Global Mobility Data Exchange, Curb Data Specification & Municipal Data Compliance Market Report, Size, Share and Forecast 2026–2033: The Sensor Is Sold Once and the Data Is Sold Every Year — the Data Layer Under the Platform Is the Business
The sensor is sold once. The data is sold every year — and the second half of that sentence is where the money is.
Every city that has tried to manage a kerb has discovered the same thing in the same order. It buys sensors, or cameras, or a permit platform, and it gets an asset that depreciates on a five-to-seven-year schedule. Then it discovers that the asset is worthless without a machine-readable description of what each metre of kerb is for — who may stand there, for how long, at what price, in which hours — and that this description has to be maintained, versioned, published to a national or municipal access point, and defended to somebody at renewal.
The first purchase is capital. The second is a subscription, and it is the one that never stops. That distinction is the whole architecture of this market, and it explains the single most counter-intuitive number in it: a category growing at 18.11% a year in which the average customer's spend grows at 1.59%.
What this market actually is
This report sizes the spend by public authorities and their suppliers on four distinct layers that are routinely sold together and priced separately:
- Mobility data exchange platforms. The city-side ingestion, validation and policy-enforcement layer that receives operator data — trips, vehicle status, geofences, policy requirements — and turns it into permit compliance. This is where the Mobility Data Specification (MDS) sits.
- Curb data specification and digital curb inventory. The survey, digitisation and publication of the kerb itself: kerb lines, regulations, assets, zones, and the real-time status of loading space. This is where the Curb Data Specification (CDS) sits, and where the physical work of walking 100 or 700 curb miles happens.
- Municipal data compliance and audit. Declarations of compliance, data-sharing agreements, retention and minimisation controls, privacy assessment, audit trails, version upgrades and the evidence pack that survives a compliance assessment.
- Data licensing, benchmarking and analytics. The subscription products built on top of the first three: utilisation benchmarks across peer cities, dwell and turnover analytics, modelled occupancy, and the annual renewal of the whole stack.
What is excluded matters as much as what is included. Sensor hardware, cameras, payment terminals, PARCS gates, enforcement citation systems and parking concession operations are all adjacent and all separately sized elsewhere in this segment — including in our own work on occupancy sensing and space guidance, on-street enforcement and digital permitting, and PARCS. The thesis of this report depends on keeping them out: a sensor is a device with a depreciation schedule, and a compliance obligation is an annuity with a signature on it.
Market size and forecast, 2025–2033
| Metric | 2025 (base) | 2033 (forecast) | CAGR |
|---|---|---|---|
| Market value (USD million) | 612.4 | 2,318.7 | 18.11% |
| Instrumented authorities (units) | 1,870 | 6,240 | 16.26% |
| Revenue per authority (USD) | 327,487 | 371,587 | 1.59% |
| Instrumented curb-miles | 766,700 | 3,993,600 | 20.08% |
| Revenue per instrumented curb-mile (USD) | 799 | 581 | −3.91% |
| Recurring share of revenue | 71.41% | 82.10% | — |
Read the third and fifth rows together and the market's character is settled. Value per customer barely moves. Value per curb-mile actually falls, by 3.91% a year, because digitising a kerb is becoming a survey task with a known price and a competitive tender, not a bespoke engineering project. 89.8% of the forecast growth in CAGR terms is volume — more authorities, and more curb-miles inside each authority — and only the residual is price or mix.
That is not a weakness. It is what a standards-led infrastructure category looks like once the standard wins: the unit price deflates, the installed base compounds, and the money arrives as renewal. But it does mean that any supplier whose growth plan is "raise the licence fee" is planning against the arithmetic.
The 2026 hinge: from "publish what you have" to "create what you must"
The most consequential fact in this market is a distinction in European law that sounds like drafting pedantry and is in fact a capex-to-opex conversion programme for several thousand municipalities.
The Multimodal Travel Information Services delegated regulation — 2017/1926 as amended by 2024/490 — obliges cities and municipalities to register their mobility-related datasets on a National Access Point. The National Access Point coordination project's own guidance is explicit that this covers only data already available in a machine-readable format, and answers the obvious follow-up question directly: the regulation does not include an obligation to digitise. A municipality with kerb regulations in a filing cabinet and a spreadsheet of loading bays is, today, compliant by publishing nothing.
Then the same guidance says the thing that matters: the revised ITS Directive, Annex III, mandates the creation of certain static multimodal traffic data from 2026 onwards. The categories named are not abstract — points of interest, cycle route networks, pedestrian and accessibility networks, park-and-ride and bike-share stations including the permitted drop-off zones defined by the city, secured bicycle parking, and car parking including where and how to pay for it, in DATEX II, INSPIRE, NeTEx or SIRI as appropriate.
"Permitted drop-off zones defined by the city" is a kerb dataset. "Where and how to pay for parking" is a kerb dataset. From 2026, a class of public authorities that has never had to build a machine-readable description of its own kerb has to build one, and then keep it current, and then sign a declaration about it.
The United States arrived at the same place through procurement rather than statute. The Curb Data Specification reached version 1.0 in May 2022 with more than 160 individuals from 70+ public agencies and companies involved in drafting it, and version 1.1 in November 2025 added real-time event reporting and multi-format payment tracking. The federal SMART programme has funded curb digitisation directly, and the specification's own user list names Seattle, San Francisco, Los Angeles, San Diego (SANDAG), San Jose, Minneapolis, Miami, Washington DC, Pittsburgh, Philadelphia and Omaha.
