management system that rotates or throttles them can. The vehicle does not care, because it is parked for four hours anyway.
This is where the AC estate’s apparent weakness becomes a technical advantage. Slow charging is inherently interruptible. A 300 kW session cannot be paused without the driver noticing; a four-hour 11 kW session can be paused for twenty minutes without consequence. The AC estate is therefore the natural home for demand flexibility, and the revenue from providing it — to a network operator, an aggregator or a flexibility market — is a second income stream on a port that is otherwise 3 per cent utilised.
Standards and the compliance stack
Open Charge Point Protocol governs communication between the charger and the management system; Open Charge Point Interface governs the data that must be published. The UK mandates OCPI for public points and requires reference and availability data to be machine-readable and available to government bodies, distribution network operators and system operators.
ISO 15118 and Plug & Charge — where the vehicle authenticates over the cable without a card or app — remain the most consequential standard in the chain, because they remove the payment terminal from the bill of materials while simultaneously satisfying the contactless requirement in spirit. AFIR’s requirement from 1 January 2027 for card or contactless payment at all public points above 50 kW on the TEN-T network and at safe and secure parking areas has pushed terminal costs back into the equation for exactly the sites that did not want them.
Vehicle-to-grid and the parked battery
A parking asset holds a large aggregate battery for hours at a time. Vehicle-to-grid and vehicle-to-building have been technically feasible for years and commercially marginal, for a reason that this report’s framing makes obvious: the value of a bidirectional charger depends on the vehicle being plugged in for a long, predictable duration — which is precisely the dwell profile that the bay-hour analysis says destroys parking revenue.
The two markets therefore want the same thing from opposite directions. V2G needs long dwell and values it; parking needs short dwell and is penalised by it. A site that can sell grid services during a four-hour dwell has, for the first time, a way to monetise the duration itself rather than the electrons — which is the repricing this market has been missing.
What is not coming
Wireless inductive charging at parking assets is technically proven and commercially absent; the efficiency penalty and the retrofit cost of embedding pads in existing decks do not clear the bar. Robotic charging arms are in pilot and solve a real problem — the cable — at a cost per bay that exceeds the bay’s annual revenue in most assets. Neither will move the 2025–2033 numbers in this report.
The innovation that matters is cheaper than both: put the right number of kilowatts in the ground, and contract for the hour.

