Global eVTOL Ground Handling, Charging & Passenger Transfer Operations Market Report, Size, Share and Forecast 2026–2033: A Vertiport Is an Airline Terminal With No Airline in It
The servicing layer for electric vertical take-off aircraft was worth USD 5.60 million in 2026, across 250,000 serviced departures, and reaches USD 864.69 million by 2033 across 4.22 million departures, a 105.43 per cent compound annual rate over seven periods. Revenue per serviced departure rises from USD 22.40 to USD 205.00, a 37.20 per cent rate, and departure count compounds at 49.73 per cent.
Read that decomposition before the headline. In log terms, 99 per cent of the growth is count and one per cent is price, and the price change is not inflation. It is a different aircraft on a different mission: a one-passenger sightseeing pod flying a short loop, replaced by a four-passenger air taxi with a screened terminal, a baggage hold and a surface handover. The market grows because the aircraft changes, not because the fee rises.
The base year is small for a reason that is structural rather than temporary. There is no independent payer. The three operators with commercial traction each run their own ground layer: EHang's first two air operator certificate holders, EHang General Aviation and Heyi Aviation, begin ticketed sightseeing in Guangzhou and Hefei in March 2026 with six to ten aircraft and one passenger per flight at an early-bird fare of RMB 299; Joby is the designated air taxi operator for Skyports' Dubai vertiports under a six-year exclusive arrangement; Archer's UAE service is flown by Abu Dhabi Aviation as its local operating partner. Nobody is bidding for a handling contract because nobody has separated the aircraft from the ground.
That shows up in the arithmetic of a departure. Servicing is 69 seconds of physical handling — the marshalling step is timed at 68.96 seconds in simulation — while the pad is occupied for a median of 12 minutes on an EHang 216, with an interquartile range of 10 to 16 minutes and a maximum of 33. Sixty-nine seconds of labour cannot carry a fee; the pad and the charging position can. So the revenue in this report is not handling in the aviation sense. It is site access, energy and passenger throughput sold by the turn.
The capital asymmetry is the report's sharpest number. Our sibling infrastructure work puts USD 1.62 billion of vertiport and UAM ground infrastructure in 2025 against USD 5.60 million of ground service revenue in 2026 — a ratio of 289 to 1. By 2033 the infrastructure base reaches USD 11.40 billion against USD 864.69 million of service revenue, a ratio of 13 to 1. Capital has arrived; the revenue that was supposed to pay for it has not.
Energy is the line that decides whether a site works. The FAA's vertiport electrical infrastructure study, produced by the National Renewable Energy Laboratory, puts DC peak charging at 300 kW to 1 MW per aircraft, recommends planning for 1 MW, and finds site demand at six to seven times the aircraft's own peak: a constrained three-charger site draws about 900 kW where an unconstrained one reaches 13.3 MW. With grid connections taking one to four years, the charging asset is a barrier to entry rather than a profit centre — and because electricity carries no retail fuel margin, a vertiport cannot price energy the way a fixed base operator prices avgas.
Certification is the second half of the gate. The Federal Aviation Administration issues no vertiport certificate and regulates the sites as heliports under AC 150/5390-2D, with Engineering Brief 105A as supplemental guidance. EASA's vertiport specifications remain prototype, non-binding guidance pending its rulemaking task. The UAE certified the Dubai Marina vertiport in November 2026 under CAR AGA Part VFI, which is why the first commercial vertiport-to-vertiport route exists there and nowhere else. China has gone further on the human side, creating a licensed ground operating crew category for pilotless aircraft — the first regulatory job definition written specifically for this layer.
A note on the headline rate, because it is arithmetic on a pilot-scale denominator and should not be read as a demand statement. On the window where a real air-taxi market exists, growth is far lower: 67.8 per cent from 2029 to 2033, and 48.9 per cent from 2031 to 2033. The 105.43 per cent is the distance between a sightseeing market and an air-taxi market, not a claim that a USD 864.69 million layer will double every year for a decade.
A vertiport is an airline terminal with no airline in it. That single absence determines everything in this report. An airport terminal is financed against a lease signed by carriers who commit to volume; a vertiport has no carrier to sign, because the aircraft operator is also, today, the ground handler. So the infrastructure gets built on a concession and the service layer gets absorbed as a cost inside the operator's own profit and loss account.