Why the revenue recurs: the compliance artefact expires
The reason this market is 71.41% recurring in 2025 is not that software is sold as a subscription. It is that the compliance artefact has a date on it. In Europe, data provision to a National Access Point must be accompanied by a declaration of compliance and accompanying documentation, and National Bodies assess providers selected by random sampling against per-article compliance forms — with financial penalties available to the national body in some Member States. A declaration signed in 2025 does not cover a dataset restructured in 2026. A kerb inventory surveyed before a bus lane moved is no longer a description of the kerb.
Layer three of the standard cycle on top of that. MDS is at release 2.1.0 and has been through six distinct APIs since the provider API shipped in June 2018; CDS went 1.0 to 1.1 in three and a half years. Every version transition is a re-validation event across every feed an authority receives, and authorities do not do that work themselves — they buy it.
| Revenue type | 2025 (USD m) | Share | 2033 (USD m) | Share |
|---|---|---|---|---|
| Recurring — licences, subscriptions, compliance retainer, analytics | 437.3 | 71.41% | 1,903.6 | 82.10% |
| One-off — inventory survey, integration, implementation | 175.1 | 28.59% | 415.1 | 17.90% |
| Total | 612.4 | 100% | 2,318.7 | 100% |
Segment structure
| Segment | 2025 (USD m) | Share | 2033 (USD m) | Share | CAGR |
|---|---|---|---|---|---|
| Mobility data exchange platforms | 214.3 | 35.0% | 726.8 | 31.3% | 16.49% |
| Curb data specification and digital curb inventory | 168.5 | 27.5% | 742.4 | 32.0% | 20.37% |
| Municipal data compliance and audit | 141.9 | 23.2% | 468.1 | 20.2% | 16.09% |
| Data licensing, benchmarking and analytics | 87.7 | 14.3% | 381.4 | 16.4% | 20.17% |
| Total | 612.4 | 100% | 2,318.7 | 100% | 18.11% |
The kerb layer overtakes the platform layer in 2033. That is the central forecast claim of this report and it rests on two asymmetries. The operator data layer is already saturated: MDS is used by more than 1,200 cities and public agencies across 76 countries, implemented by over 200 mobility service providers, with more than 2 billion trips sent through it. There is very little left to connect. The kerb layer, by contrast, has barely started — CDS counts adopters in the low dozens, and most of the world's kerb has never been described in a machine-readable form at all.
The compliance segment is the honest oddity. It grows 16.09%, slower than the market, and its share falls from 23.2% to 20.2% — yet it is the segment that underwrites the recurring mix, because it is the reason an authority cannot simply stop paying. It is an annuity priced off a legal obligation, and annuities always look unexciting next to the thing they finance.
Regional structure, 2025
| Region | USD m | Share | Character of demand |
|---|---|---|---|
| North America | 254.8 | 41.6% | Grant-funded pilots, permit-driven operator data, municipal procurement |
| Europe | 179.4 | 29.3% | Statutory publication via National Access Points; 2026 digitisation mandate |
| Asia-Pacific | 117.0 | 19.1% | State-directed platform consolidation; few open standards |
| Latin America | 39.2 | 6.4% | Concession-linked data obligations; bank-funded corridor projects |
| Middle East & Africa | 22.0 | 3.6% | Greenfield master-planned districts; standards adopted by specification |
Europe is the region where the forecast is least dependent on our own assumptions, because the obligation is written down and dated. North America is where the price discovery is happening, because its programmes are procured as visible contracts.
The only real prices in the category
Market sizing in a category this young is mostly inference, so it is worth stating plainly which numbers are observed rather than modelled.
- Denver: the Denver Regional Council of Governments contracted USD 250,000 over 24 months for a Curbside Digital Twin — a kerb dataset and API consistent with CDS and the city's asset-management requirements — after a solicitation that drew 10 proposals, four of them disqualified. That is roughly USD 125,000 a year for the kerb layer alone in a consolidated city-county of about 715,000 people.
- Los Angeles: a USD 2 million federal grant to build a digital inventory of loading zones across downtown.
- Seattle and Minneapolis: a joint USD 15 million Stage 2 grant awarded in December 2024 to scale commercial vehicle permitting and curb management.
- West Hollywood: a whole-city digital curb inventory of roughly 100 curb miles, ingested into a CDS-conformant platform, with existing kerb vendors integrated into a single utilisation record.
- Pittsburgh: 20 managed loading zones operated from January 2022 to December 2024, with a causal analysis published in Transportation Research Part E reporting 70% more vehicle turnover per zone and 60% shorter average dwell — the same pavement, serving more vehicles, without adding a space.
Set the Denver figure against the model. The kerb layer in 2025 is USD 168.5m spread across 1,870 authorities — an average of USD 90,107 per authority. Denver's contract runs above that average, which is what you would expect of a large, early, grant-supported programme with an unusually ambitious scope. The model is not out of line with the only hard price we can see, and that is the most useful thing the triangulation does.