- **Innovation:** high
- **Patent Activity:** moderate
- **Maturity:** growth

## Market Risk

11. Market Risk
The risks in this market are not the ones usually listed. Demand is not the problem — 141 million charging sessions were completed in the United States in 2025 alone. The risks are contractual, physical and regulatory, in that order.
Utilisation risk, and why it is asymmetric
Q-Park’s disclosed figures imply 2,900 kWh per operated port per year — about eight kilowatt-hours a day, or 3.01 per cent capacity utilisation at an 11 kW rating. At that level, a one percentage point improvement in utilisation is a 33 per cent improvement in throughput. The operating leverage is extraordinary in both directions.
The asymmetry matters because the cost base is largely fixed. A connection capacity charge is paid whether the port is used or not; a management platform subscription is per port; maintenance is scheduled by device. Revenue varies with utilisation and cost does not. A site that misses its demand forecast by a third does not lose a third of its profit — it loses most of it.
The offsetting consideration is that the low utilisation figure is not evidence of failure but of availability. A port that is used 3 per cent of the time is available 97 per cent of the time, which is the product being sold. The risk is not that utilisation is low; it is that nobody has priced availability.
Grid connection and the capacity trap
The New York Department of Public Service’s December 2025 filing is the clearest published description of this risk. Where distribution capacity is constrained, upgrades “can take from one to ten years, depending on the asset in question, and can cost several million dollars.” EV load is characterised as power-dense with a low load factor — average demand a small fraction of nameplate — which is exactly the profile that makes a utility reluctant to reserve capacity.
For a parking operator the exposure is threefold. A committed connection capacity that exceeds need is a permanent cost. A deferred connection is a deferred revenue stream. And a site that guesses wrong on power rating cannot easily change it — the trench, the cable and the protection are sized for the original decision.
Pheonix treats this as the single largest execution risk in the market, ahead of demand, because it is the one that cannot be fixed by commercial action after the fact.
The stranded AC estate
If regulatory attention, capital and pricing innovation all migrate toward high power — as the current direction of travel suggests — then a large installed base of 7–11 kW posts at short-stay assets becomes a stranded asset in the specific sense that it cannot be repriced upward. The hardware is fine. The connection is fine. The problem is that dwell is set by physics and the tariff cannot recover the opportunity cost of a four-hour occupancy in a car park that turns over every ninety minutes.
The scale of that exposure is visible in the UK data: 56 per cent of 86,021 devices are in the 3–8 kW band, and only 20 per cent are at 50 kW or above. If the estate’s economic centre of gravity moves to fast charging, the majority of the installed base is on the wrong side of the 8.26-fold gradient.
The counter-argument is strong and should be stated: in assets where the alternative use of the bay is worthless — overnight, workplace, long-stay airport, residential — a slow charger is the correct technology at any utilisation, because there is no opportunity cost to recover. The stranded-asset risk is concentrated in short-stay, high-tariff, high-demand assets, not across the estate.
Regulatory cost and scope creep
The compliance burden per device has risen sharply and is still rising. The UK requires p/kWh price display, contactless above 8 kW for new installations, 99 per cent reliability across rapid networks with published compliance and an annual report to the Secretary of State, a free 24/7 staffed helpline advertised at every point, OCPI open data, and roaming through at least one provider. AFIR requires ad hoc access, comparable and non-discriminatory pricing, and from 1 January 2027 card-based payment at all public points above 50 kW along the TEN-T network and at safe and secure parking areas.
Each obligation is individually modest. Collectively they convert the software and services layer from a margin centre into a cost of doing business, and they fall most heavily on small operators. That is a consolidation force, and it is already visible in the data: operators are growing device counts faster than they are growing revenue per device.
Demand risk is real but differently shaped than assumed
The standard worry is that EV adoption slows and the chargers have no customers. The evidence does not support that as the primary risk. Global public charging points passed five million at the end of 2024 and added 1.3 million in one year; US fast charging grew 30 per cent in 2025 to over 70,000 ports with 141 million sessions completed; UK devices grew 23 per cent in a year.
The real demand risk is distributional. Demand may fail to arrive at specific sites rather than in aggregate — a car park with the wrong dwell profile, a town with too little EV penetration, an asset whose catchment charges at home. Aggregate growth can coexist with severe local under-utilisation, and in this market it does.
Technology and obsolescence risk
Charging hardware is deflationary and improving. Ultra-fast prices fell roughly 20 per cent in two years, and 150 kW posts are becoming the default at sites that would have specified 50 kW in 2022. A site built to a 2023 specification will look over-capitalised and under-powered by 2028. The mitigating factor is that the civil and connection works — the expensive, slow, hard-to-change part — are power-agnostic up to a point. A site that over-sizes its connection and under-sizes its cabinets can be upgraded cheaply. A site that does the reverse cannot.
Competitive and contractual risk
The parking industry’s structural weakness — that an operator owns a term granted by a procuring authority, not an asset — is examined in the companion concession report and applies here with a specific twist: charging assets have a shorter economic life than the leases they sit under, and a well-built charging portfolio can outlive its host contract. On renewal, the incumbent has more to lose than the asset does.
Pheonix rates overall market risk as moderate, with the distribution heavily skewed: low at long-stay assets with self-operated ports, high at short-stay assets with landlord-model arrangements and AC-only infrastructure. That is not a market-level judgement. It is a site-level one, and the market average conceals more than it reveals.