This report sizes that service layer — ground handling and turnaround, energy and charging, and passenger processing and transfer — as revenue earned per serviced departure, from 2026, the first year in which a paying passenger was handled at a vertiport, to 2033. It is deliberately not a report about vertiport construction, which is a separate question of pads, grid connections and real estate, and it is not a report about aircraft. It is about the twelve minutes between one flight and the next.

What this market is, and what it is not
Two boundaries matter. First, this report counts only recurring operations — the money that moves every time an aircraft turns. Capital spent on building the pad, the terminal shell, the substation and the chargers is excluded, because it is counted in our vertiport and UAM ground infrastructure report and counting it twice would double the site. Second, the buyer is the party that pays the servicing bill, which in 2026 is almost always the aircraft operator, and by 2033 is increasingly the site operator charging per departure and per passenger.
What that means for a reader is that the numbers here are small at the start and large at the end, and the interesting part is the transition rather than either end.
Table of Contents
| # | Section | What it answers |
|---|---|---|
| 1 | Executive summary | The size, the decomposition, and why the base year is small |
| 2 | Who handles the aircraft, and what they are paid | The six servicing tasks and who buys them |
| 3 | Sixty-nine seconds of work, twelve minutes of pad | Where the time budget actually goes |
| 4 | The per-departure revenue build | USD 22.40 becoming USD 205.00, line by line |
| 5 | Ten minutes and a megawatt | The charging layer as the binding constraint |
| 6 | Power per aircraft, and the site multiplier | 300 kW to 1 MW, and the 13.3 MW site |
| 7 | Energy per turnaround | Kilowatt-hours, tariffs and the missing fuel margin |
| 8 | Self-handling by default | Why the operator is the ground handler |
| 9 | Who could become the independent handler | FBOs, vertiport operators and ground handlers |
| 10 | Market structure and concentration | Six tier-one players and no contest |
| 11 | A terminal without a certificate | How a vertiport is approved, and by whom |
| 12 | Vertiport certification across three regimes | FAA, EASA and the UAE |
| 13 | Operator and ground-crew licensing | The new job category and the screening gap |
| 14 | Who funds a terminal with no airline anchor | Concessions, exclusivity and payback per site |
| 15 | Utilisation is the only variable that matters | The risk register |
| 16 | Scenarios and what would falsify them | Base, upside and constrained, reconciled |
Competitive Landscape
Chapter 3 — Self-Handling by Default
The competitive structure of this layer is not the structure of a services market. It is the structure of three vertically integrated businesses, each of which owns the aircraft, the operating certificate and the ground process, and each of which currently has no reason to buy servicing from anyone else. Until that changes there is no contest, which is why competitive intensity in this layer is genuinely low even though the aircraft market above it is crowded.
The operator is the ground handler
Dubai is the clearest case, because it is the only place where a purpose-built commercial vertiport has been certified and a route is defined. Skyports designs, builds, owns and operates the vertiports under an arrangement with the Roads and Transport Authority, and Joby is the designated air taxi operator with a six-year exclusive right to run the service. The Dubai Marina site was certified in November 2026 as the world’s first permanently sited commercial vertiport and serves the first permanent vertiport-to-vertiport route, with a network of four nodes planned across Dubai International, Palm Jumeirah, Downtown and the Marina. The authority’s public position is a commercial launch target in the second quarter of 2027, with two aircraft initially and piloted testing on board before the end of 2026.
Read the structure carefully, because two exclusivities are stacked. Skyports holds the site concession; Joby holds the route exclusivity. Neither of those is a handling contract, and there is no third party in the middle earning a per-turn fee. The site operator earns from access, and the aircraft operator earns from the fare.
Abu Dhabi shows the second model. Archer holds a restricted type certificate programme position for its aircraft and Abu Dhabi Aviation, a listed helicopter operator, runs the service as local operating partner, with Archer training the crews. That is closer to a separation — the operator is not the manufacturer — but the ground layer still sits inside the operator, and the operator is a helicopter business extending an existing base rather than a new servicing entrant.
China shows the third and most awkward model. EHang’s first two air operator certificate holders, EHang General Aviation and Heyi Aviation, launch ticketed sightseeing in Guangzhou and Hefei in March 2026 with six to ten aircraft, one passenger per flight and an early-bird fare of RMB 299. One of those two certificate holders is the manufacturer’s own general aviation arm. A manufacturer that holds an operating certificate and competes with the customers it sells aircraft to is simultaneously the supplier, the operator and the handler, and it sets the reference price for ground service in the only market with real volume.
| Model | Site owner | Ground layer run by | Where it operates |
|---|---|---|---|
| Stacked exclusivity | Skyports, under RTA arrangement | The aircraft operator, as designated operator | Dubai |
| Local operating partner | Third-party terminal and heliport operators | A licensed operator with an existing rotary base | Abu Dhabi and the wider UAE |
| Manufacturer-operated | Tourism sites and municipal parks | A certificate holder affiliated with the manufacturer | Guangzhou, Hefei |
| Retrofit on existing aviation real estate | An FBO or airport authority | The FBO, extending its existing ramp team | The United States, in prospect |
Who could become the independent handler
Four kinds of company are positioned to take this layer if it separates, and none of them has yet done it at scale.