How the base year is built
The 2025 figure is built bottom-up from authority counts and per-authority spend, not top-down from an adjacent category. The stack:
| Buyer class | Authorities | Spend per authority (USD) | 2025 (USD m) |
|---|---|---|---|
| Tier 1 metros and city-counties (pop. > 500,000) | 420 | 826,000 | 346.92 |
| Tier 2 cities (150,000–500,000) | 780 | 168,000 | 131.04 |
| Tier 3 cities (< 150,000) | 540 | 41,000 | 22.14 |
| Regional, state and metropolitan agencies | 130 | 864,000 | 112.32 |
| Total | 1,870 | 327,487 average | 612.42 |
Authority counts are a Pheonix estimate, derived from the published MDS agency list and CDS user list cross-checked against municipal population distributions; they are not a census. Per-authority spend is modelled from the observed contract values above, then allocated across the four layers. Curb-mile counts assume 410 instrumented miles per authority in 2025, rising to 640 by 2033 as whole-city digitisation replaces downtown-only pilots — the pattern visible in West Hollywood's 100-mile inventory and Denver's citywide digital twin.
Two limitations stated rather than smoothed
First, this is not a market with published revenue. Almost every participant in the data-exchange layer is privately held and does not report segment revenue; the large, listed companies in the company panel participate in this market as one line inside a much larger business. The sizing is therefore reconstructed from public procurement values, standard-adoption counts and population-scaled spend, and it should be read as an order of magnitude with a defensible growth rate attached, not as an audited figure.
Second, grant funding is doing work that the model treats as demand. Several of the largest observed programmes in the United States were federally funded, and a grant is not a budget line that renews itself. We have not discounted the forecast for a reduction in SMART-style funding; the 2025 base includes grant-funded programme spend as market revenue because it is revenue, and the market-risk chapter states what happens if that pipeline narrows.
Sources
- Open Mobility Foundation, Mobility Data Specification — history, current release 2.1.0, API structure, and the 1,200-city / 76-country / 200-provider / 2-billion-trip adoption counts.
- Open Mobility Foundation, Curb Data Specification Users — CDS 1.0 approval in May 2022, named adopting cities and companies.
- NAPCORE, FAQs on the Delegated Regulations — MMTIS 2024/490 obligations on cities and municipalities, the no-obligation-to-digitise position, the revised ITS Directive Annex III 2026 mandate, declarations of compliance and sampled compliance assessment.
- Denver Regional Council of Governments, Curbside Digital Twin contract memorandum — USD 250,000 over 24 months, CDS-conformant dataset and API, ten proposals received.
- CurbIQ, Intelligent curb management in the City of West Hollywood — approximately 100 curb miles, CDS ingestion, integration of existing kerb vendors.
- Level Parking, The numbers from three years of managed loading zones — Pittsburgh programme results, CDS 1.1 release, LA, Denver and Seattle/Minneapolis grant awards.
- Electronic Frontier Foundation, EFF and ACLU file lawsuit to stop Los Angeles collecting real-time tracking data — the privacy dispute that has shaped how operator data is minimised and retained.
All figures in this report are Pheonix Research estimates constructed from the sources above and from our own bottom-up model, except where a specific contract value, adoption count or statutory requirement is attributed by name. The 30% primary layer is our own modelling and document analysis, not interviews or survey samples.
Table of Contents
- Market Definition and Key Findings
- Market Size and Forecast, 2025–2033
- Volume, Unit Economics and the Deflating Curb-Mile
- Segment Structure: Platforms, Kerb, Compliance, Analytics
- The 2026 Regulatory Hinge
- Why the Revenue Recurs
- Regional Structure
- Observed Prices and Programme Evidence
- Standards Landscape: MDS, CDS, GBFS and GOFS
- How the Base Year Is Built
- Competitive Landscape
- Value Chain and Data Provenance
- Technology and Standards Innovation
- Regulatory Landscape
- Investment Activity
- Market Risk
Competitive Landscape
A standard that is free, a function that is not
The first thing to understand about competition in this market is that the specification itself is not a product. MDS is an open-source project with all development on public repositories and open working-group meetings; CDS was drafted by more than 160 individuals from over 70 public agencies, kerb users and technology companies and is published free. Any vendor can implement either. The consequence is unusual: the standard has spread to more than 1,200 cities and 200-plus providers precisely because nobody owns it, and that same openness guarantees that the core function — receiving a compliant feed and validating it — has no durable pricing power.
So value has migrated to the two things a free specification cannot supply: the authoritative record a city is prepared to sign its name to, and the evidence that the record is still true. Competition in this market is therefore not a competition between products. It is a competition between positions on that evidence chain.
Five archetypes, and why they do not converge
Data-exchange platforms. The city-side ingestion and policy-validation layer for operator data. This group carries the highest proportion of recurring revenue and the closest thing to a moat, because a city rarely runs two authoritative operator-data systems. It is also the most crowded at the low end: MDS’s own provider list names well over 200 service operators and data solution providers, and a large share of them are small software firms selling the same validation function against the same open schema.
Kerb specialists. The firms that walk the street, capture kerb lines and signage, extract the rules and publish them as CDS zones, events and sessions. This is the least concentrated archetype and the one with the most visible physical cost base. The specification’s named adopters are mostly firms of this kind — survey, computer vision, and occupancy analytics businesses, several of them European, several of them founded after 2018.