- **Overall Risk:** moderate
- **Geopolitical Exposure:** moderate
- **Substitution Risk:** moderate

## Regulatory Landscape

12. Regulatory Landscape
Two regimes govern this market, and they share a structural flaw: both were written for fast charging, and both are being applied to an estate that is mostly slow.
The European Union: obligation-led
Regulation (EU) 2023/1804, the Alternative Fuels Infrastructure Regulation, is the most consequential instrument in this market because it sets a quantity rather than funding a project.
Article 3 requires Member States to ensure that at the end of each year from 2024, publicly accessible recharging stations deliver a total power output of at least 1.3 kW for every light-duty battery electric vehicle registered in their territory, and 0.80 kW for every plug-in hybrid. The requirement is cumulative and national. A Member State that falls short has no option but to add capacity, and the cheapest capacity to add is at an existing parking asset.
There is an escape clause: where the BEV share of the fleet reaches at least 15 per cent and a Member State can demonstrate that the requirement is discouraging private investment, it may request authorisation to apply lower requirements. As of the sources reviewed for this report, no such authorisation had been granted.
Article 5 governs the commercial interface, and three provisions matter here.
Ad hoc access. Operators must allow recharging on an ad hoc basis, and at points deployed from 13 April 2024 this must be possible using a widely used payment instrument — card readers, contactless, or for points below 50 kW a QR-code based internet payment. From 1 January 2027, all public points at 50 kW or above on the TEN-T road network and at safe and secure parking areas, including those deployed before April 2024, must offer card or contactless payment.
Pricing. Prices must be “reasonable, easily and clearly comparable, transparent and non-discriminatory,” with no discrimination between end users or between mobility service providers, and any differentiation must be “proportionate and objectively justified.”
Occupancy fees. At points of 50 kW and above, the ad hoc price must be based on price per kWh, and operators may additionally charge an occupancy fee as a price per minute to discourage long occupancy, with both displayed before the session starts.
That last provision is the only place in either regime where the law explicitly recognises that a charging bay’s time has value. It is scoped above 50 kW. The overstay problem — which Q-Park names in its own report — is worst below 50 kW.
The United Kingdom: transparency-led
The Public Charge Point Regulations 2023 came into force on 24 November 2023 and apply across the United Kingdom to charge points accessible to the public, including those providing electricity free of charge.



Requirement
Scope
Deadline




Pricing transparency in p/kWh, with all fixed fees included
All public charge points
Immediate (24 November 2023)


Contactless payment
New points 8 kW+ and existing points 50 kW+
24 November 2024


99% reliability, published annually with a report to the Secretary of State
Rapid charge point networks
24 November 2024


Free 24/7 staffed telephone helpline, advertised at every point
All public charge points
24 November 2024


Open data via OCPI, machine-readable, available to network operators and government
All public charge points
24 November 2024


Payment through at least one roaming provider
All public charge points
24 November 2025