Vertiport developers are the most obvious. Skyports already owns and operates, which is one contractual step away from selling servicing to a second and third operator at the same site. Ferrovial’s vertiport arm and comparable European developers hold a similar position in their own markets. The obstacle is that a site with one operator has no incentive to build a separate servicing business, and a site with two has not yet existed.
Fixed base operators have the real estate and the regulatory familiarity. The United States alone counts 5,712 heliports in the FAA’s October 2026 data cycle, a large share of them on private FBO ramps, and the retrofit of an existing heliport is the fastest route to a working eVTOL site. Atlantic Aviation’s position in the vertiport conversation is built on exactly that. The problem is the business model: an FBO is organised around a 60 to 90 minute jet turnaround with catering, customs and a lounge, and its revenue is fuel. An electric aircraft needs twelve minutes, no catering and no fuel margin. An FBO that turns its ramp over to electric aircraft inherits the fixed cost of the building without the fuel spread that pays for it.
Ground handlers have the labour model and the safety culture. Swissport-scale organisations run variable shift patterns against volatile daily schedules, which is precisely the problem a vertiport has. But the task to be performed is 69 seconds of work on an aircraft that arrives with one to four passengers, and a handler’s economics depend on labour hours sold. This is the least likely entrant of the four, and it is the one most often named.
Aircraft manufacturers are already inside the layer, and in one case inside the certificate. The direction of travel in 2026 is manufacturer-led integration rather than separation: the manufacturer specifies the charger, trains the crew, sometimes holds the operating certificate, and therefore sets the standard the independent handler would later have to meet.
Market structure and concentration
We count six tier-one players in the aircraft-and-ground systems that define this layer, and describe the structure as moderately consolidated with low competitive intensity. That pairing is unusual and it is not a contradiction: the aircraft market is crowded at six or more credible developers, while the servicing layer is uncontested because its customers are its owners. Contestability, when it comes, will arrive from the site side rather than the aircraft side — from a concessionaire with more than one operator and a reason to price access per turn.
The practical test for a reader evaluating an entrant is simple. A servicing business needs three things: more than one aircraft operator at the same site, a settled charging interface, and a fare high enough to carry a ground cost. In 2026 no site in the world has all three.
Key message: self-handling is not a strategic choice by the current operators, it is what a market looks like before it has a buyer. The first site that hosts two competing operators converts this layer from a cost allocation into a price.
Value Chain
Chapter 1 — Who Handles the Aircraft, and What They Are Paid
There is no such thing as an eVTOL ground handler yet. There are aircraft operators who happen to own the ground, and that distinction is the whole of this market. It explains why a layer sitting under USD 1.62 billion of committed vertiport infrastructure was worth USD 5.60 million in service revenue in 2026, and it explains why that number will be unrecognisable in seven years.
Start with the work, because the work is small. Servicing an electric aircraft between flights is six tasks. Pad control and foreign-object inspection, which on an electric aircraft means the same discipline as on any other plus a check that nothing has been left near a high-voltage connection. A walkaround, a clean and a battery state check. The charging connection itself, which is a physical act with a thermal consequence. Passenger processing, meaning booking verification, screening where screening is required, briefing and boarding. Baggage, which on a four-seat aircraft is a hold the size of a large car boot. And at a city site, the handover of the passenger to whatever surface vehicle is taking them the last mile. At an airport-adjacent site there is an eighth task, which is the interaction with the airport’s own security and ramp regime.
Sixty-nine seconds of work, twelve minutes of pad
The peer-reviewed simulation work is unusually precise about duration. A discrete-event simulation of an EHang 216 turnaround published in Aerospace in January 2026 puts the median turnaround at 12 minutes, with an interquartile range of 10 to 16 minutes and a maximum of 33. A separate discrete-event study of vertiport operations times the physical sequence from landing to the ground handling agent at 68.96 seconds, with 30 seconds between successive handling actions and a documented ground handling duration of 30 to 60 seconds per action.