Engineering and GIS consultancies. The archetype that has changed most in the last three years. Curb digital twins are procured as professional services with a data deliverable attached, which is exactly the shape of an engineering contract, and the consultancies have responded by buying the software layer outright rather than partnering for it. That is how a kerb inventory stops being a project and becomes an asset register with a renewal date — and it is why recent M&A in this category has been engineering firms acquiring platforms rather than platforms acquiring each other.
Transport technology incumbents. The listed systems integrators that already hold the city’s payment, enforcement, ticketing or tolling contracts. They do not need to win the data layer on merit; they need only to include it in a renewal the city was going to sign anyway. Their weakness is that the data layer is a rounding error inside their reporting segments, so it attracts neither investment nor urgency until a competitor uses it to enter the account.
The obligated operators. The mobility providers and their data solution providers who must produce the feeds. They are not selling to cities; they are absorbing a compliance cost, and they will rationally prefer the cheapest compliant path — which in practice means a single provider ID and a standard tool, not a bespoke integration per city. This archetype’s buying behaviour is the strongest deflationary force in the platform layer and the strongest argument for the kerb layer being the growth segment.
Fragmentation is structural, not transitional
No participant in this market holds a share that would trouble a competition authority. We estimate the largest single vendor’s revenue across all four layers at well under a tenth of the total, and the picture is not converging: the number of instrumented authorities is growing at 16.26% a year, most of them small, and small authorities buy local. A kerb survey is delivered by people who can reach the street.
The consolidation that is happening is vertical and quiet. An engineering firm buys a kerb platform; a parking operator buys a permitting engine; a payment processor buys the analytics front end. None of these transactions creates a horizontal leader, and none of them removes a competitor from the platform layer.
Qualification is the real barrier
The clearest evidence of where competitive advantage sits is in how cities buy. The Denver regional procurement for a curbside digital twin drew ten proposals and disqualified four — not on price, but because they did not meet the requirements or would not accept the contract terms. The surviving six needed demonstrated experience fusing kerb-line and street-sign asset data into a geospatial format, producing a CDS-compliant dataset and API, and handling block faces that change over time.
That is a specification of provenance capability, written by a buyer who has been disappointed before. It explains why the fragmented end of the market persists and why it does not get commoditised as fast as the schema would suggest: the buyer is not purchasing a validator, it is purchasing a defensible record, and defensibility is an organisational capability that takes years to build and cannot be downloaded.
What the standards body actually governs
The Open Mobility Foundation is not a competitor, but it sets the terms of competition. Its governance includes a Privacy, Security and Transparency Committee, a Technology Council, and working groups for MDS and for the kerb. Every one of those bodies is where the next version of the commercial argument is decided, and vendors that do not participate discover the requirement when a city writes it into a permit. Membership is therefore a strategic expense rather than a marketing one.
There is a distribution risk buried in the same structure. The specification’s user list includes consumer mapping at global scale, which means the public-facing presentation of kerb rules may be supplied by a company for whom it is a feature of a map, not a business. That does not threaten the compliance layer — a map does not sign a declaration — but it does cap what any vendor can charge for the read-only publication of a kerb dataset, and it is one reason we model revenue per curb-mile falling 3.91% a year.
The disclosed gap
Several of the most active specialists in this market are privately held and have no reliable public identifier, so they are named in this text but are not bound to a company record in our graph. That is a statement about identifier availability, not about their importance: two of the archetypes above are, in revenue terms, mostly populated by firms the standard-setting process could not run without and our reference data cannot yet resolve.
Value Chain
Seven links, one of which carries the price
The chain that produces a compliant mobility data record has seven links: capture, transmission, validation, authoritative record, publication, downstream consumption, and audit. Every participant in the market occupies at least one. Almost all of the durable margin sits in the fifth, sixth and seventh, which is the opposite of where the physical work happens.
Capture is the operator’s own telemetry — the GPS trace, the vehicle state, the trip start and end — or, on the kerb side, a survey vehicle, a camera, or a paid walking inventory. It is capital-intensive, one-off, and competitively priced. Transmission is the API call described by the specification. It is free to build and cannot be charged for. Validation is where the first real product appears: does this feed conform, does this trip violate the geofence, does this vehicle appear in a no-ride zone at the hour the policy says it may not.
The city’s authoritative record is the pivot of the chain
Link four is the one that changes hands for money. A city does not want a validator; it wants a record it can rely on in a permit hearing, a fine, a lawsuit or an audit. That record has to survive the operator changing vendors, the schema changing version, and the official who built it leaving. Whoever holds it holds the account, which is why the platform layer is where recurring revenue concentrates even though the standard is free.
This is also where the market’s cost structure is most misunderstood. The expensive part of an authoritative record is not storage or compute. It is reconciliation — deciding which of two conflicting assertions about the same vehicle, the same block face or the same loading window is the true one, and being able to show the working.
MDS is modular, and modularity fragments the value chain
The specification is explicitly a kit of parts. It comprises six APIs, and a city is free to implement one, three or all of them. The provider API, which pulls historical and recent operational data from mobility providers, shipped first in June 2018. The agency API, which pushes events to agencies in real time, followed in April 2019. The policy API, through which providers query the rules that determine compliance, and the geography API arrived in October 2019. Jurisdiction and metrics both arrived in March 2021.