The pricing rule is the most interesting for this report. Where charging is sold alongside parking in a single combined price, “the portion of this price that relates to charging must be clearly displayed separately in p/kWh.” That is an explicit acknowledgement that the industry bundled two products with different cost drivers, and that the bundle concealed which one was expensive.
The reliability rule is the most revealing. A 99 per cent availability obligation across a rapid network, measured annually and published, is a genuine constraint. It does not apply to the 56 per cent of the estate in the 3–8 kW band. Nor does the contactless obligation below 8 kW. The regulation is a rigorous regime for the fast fifth of the estate and a light-touch one for the slow majority — which is the majority that determines how long a bay is occupied.
The United States: programme-led, and under-delivering
NEVI was allocated USD 5 billion under the Bipartisan Infrastructure Law to build fast charging along designated corridors. By the end of 2024, roughly USD 30 million had been spent on charging points in operation. In 2025, states spent about USD 94 million of the USD 4.4 billion available, delivering 497 ports at 99 locations — approximately 3 per cent of the 18,041 fast ports added nationally.
The programme’s design explains its performance. Corridor charging has structurally low utilisation because the corridor exists for the minority of journeys that are long. Parking assets have the opposite profile: the customer arrives regardless. The US funded the harder site type and the private market grew 30 per cent without it.
The gap: no instrument prices the bay
Across both regimes, the obligations run to availability, payment, transparency and data. None of them prices the duration of occupancy except AFIR’s optional occupancy fee, and that instrument is confined to high power.
The consequence is a market in which the legally mandated product is availability, the commercially valued product is throughput, and the scarce resource — the bay-hour — has no price. An operator complying fully with both regimes can still be destroying value at every busy hour of the day, and nothing in the regulatory framework would tell them.
What would change the picture
Three developments would materially alter the 2025–2033 trajectory.
An occupancy-fee obligation below 50 kW. If AFIR’s per-minute occupancy mechanism were extended to slow charging — or adopted voluntarily by operators as a standard term — the AC estate would acquire a repricing tool it currently lacks. The technical barrier is trivial; the political one is that slow charging is where equity concerns are sharpest, since residents without driveways depend on it.
Bay-level metering and disclosure. The UK already requires p/kWh separation when charging is bundled with parking. Extending that to require disclosure of the bay’s occupancy cost would make the trade-off visible to the driver and to the operator’s own management accounts.
Flexibility markets that pay for interruptibility. A four-hour 11 kW session is inherently interruptible. If network operators and aggregators pay for that flexibility at a level that reflects its value, the AC estate acquires a second revenue stream and the case for slow charging stops depending on energy margin alone.
Pheonix rates regulatory complexity high and the approval pathway multi-jurisdictional. Both are correct descriptions of the compliance burden. Neither captures the more important point: the regulation has arrived, the repricing has not, and the gap between them is where this market’s returns will be decided.

- **Complexity:** high
- **Approval Pathway:** multi_jurisdictional

## Frequently Asked Questions

**Q: How large is the EV charging at parking assets market?**

Pheonix Research sizes the market at USD 25.00 billion in 2025, rising to USD 63.60 billion by 2033 at a compound annual growth rate of 12.38 per cent. The market covers equipment and installation at parking assets (USD 14.60 billion in 2025), electricity resold through those ports (USD 7.48 billion) and the software, management and O&M layer (USD 2.92 billion). Home charging and corridor charging not sited at a parking asset are excluded.

**Q: Why does installing a charger lengthen parking dwell?**

Because the power rating sets the duration of the charge, and the duration is the dwell. A 44 kWh top-up — roughly a seventy per cent replenishment of a mid-size EV — takes 6.29 hours at 7 kW, 4.00 hours at 11 kW, 0.88 hours at 50 kW and 0.15 hours at 300 kW. Most AC posts are capped further by the vehicle's onboard charger, typically 11 kW. The bay that served six ninety-minute visits in a ten-hour day now serves two and a half four-hour visits.

**Q: What is the occupancy fee under AFIR and why does it matter?**

Article 5(4) of Regulation (EU) 2023/1804 permits operators of publicly accessible recharging points at 50 kW and above to charge an ad hoc price per kWh and, in addition, an occupancy fee priced per minute to discourage long occupancy of the charging point. It matters because it is the first regulatory instrument that prices the bay-hour rather than the electron — but it applies only above 50 kW, while overstay is worst at the slow end of the estate.

**Q: Why has the parking industry not repriced charging bays?**

Because the party that owns the bay and the party that earns the energy margin are usually different companies, and the contract between them is a space rental rather than a revenue share. Q-Park self-operates 78 per cent of its charge points and books the energy revenue; APCOA's disclosed model is partnership, taking a location-dependent space rental fee while the partner funds and operates the infrastructure. A landlord has no access to the energy margin and therefore no reason to reprice the hour.