Put those numbers together and the economics of this layer become obvious and awkward. The labour content of a departure is a little over a minute. The asset consumed is the pad and the charging position, and it is consumed for twelve to thirty minutes depending on aircraft and procedure. No company builds a durable business charging for sixty-nine seconds of work; a fee large enough to cover a shift has to attach to the thing that is genuinely scarce. The unit of capacity in this market is pad-minutes, not labour-hours, and the same conclusion arrives from the other direction in the throughput literature: a vertiport with taxing and parking levels is modelled as breaking down somewhere around 1,200 arrivals a day, with efficient operation and delays under five minutes achievable at 500 to 1,000 arrivals a day, and only nine gates per pad being optimal for a linear topology.
| Measured quantity | Value | Source |
|---|---|---|
| Median EHang 216 turnaround | 12 minutes (IQR 10–16, max 33) | Nagrare and Lieb, Aerospace 13(1):109, January 2026 |
| Landing to ground handling agent | 68.96 seconds | Qanbari and Skorupski, vertiport operations discrete-event study, 2025 |
| Ground handling action duration | 30–60 seconds per action | Same study |
| Site breaking point | ~1,200 arrivals per day; 500–1,000 efficient | Nagrare and Lieb, 2026 |
| Realised versus theoretical capacity | ~50 per cent | Onat, vertiport charging and turnaround analysis, 2026 |
The per-departure revenue build
We build revenue per serviced departure from four lines, because that is how a site operator or an aircraft operator actually books it. Handling and turnaround is pad control, marshalling, the walkaround, cleaning and the crew’s time. Energy and charging is kilowatt-hours delivered plus the connection and the charger’s amortisation. Passenger processing is verification, screening where applicable, boarding and the terminal staff behind it. Surface transfer and baggage is the curb handover and the hold.
| Line, USD per serviced departure | 2026 | 2033 | What moves it |
|---|---|---|---|
| Ground handling and turnaround | 9.00 | 78.00 | Crew count per turn, and a four-seat aircraft requiring a proper turnaround rather than a sightseeing reload |
| Energy and charging | 5.40 | 31.00 | 45 kWh rising to 125 kWh per turn, at an airport industrial tariff |
| Passenger processing | 5.00 | 66.00 | One passenger without a terminal, becoming four passengers through a screened, staffed terminal |
| Surface transfer and baggage | 3.00 | 30.00 | The curb handover becoming a product rather than an afterthought |
| Total revenue per departure | 22.40 | 205.00 | 9.2-fold, of which almost none is fee inflation |

The composition matters more than the total. In 2026, 40 per cent of a departure’s ground revenue is handling and 24 per cent is energy; by 2033 handling is 38 per cent and energy 15 per cent, while passenger processing rises from 22 to 32 per cent. That is the signature of a layer moving from aircraft care to people movement, and it is why the skill mix at a site changes faster than the equipment does.
The fare ceiling test
The reality check on all of this is the ticket. EHang’s first two air operator certificate holders, EHang General Aviation and Heyi Aviation, launch ticketed aerial sightseeing from Guangzhou and Hefei in March 2026 with an initial fleet of six to ten aircraft, one passenger per flight, at an early-bird fare of RMB 299. At RMB 7.1 to the dollar — an assumption on our part, not a disclosed rate — that is roughly USD 42 of revenue per departure, for a point-to-point sightseeing hop.
A departure cannot pay USD 22.40 for its ground layer out of a USD 42 ticket and leave anything for the aircraft, the supervision, the energy or the site. This is the arithmetic that makes the base year small, and it is not a temporary inefficiency. In 2026 the ground layer is not being sold; it is being absorbed by operators who own both the aircraft and the site, or underwritten as market development by a manufacturer that reported USD 72.9 million of revenue in 2025. Any forecast that assumes an independent handler earning a margin on a RMB 299 sightseeing fare is forecasting something the ticket price forbids.
| Who pays the servicing bill | 2026 share of departures | 2033 share | Consequence for the layer |
|---|---|---|---|
| The aircraft operator, absorbing the cost | ~97 per cent | ~45 per cent | No contracted market, no margin, revenue is a cost allocation |
| A vertiport operator charging per departure | ~3 per cent | ~40 per cent | Contractual revenue with a per-turn price and a service level |
| A third-party handler or FBO | 0 per cent | ~15 per cent | The only genuinely contestable segment, and the smallest |
Key message: the thing being sold in this market is not a handling service. It is access to a pad, electricity, and a way through a terminal — and until the aircraft operator and the site operator are different companies, it is not being sold at all.