The commercial consequence is direct: a city that adopts only provider and policy buys a validation product, while a city that adopts agency, geography and metrics as well buys an operational platform. Two authorities on the same standard, in the same year, at the same population, can therefore differ in spend by a factor of three. Our per-authority figures average across that spread, and readers should treat them as a mean of a wide distribution rather than a rate card.
The public feed is free; the audit is not
There is a rule in the specification that reveals the entire business model. All MDS-compatible provider and agency feeds must also expose a public GBFS feed for micromobility and fleet modes, and GOFS for passenger mode. The public-facing data — where the scooters are, whether a bike is available — is a required free good. The compliance-grade data — the trip record that proves an operator breached a policy — is not public, is not free, and is the thing a city must be able to defend.
That split is the value chain in miniature. Everything a consumer sees is commoditised by design. Everything a regulator must sign off is priced. Any supplier whose product is a prettier view of the free layer is competing with a public good.
On the kerb side, the chain starts with a sign
The kerb chain is harder because the source of truth is physical and frequently wrong. A kerb regulation exists in three places at once: on a sign, in a municipal code, and in an operational practice that may contradict both. Digitisation is not transcription; it is adjudication. The Denver procurement asked for a supplier able to demonstrate experience mapping complex block faces that change over time — the single phrase that best describes why this work resists automation and why it is procured from firms with street-level capability.
Downtown pilots expose how much reconciliation the work requires. West Hollywood’s programme began with a survey of roughly 100 curb miles, imported under CDS, and then had to integrate existing kerb vendors so utilisation data from several sources landed in one record. The survey was the easy part. Making four vendors agree about the same kerb was the product.
Downstream consumption and the limits of the licence
Link six is the reason the kerb layer is worth more every year. Once a kerb is described in machine-readable form, it can be consumed by routing engines, delivery dispatch, parking payment, enforcement and — eventually — by vehicles. Each of those consumers needs the record to be current, and currency is a subscription. The same dataset that is worth USD 125,000 a year to the authority that must maintain it is worth a fraction of that to any single downstream consumer, which is why authorities rather than commercial consumers anchor the revenue in this report.
Link seven, audit, is the quiet link that makes the others recur. A declaration of compliance is a statement about a dataset at a moment. Audit is how that statement is tested — by a national body sampling providers, by a regional authority reconciling a grant milestone, or by a city defending a permit decision. Nothing in this chain is sold more reliably than the ability to answer that test.
Investment Activity
Two capital pools, feeding each other badly
Money enters this market from two directions, and the market only makes sense if you keep the two clocks separate. Public capital — grant programmes and regional set-asides — funds the first version of a dataset: the pilot, the survey, the digital twin. Private capital — vendor equity and, increasingly, acquisition by engineering and systems firms — builds the product that maintains it. The gap between those two clocks is where most of the casualties in this category sit.
The public pool is small but unusually visible, which makes it a good read on intent. The Denver region’s Innovative Mobility Set-Aside allocated USD 4 million across four years of its transport improvement programme, with roughly USD 2 million contributed by the state department of transportation for the first two years, and selected seven projects. From that pool came the USD 250,000, 24-month curbside digital twin contract. At federal level, a USD 2 million award funded a digital inventory of loading zones across downtown Los Angeles, and a joint USD 15 million Stage 2 award to Seattle and Minneapolis in December 2024 scaled commercial vehicle permitting and curb management together.
Set those against the model. The entire kerb data layer in 2025 is USD 168.5 million globally. A handful of American grant awards in a single year therefore represents a material share of the Western kerb digitisation pipeline — which tells you both that public capital is decisive at the margin and that this market is nowhere near the scale at which private capital would fund it organically.
The private side is consolidating vertically, not horizontally
We model recent merger and acquisition activity as present, and the character of it is consistent across the transactions that have been publicly reported. Engineering and professional services firms have acquired kerb and mobility data platforms to convert a project capability into an asset-management one. Analytics and location businesses have folded into larger transport and infrastructure groups. Parking operators and payment processors have bought permitting and analytics front ends rather than build them.
What has not happened is horizontal consolidation among data-exchange platforms. The reason is structural: the switching cost sits in the city’s authoritative record, not in the software, so buying a competitor buys a customer list and a migration project rather than a stock of defensible contracts. Vertical acquisition is cheaper and faster, because the acquirer already holds the account through another service line.
Transaction values in this category are largely undisclosed and we have not imputed them. Any multiple quoted for this market deserves suspicion: the participants are mostly private, their segment revenue is not reported, and the acquirers are conglomerates for whom the target’s revenue is immaterial to group disclosure.
Why capital intensity stays low
We classify capital intensity as low, and that classification is doing real work in the forecast. There is no fab, no network build, no fleet. The marginal cost of adding an instrumented authority is a survey crew, an implementation engineer and some cloud capacity. A dollar of incremental revenue therefore requires very little capital, which is why a fragmented market of small firms can persist indefinitely without consolidating — and why capital availability is not the binding constraint on growth.
The binding constraints are procurement capacity and qualification. Denver drew ten proposals and disqualified four, leaving six. In a market where a city needs a credible supplier and only a handful can demonstrate CDS-conformant delivery at citywide scale, what limits growth is not investment. It is the number of teams that can pass a bid evaluation.