Investment Activity
Chapter 5 — Who Funds a Terminal With No Airline Anchor
Every airport terminal built in the last fifty years was financed against a signature. Carriers sign use agreements that commit to gates, to passenger volumes and to rates, and the bond market lends against those agreements. A vertiport has no signatory airline, which means the concession itself has to do the work that a lease does at an airport, and it has to be priced accordingly.
The anchor-tenant substitute is exclusivity
Our vertiport infrastructure work puts capital spend at USD 13.73 million per site in 2025, falling to USD 8.51 million by 2033 as the mix shifts toward pads and retrofits, with energy and charging the largest single layer at USD 3,190 million and 28 per cent of 2033 value. Somebody has to commit that capital before a single fare is sold, and the instrument that has emerged is not a lease but a stacked exclusivity: the site concessionaire holds the ground, and the aircraft operator holds the route.
Dubai is the template. Skyports finances, builds and operates the vertiports; Joby holds a six-year exclusive right to operate the service; the transport authority sets the network and the launch timetable, with a public target of the second quarter of 2027 and two aircraft initially. Nothing in that structure guarantees throughput to the site. What it guarantees is that no competitor can use the site, which is a defensible asset in a market where the alternative is being the second vertiport in a city of two aircraft.
The other funding routes visible in 2026 are narrower. Airport authorities fund vertiports as access infrastructure, in the way they fund road improvements, because the passenger’s first and last mile is their problem. Fixed base operators fund retrofits on real estate they already own, which is the cheapest route to a working site. And state-linked operators fund the ground layer as part of a wider mandate, which is what Abu Dhabi Aviation’s role as Archer’s operating partner amounts to.
The payback arithmetic an investor should run
The number that decides whether a site is financeable is the departures needed to recover it. At the 2033 unit economics in this report, a site generating USD 205 per departure against USD 8.51 million of construction needs 41,512 departures a year to pay back in one year — about 114 a day. Spread over a ten-year recovery it needs 4,151 departures a year, which is about 11 a day.
| Recovery horizon | Departures per year required | Departures per day | What that implies |
|---|---|---|---|
| 1 year | 41,512 | ~114 | A functioning air-taxi hub, and no site in 2026 is near it |
| 5 years | 8,302 | ~23 | Achievable for an airport-access site with two aircraft on high utilisation |
| 10 years | 4,151 | ~11 | Achievable for a dense city pair; marginal for a tourism pad |
That table is the investment case in one place, and it is unforgiving. A site needs roughly eleven turns a day for a decade to return its construction cost at mature unit economics, before any operating margin. Eleven turns a day is two aircraft flying five or six rotations each. Which is to say that a vertiport’s viability is decided not by its design or its location alone but by whether the operator based there has enough aircraft to fly those rotations — and in 2026 the largest announced initial deployment anywhere is two aircraft in Dubai and six to ten in China.
The corollary is that the financing structure is doing the work that utilisation cannot yet do. An exclusivity is worth paying for precisely because the traffic does not exist: the concessionaire is compensated in market position rather than in committed volume, and the operator accepts exclusivity terms because the alternative is no site at all. This is a rational answer to a missing anchor tenant, and it is also why the layer is unlikely to become competitive quickly. Every exclusivity granted makes the next site’s incentive to host a second operator that much weaker.
Consolidation so far has been rescue-driven rather than strategic. The failures in the aircraft layer were resolved through asset sales to industrial buyers rather than orderly wind-downs, and the money entering the ground layer has come from infrastructure funds, sovereign-linked operators and airport authorities rather than from the servicing industry. Investment direction is rising, capital intensity is high, and the return profile is long — a combination that argues for a small number of well-located sites with captive catchments rather than a broad network.
Key message: a vertiport cannot be financed on a lease, so it is financed on an exclusivity, and the payback requires about eleven turns a day for a decade.
Technology & Innovation
Chapter 2 — Ten Minutes and a Megawatt
Charging is the only part of this layer where the physics fixes the answer before any commercial negotiation starts. A four-seat electric aircraft lands with a pack that must be returned to a high state of charge inside the interval the timetable allows, and the electrical demand that implies is an order of magnitude above anything a heliport has ever drawn. That single fact is why the charging position, rather than the handler, is the unit that gets priced.
Power per aircraft, and the multiplier that decides a site
The reference study is the FAA’s vertiport electrical infrastructure work carried out by the National Renewable Energy Laboratory. It reviews aircraft with battery capacities from 60 to 500 kWh and finds DC peak charging demand of 300 kW to 1 MW per aircraft, recommends that sites plan for chargers of 1 MW, and notes that a single departure consumes on the order of five per cent of onboard energy simply getting airborne. It considers ground-based and onboard cooling of the pack, and it explicitly does not rely on battery swapping: none of the aircraft examined in detail was designed to swap packs, so the turnaround is a charging event and not a pack exchange.
The number that matters for a site owner is not the per-aircraft figure but the multiplier. Simultaneous charging, air conditioning and terminal load put site demand at six to seven times the aircraft’s own peak charging rate. The study models a constrained site with three chargers drawing about 900 kW against an unconstrained configuration reaching 13.3 MW. For comparison, the 1,200-arrival-a-day site modelled in the capacity literature is a power problem before it is a pad problem.
| Site configuration | Connected demand | What it constrains |
|---|---|---|
| Single pad, single 300 kW charger | ~0.3–0.5 MW | One aircraft on charge; any second movement waits |
| Constrained multi-pad, three chargers | ~900 kW | Turnarounds queue behind the charge, not the pad |
| Unconstrained multi-pad | up to 13.3 MW | Substation capacity and the grid connection itself |
| Grid connection lead time | 1 to 4 years | Any site added after 2029 for a 2031 opening |
The connection lead time is the quiet constraint. Our vertiport infrastructure work records new grid connections taking one to four years, and a multi-aircraft site needing 5 to 10 MW. A site that electrifies after the aircraft arrive is a site that handles a fraction of what its pad count implies, which is exactly the gap between theoretical and realised capacity — modelled at roughly 50 per cent — that appears through this literature.
Energy per turnaround, and the missing fuel margin
Energy per turnaround in the air-taxi configuration settles near 125 kWh, against packs of about 160 kWh that can be restored in roughly six minutes at high rate for a short-hop mission, with a ten-minute charge the design target rather than an achievement. We price that at USD 31.00 per departure by 2033 — 125 kWh at about USD 0.25 per kWh — against USD 5.40 in 2026, which is 45 kWh on a sightseeing hop at about USD 0.12. Energy therefore falls from 24 per cent to 15 per cent of revenue per departure even as it rises 5.7-fold in absolute terms.
The reason it falls rather than becomes a profit centre is structural and it is the single biggest difference between a vertiport and a fixed base operator. An FBO’s margin is the fuel uplift: avgas and jet fuel are bought wholesale, sold retail, and the spread pays for the ramp, the lounge and the staff. Electricity is metered, tariffed and, at this scale, dominated by a demand charge — a capacity cost incurred for the power the site is able to draw, whether or not an aircraft flies that day. A 900 kW site pays for 900 kW in a quiet month. There is no spread to capture and no retail margin to protect, which means the charging asset has to be justified as a condition of operating at all, and its cost recovered through pad time and passenger fees rather than through the energy line.
That is not a small point of accounting. It removes the mechanism by which every previous generation of aviation ground infrastructure made money, and it is why the sites that are being built now are concessions with an exclusivity rather than competitive service businesses. Where there is no fuel margin, the only durable margin is scarcity of access.
Three connectors and no settled answer
The interface itself is unsettled, and that is an operating cost before it is a technical one. SAE’s AS6968 defines aircraft charging for electric aircraft, and J3271 extends the Megawatt Charging System to 1,500 volts and 3,000 amps. Alongside those, the Combined Charging System has been adopted on several development aircraft and backed by the general aviation manufacturers’ association, while at least one major air-taxi developer has pursued a proprietary ground electric architecture with its own connector. A site built for one interface and visited by an aircraft using another is a site with a stranded charger and a manual workaround.
The commercial consequence is that the charging position must be specified before the fleet is known, which pushes risk onto whoever owns the asset — and, in practice, into the concession terms. It also explains why interoperability is treated as a regulatory question in the next chapter rather than a purely engineering one: the approval pathway for a site is easier if the equipment is not bespoke.
Key message: energy is a pass-through with a demand charge attached, not a margin. The charging asset is a cost of entry into this market, and the money in the layer is earned on the pad and at the terminal.