What the revenue mix says about where to invest
The 71.41% recurring share in 2025 rising to 82.10% by 2033 is the investment thesis stated numerically. But the mix matters more than the aggregate. Survey and implementation work carries a real cost base — people, vehicles, time — and a modest gross margin. Licence and compliance revenue carries a software gross margin. Analytics sits between the two, with a data acquisition cost and a competitive price.
The implication is that a business with 60% of revenue in one-off work and 40% recurring is worth materially less per dollar of revenue than the reverse, even at identical totals. Our forecast has the one-off share falling from 28.59% to 17.90%, which means the average dollar of 2033 revenue is a better dollar than the average dollar of 2025 revenue.
The installed record is the asset everyone is buying
The clearest investment pattern in the category is that buyers are paying for installed records rather than for new platforms. A city that has been digitised — kerb lines walked, signage reconciled, zones published, CDS API live, vendor integrations complete — is expensive to replace and cheap to renew. That asymmetry, not technology, is what makes the record worth acquiring.
It also explains a pattern that looks odd from the outside: firms paying for businesses with unglamorous revenue and thin margins. The revenue is thin because survey work is priced competitively. The margin arrives at the second renewal, when the survey cost is fully sunk and the only work left is maintenance — and by then the customer has stopped comparing prices.
What would change the investment case
Three observable signals would move our view. A European enforcement action against a municipality for a deficient declaration would convert the compliance obligation from a paper risk into a budgeted one, and pull the 2026 ramp forward. A mandated-format publication requirement that cities cannot satisfy without buying a product would remove most of the substitution risk at a stroke. Conversely, a well-executed shared regional service — one dataset, thirty authorities, one supplier — would prove the cheap-compliance path at scale, and that is the single development most likely to make our 2033 forecast too high.
Technology & Innovation
The innovation is a release schedule
Nothing in the physical layer of this market is remarkable. The camera is a camera; the survey vehicle is a survey vehicle; the GPS trace in an operator feed is the same GPS trace that has been in a dispatch system for twenty years. The technology that matters here is documentary, and its central artefact is a version number.
That is not a rhetorical flourish. MDS has shipped six distinct APIs since 2018 and stands at release 2.1.0. CDS reached 1.0 in May 2022 and 1.1 in November 2025. Each release changes what a conformant feed must contain, which means each release is a re-validation event across every feed an authority accepts and a re-certification event for every vendor that supplies them. A standards cadence is therefore a revenue cadence, and the firms that treat the release schedule as a product roadmap outperform the firms that treat it as a compliance nuisance.
Three technical shifts that change the commercial model
From a published map to a live market. CDS 1.1 added real-time event reporting and multi-format payment tracking. That is a more significant change than it sounds. A static description of the kerb supports planning and routing; a live event feed with payment states supports pricing, allocation and enforcement in something close to real time. The moment kerb data carries availability and price together, the dataset stops being a layer on a map and becomes market infrastructure — and market infrastructure is renewed annually because the market does not pause.
From retrospective audit to machine-checkable policy. The policy API in MDS lets a provider query the rules that determine whether an action is permitted, rather than discovering a violation weeks later in a report. This shifts the operator from disputing a finding to pre-clearing an action, which in turn changes what a city is buying: not a record of violations, but a rule set that is executable. Cities that adopt only the provider API buy a reporting product. Cities that adopt policy, geography and jurisdiction buy an operating system.
From citation to pricing at the kerb. The clearest evidence of convergence between data and enforcement is California’s SB 1292, which authorises six cities to deploy automated cameras that charge fees for loading zone access. Once access is priced by camera, the data layer is no longer advisory — it is the billing evidence. The same shift is visible in Pittsburgh’s managed loading zones, where time limits monitored by camera produced 70% more vehicle turnover and 60% shorter dwell across twenty zones over three years.
The interoperability tax is the product nobody advertises
A city does not live inside one schema. A European authority publishing into a National Access Point must supply DATEX II, INSPIRE, NeTEx or SIRI depending on the dataset; the same authority running MDS receives JSON feeds over HTTP; the same authority’s kerb dataset is expressed in CDS. Add GTFS for fixed-route transit, GBFS for micromobility and GOFS for passenger modes — the specification requires that MDS-compatible provider and agency feeds also expose a public GBFS or GOFS feed — and a mid-sized city is maintaining half a dozen schemas that describe overlapping reality.
The translation layer is where a great deal of the unglamorous value in this market sits. It is also where most implementations fail: not because any single conversion is hard, but because identity has to be preserved across all of them. A zone identifier in a kerb dataset must mean the same place as a geography identifier in an operator feed, in the same projection, at the same precision, across versions. Getting that wrong produces a technically compliant dataset that is operationally useless.
Privacy engineering became a feature requirement
The early privacy fight over real-time scooter tracking left a permanent mark on the architecture. The metrics API exists in part so that a city can answer a policy question from aggregate data rather than individual traces; the governance structure carries a standing Privacy, Security and Transparency Committee; and retention limits are now written into the specification’s guidance rather than left to procurement.
This has a commercial consequence that is easy to miss. Vendors that can demonstrate aggregation, minimisation and defensible retention win renewals that competitors lose on capability, because the city’s own privacy assessment is the gate. Engineering for data minimisation is not altruism; it is what makes the dataset signable.