Market Risk
Chapter 6 — Utilisation Is the Only Variable That Matters
Every number in this report reduces to one variable, and it is not the fare, the charger or the terminal. It is turns per aircraft per day. Departures are the product of how many aircraft are in commercial service and how many times each of them flies, and revenue per departure is a multiple applied to that count. When those two things move together the layer looks like a market; when they do not, it looks like a construction programme with a staff car park.

| Year | Serviced departures | Revenue per departure, USD | Market value, USD million |
|---|---|---|---|
| 2026 | 250,000 | 22.40 | 5.60 |
| 2027 | 480,000 | 34.00 | 16.32 |
| 2028 | 830,000 | 55.00 | 45.65 |
| 2029 | 1,330,000 | 82.00 | 109.06 |
| 2030 | 1,950,000 | 112.00 | 218.40 |
| 2031 | 2,690,000 | 145.00 | 390.05 |
| 2032 | 3,440,000 | 175.00 | 602.00 |
| 2033 | 4,218,000 | 205.00 | 864.69 |
The risk register
Eight things can break this forecast, and they are not equally likely.
| Risk | Likelihood | Severity | What it does |
|---|---|---|---|
| Certification slips beyond 2027 for the second and third aircraft types | Medium | High | Removes the 2029 to 2031 departures volume that carries 40 per cent of 2033 value |
| The fare ceiling binds: ground cost cannot exceed a fraction of a ticket priced near RMB 299 | High | High | Keeps revenue per departure near the 2028 level and caps the mix shift |
| No separation between aircraft operator and site operator | High | Medium | Revenue stays a cost allocation; the layer never becomes contractable |
| Grid connection and substation lead times of one to four years | High | High | Realised capacity stays near 50 per cent of theoretical; sites open short of aircraft |
| Charging interface fragmentation | Medium | Medium | Stranded charger assets and per-type site variants, raising cost per departure |
| Ground damage or a battery thermal event during turnaround | Low | High | Insurance and crew ratios both reset; a two-person turn becomes a four-person turn |
| Single-site concentration in every live market | High | Medium | One operator’s delay removes an entire city’s departures from the count |
| Substitution by helicopters and by surface transport | Medium | Medium | Holds the addressable catchment to the trips where time genuinely dominates price |
Scenarios and what would falsify them
Three scenarios, all built the same way — count multiplied by revenue per departure — so that each one reconciles arithmetically and none of them hides a residual.
| Scenario | Departures 2033 | Revenue per departure | Value 2033, USD million | CAGR 2026–2033 |
|---|---|---|---|---|
| Base | 4,218,000 | 205.00 | 864.69 | 105.43% |
| Upside — separation of operator and handler, three or more certified types, capacity at existing heliports | 5,900,000 | 218.00 | 1,286.20 | 117.42% |
| Constrained — certification slips, fare ceiling binds, self-handling persists | 2,100,000 | 168.00 | 352.80 | 80.74% |
The base case implies a global fleet of roughly 6,800 aircraft flying about 620 turns each a year, which is under two departures per aircraft per day. That is a deliberately conservative utilisation assumption sitting against an optimistic fleet assumption, and the two roughly offset. A reader who believes the fleet will be smaller should read the constrained case; a reader who believes utilisation will be higher should read the upside.
We would treat four observable events as evidence that the base case is wrong in one direction or the other. Upward: a certified site publishing a per-turn tariff for two competing operators, which would mean the layer has found a price. Upward: a second aircraft type in commercial passenger service outside China before the end of 2027. Downward: a certified vertiport instrument from the FAA or from EASA rulemaking, because it would impose terminal and crew requirements that raise cost per departure without raising revenue. Downward: a commercial fare settling below the cost of the surface alternative for the same city pair, which would cap the passenger throughput the terminal is built to serve.
What we do not claim. This report does not forecast aircraft deliveries, and nothing here should be read as a view on any manufacturer’s certification timeline. It does not price the vertiport building, the substation or the chargers, which sit in our infrastructure work and would double-count the site if included. It does not assert a disclosed tariff anywhere, because no site publishes one; the revenue per departure is a Pheonix estimate built from observed costs and observed fares and is labelled as such throughout. And it does not assume that a market which becomes contestable becomes competitive quickly, because every exclusivity granted so far works in the other direction.
Key message: the layer grows at 105 per cent a year because it starts almost nowhere, and the only number that will decide whether it arrives is how many times a day the aircraft actually turn.