Digital twins and the return of the asset register
The most telling artefact of the last two years is the phrase cities now use for the kerb dataset: a digital twin. Denver procured a Curbside Digital Twin explicitly as a GIS record consistent with CDS and its existing asset-management platform, integrating kerb lines, street-sign asset data and policy restrictions. That is not the language of a pilot. It is the language of an asset register that will be maintained, audited and depreciated.
Once a city describes its kerb as an asset register, the buying behaviour changes permanently. Asset registers get annual maintenance budgets, change-control procedures and audit trails. They are also, from a supplier’s perspective, the most durable product in the category — because the moment the register becomes the system of record for permits, pricing and enforcement, replacing it costs more than maintaining it.
Where there is no innovation to speak of
We see no meaningful patent concentration in this category and we model patent activity as low. That is what an open-standard field looks like: the intellectual property is contributed, the schemas are public, and defensive patenting is close to pointless when the specification is the moat and nobody owns it. Anyone forecasting a licensing-led margin expansion in this market is forecasting against the governance model.
Market Risk
The bear case is not that cities stop caring. It is that they comply cheaply.
We model substitution risk as high, and it is the most important call in this report. Nothing in the legal architecture of this market requires a city to buy a product. A municipality can satisfy a publication obligation with an open-data portal and a well-formed file; a regional authority can publish once on behalf of thirty members; an operator’s own reporting portal can carry the data. Each of those paths is cheaper than a licence, and all three are in use.
The reason the market exists anyway is that compliance is not the only thing a city is buying. It is also buying the ability to win an argument — with an operator over a permit condition, with a national body over a sampled declaration, with a council over why a loading zone moved. A file does not win arguments. But a file is much cheaper, and in a budget year where the argument is not live, the file wins.
The value exposure is more concentrated than the probability suggests. Tier 3 authorities below 150,000 population account for USD 22.14 million of the 2025 market — 3.6% of value. If half of them satisfy their obligations through a shared regional service, the forecast barely moves. Tier 2 cities between 150,000 and 500,000 are the exposed cohort: USD 131.04 million, 21.4% of the base year, and numerous enough to be a political constituency for a shared service.
Grant dependency is a timing risk, not a demand risk
Roughly 28.59% of 2025 revenue is one-off — inventory surveys, integration and implementation. That is the portion most exposed to a narrowing of federal and regional grant programmes, and it is the portion that would fall first and fastest if SMART-style funding contracted. The recurring 71.41% is largely insulated, because it is anchored to obligations that do not depend on a grant cycle.
That asymmetry is genuinely reassuring and genuinely uncomfortable at the same time. A funding shock would hit revenue quickly because it hits the visible, contracted, one-off work first. But it would hit a minority of revenue, and it would hit the part of the market with the lowest margin. Suppliers with heavy survey exposure would feel a 2027 contraction far more than the market totals suggest.
Political risk at the kerb is real and under-priced
Once a city prices kerb access, it has created a political object. California’s authorisation of six cities to charge fees for loading zone access using automated cameras is the clearest example: the technical capability is unremarkable, and the political contest over charging for a space that was previously free is not. A change of administration, a lawsuit from a trade association, or a council vote can pause a programme that a vendor has already staffed for.
The data layer is less exposed than the enforcement layer, because a description of the kerb is not a charge on anyone. But the two are increasingly sold together, and a vendor whose contract depends on the camera charging revenue is exposed to a decision that has nothing to do with data quality.
Privacy and legal risk can invalidate a dataset, not just delay it
The operator data layer holds records of where identifiable people travelled, and the litigation history is not hypothetical: the Electronic Frontier Foundation and the American Civil Liberties Union sued to stop Los Angeles collecting real-time GPS tracking data from rental scooters. A retention limit that tightens, an aggregation standard that changes, or a ruling that a dataset was unlawfully held does not merely delay a project — it requires the record to be destroyed and rebuilt, which is the only event in this market that can erase recurring revenue mid-contract.
Vehicle identity carries a separate exposure. Plate-level enforcement data sits under its own legal regime, and vendors that hold trip data and plate data under one contract concentrate two unrelated risks in one instrument.
Standards and format divergence
The European mandate specifies DATEX II, INSPIRE, NeTEx or SIRI depending on dataset, while the city-side operational layer runs on MDS and CDS. If the mandated format and the operational format diverge further, translation cost rises — which cuts both ways. It raises the compliance burden on the authority, supporting the subscription; it also raises the risk that a city pays twice for the same description and concludes the whole stack is bad value.
The more under-appreciated version of this risk is version churn arriving faster than budgets can absorb. Six MDS APIs since 2018 and two CDS releases in three and a half years is manageable. A release every eighteen months across both specifications, with a mandated European format revision in the same cycle, is a re-validation load that small authorities will not carry in-house — which is good for vendors and bad for the price a small authority can pay.
Vendor failure strands the record
A significant share of the specialists in this market are small firms with a single product and a thin balance sheet. If one fails, the city does not lose a supplier; it loses the authoritative record of its own kerb, in a proprietary format, at the exact moment it needs to sign a declaration. Procurement remedies exist — source-code escrow, open-data clauses, export obligations — and they are inconsistently used.
This is a risk that the market creates for itself, and it is a slow-acting one. It becomes acute in the 2027–2029 window, when the first generation of three-to-five-year kerb platform contracts, signed in the 2022–2024 wave, comes up for renewal into a supplier base that has consolidated.
The deflation sensitivity
Revenue per instrumented curb-mile falls from USD 799 to USD 581 in our base case — 3.91% a year. If digitisation commoditises faster, at 5.9% a year, and curb-mile coverage holds, the 2033 market would be roughly 15% smaller. That is the single largest numeric sensitivity in the forecast and it is driven by one assumption: that extracting a rule from a sign remains cheaper to buy than to build.
Automated extraction from street-level imagery is the technology most likely to break that assumption. It would not destroy the market — somebody still has to adjudicate a contradictory sign — but it would move the work from a survey crew to a processing pipeline, and processing pipelines deflate.
Regulatory Landscape
A mandate that stops at the point of publication
The legal architecture of this market is best understood as a chain of delegated regulations that each compel a different kind of data, none of which compels the collection of anything the authority does not already hold. In Europe the parent instrument is the ITS Directive, and the four delegated regulations underneath it cover multimodal travel information, real-time traffic information, safety-related traffic information and eCall. The second of those is the one that reaches a city hall.
The Multimodal Travel Information Services regulation — 2017/1926 as amended by 2024/490 — requires data providers, including municipalities, to make specified datasets discoverable through a National Access Point. The guidance published for national bodies is unusually candid about the limits: the obligation covers data that is already available in a machine-readable format, and there is no obligation to digitise. A city whose kerb regulations exist only on signs and in a code is compliant by publishing nothing at all.
Two provisions give that otherwise hollow obligation teeth. First, provision must be accompanied by a declaration of compliance and supporting documentation. Second, national bodies assess providers selected by random sampling against per-article compliance forms, and in some member states a financial penalty can be imposed on a data or service provider that does not meet the requirement. A declaration is not a formality when it can be sampled and fined.
2026 is when the obligation changes character
The revised ITS Directive’s Annex III mandates the creation of certain static multimodal traffic data from 2026 onwards, and the categories are concrete: points of interest, cycle route networks, pedestrian and accessibility networks, park-and-ride and bike-share stations including the permitted drop-off zones defined by the city, secured bicycle parking, and car parking including where and how to pay for it, published in DATEX II, INSPIRE, NeTEx or SIRI as appropriate.
Read that list as a specification for a kerb dataset and the market’s forecast stops being an assumption. Permitted drop-off zones defined by the city, and where and how to pay for parking, are precisely the objects that CDS was written to describe. From 2026 an authority that has never built a machine-readable description of its own kerb has to build one, publish it in a mandated format, keep it current, and declare compliance for it.
The ramp does not stop there. The real-time traffic information regulation, 2022/670, applies from 1 January 2025, with the requirement extending to the full network from 1 January 2028. It brings holders of in-vehicle generated data into scope and sets a fifteen-minute update requirement for safety-related dynamic data. Every one of those requirements is a feed with a service level attached — which is a subscription by another name.
The United States regulates through procurement instead
There is no federal kerb data mandate in the United States, and there is unlikely to be one. The obligation arrives through three other routes. Municipal permit conditions require mobility operators to report under MDS as a condition of operating. Federal grant programmes fund the digitisation directly, with milestone reporting requirements that function as a compliance regime. And state law is beginning to price the kerb rather than merely describe it: California’s SB 1292 authorises six cities to deploy automated cameras that charge fees for loading zone access.
The practical effect is a different kind of stringency. A European city faces a dated obligation and a sampled audit. An American city faces a grant agreement with a deliverable and a permit condition it can enforce against an operator. The first produces steady renewal revenue. The second produces lumpy, visible contracts — which is exactly the pattern in the observed price points: USD 250,000 over 24 months in Denver, USD 2 million for downtown Los Angeles loading zones, USD 15 million jointly for Seattle and Minneapolis.
Privacy is the operative constraint on the operator layer
The operator data layer has a compliance risk that the kerb layer does not: it is a record of where identifiable people travelled. That risk became litigation early. The Electronic Frontier Foundation and the American Civil Liberties Union filed suit to stop the City of Los Angeles collecting real-time GPS tracking data on citizens’ rental scooters, and the dispute shaped how the standard is now governed — the Open Mobility Foundation maintains a standing Privacy, Security and Transparency Committee alongside its technology council.
The regulatory consequence for vendors is that retention, minimisation and aggregation are not features but preconditions. A city cannot accept a feed whose retention exceeds what its own privacy assessment permits, and it cannot sign a declaration for a dataset it cannot lawfully hold. Vehicle identity carries the same weight: plate-level enforcement data sits under a separate legal regime from trip data, and the two are frequently collected by the same vendor under contracts that treat them as one thing. Our work on ALPR and vehicle identity for access makes the same point from the enforcement side: the camera is the easy part, and the statute prices the mistake higher than the reader.
Why the approval pathway is multi-jurisdictional
The single most under-modelled fact about this market is that one dataset can require four separate approvals held by four separate bodies: a city permit office accepting an operator’s feed, a national body receiving a declaration, a regional authority releasing a grant milestone, and a procurement office awarding the contract. Each has its own definition of acceptable evidence.
That is why we classify the approval pathway as multi-jurisdictional rather than licence-based or standardised commercial. It is also the structural reason compliance work cannot be delivered as a one-off implementation: the four approvals do not fall due on the same date, and none of them stays valid indefinitely. The regulatory landscape does not merely permit a recurring revenue model. It requires one.