Sources for this report are drawn from primary documents including EHang Holdings’ fourth quarter and full year 2025 results filed with the US Securities and Exchange Commission, the Federal Aviation Administration’s Engineering Brief 105A on vertiport design and its vertiport electrical infrastructure study produced by the National Renewable Energy Laboratory, EASA’s prototype technical design specifications for vertiports, Skyports’ agreements with the Dubai Roads and Transport Authority, and peer-reviewed vertiport throughput and turnaround research published in Aerospace. Pheonix’s own prior work on vertiport and UAM ground infrastructure provides the site count and capital figures used for comparison. No market research publisher is cited.
Regulatory Landscape
Chapter 4 — A Terminal Without a Certificate
The regulatory gap in this layer is specific and it sits in an unusual place. There is broad regulatory machinery for the aircraft and increasingly clear guidance for the pad. There is almost nothing for the terminal — the part of the building where a passenger is verified, processed and boarded — and the cost of the layer is decided there.
Vertiport certification across three regimes
The United States does not issue a vertiport certificate. The Federal Aviation Administration regulates these sites as heliports under AC 150/5390-2D, with Engineering Brief 105A, issued on 27 December 2024, providing supplemental design guidance for vertiports. That is guidance, not a certification instrument: a site is approved through local zoning, fire and building codes, and through whatever the host airport’s own operating rules require. The practical consequence is that a US vertiport’s passenger process is largely defined by its operator, and that the threshold for entry is municipal rather than federal.
Europe is further along in documentation and no further along in bindingness. EASA published prototype technical design specifications for vertiports, non-binding guidance intended to inform development while formal rulemaking runs through its rulemaking task on vertiport operations. Until that delivers, a vertiport in one member state is not automatically a vertiport in another, and developers treat the specifications as a design reference rather than a licence.
The UAE is the only jurisdiction operating a purpose-built certification pathway with a site certified against it. The Dubai Marina vertiport was certified in November 2026 under the CAR AGA Part VFI framework as the world’s first permanently sited commercial vertiport, and it is the reason the first permanent vertiport-to-vertiport route exists in Dubai rather than in a market with more aircraft. The United Kingdom has published a vertiport design proposal that, as it stands, covers visual flight rules operations only.
| Regime | Instrument | Binding | Effect on the servicing layer |
|---|---|---|---|
| United States | AC 150/5390-2D with EB 105A guidance | No vertiport certificate | Site approved as a heliport; passenger process set by the operator and host airport |
| European Union | EASA prototype technical design specifications | No, pending rulemaking task | Design harmonised in practice, approval fragmented by state |
| United Arab Emirates | CAR AGA Part VFI | Yes, with site certification | First certified commercial site and first defined route |
| United Kingdom | Vertiport design proposal | Draft, VFR only | Constrains instrument operations and therefore turnaround assumptions |
Operator and ground-crew licensing
On the operator side the constraint is certification sequence rather than rule absence. EHang’s two initial air operator certificate holders, EHang General Aviation and Heyi Aviation, are the first to be in a position to sell a ticket, which is what makes March 2026 the base date for this report. Archer’s restricted type certification position, granted in the UAE in 2026, allows limited operations to begin before full commercial certification is complete, with Abu Dhabi Aviation as the local operating partner and Archer training both pilots and ground crew.
The genuinely novel regulatory act for this layer is on the human side, and it happened in China. The civil aviation authority is expanding a pool of specially authorised ground operating crew, and a training standard for that crew is being developed — the first regulatory framework written for people who supervise pilotless passenger aircraft on the ground rather than for pilots. That matters commercially because it defines the labour input: a licensed ground crew member is a different cost from an ramp agent, and the training pipeline becomes a limiting factor on how fast a site can open.
Passenger screening is the unresolved variable that decides terminal cost. A vertiport inside or adjacent to a commercial airport will normally inherit that airport’s security programme, and its passengers will be screened; a standalone city site may require no screening at all beyond booking verification. The difference between those two regimes is the difference between a terminal with equipment, staff and queue space and a terminal that is a warm room with a desk. The revenue-per-departure build in this report assumes the screened case is standard by 2033 and largely absent in 2026, which is what moves passenger processing from USD 5.00 to USD 66.00.
Two further threads matter for an operator. Charging interoperability is becoming a safety and approval question as much as a commercial one, because a bespoke high-voltage interface at a certified site invites a variation. And ground damage — a wingtip or a rotor strike during a twelve-minute turnaround performed by a two-person crew — is the failure mode that turns a low-margin servicing operation into an uninsurable one.
Key message: the pad is regulated as an aircraft facility, the terminal is not regulated as a terminal at all, and the crew that makes the twelve minutes work needed a licence invented for it.