Global Rental Car & Airport Consolidated Facility (CONRAC) Operations Market Report, 2026–2033: The Facility Moved the Cost Off the Airport's Books and Into a Bond the Operator Services
A consolidated rental car facility is an airport's decision to stop solving the rental car problem on its own roads. Instead of eleven brands running eleven shuttle routes to eleven fenced lots, one building holds the counters, one road serves it, one bus or train connects it, and one charge on the rental transaction pays for it. Los Angeles put 18,000 cars into 4,658,106 square feet of demised premises under a developer contract not to exceed USD 2,028,302,301 over 28 years (LAWA CFC Triannual Report, May 2025). Grand Rapids opened Michigan's first such facility in July 2026 for USD 156m (Gerald R. Ford International Airport). There are 55 of these buildings in service at the end of 2025, holding roughly USD 26.0bn of capital between them.
The building is not the market. Operating it is. This report sizes the recurring spend that keeps a CONRAC running — facility management, quick-turnaround servicing, common-use transport, facility technology, and lifecycle and major maintenance — at USD 1.46bn in 2025, rising to USD 2.78bn in 2033, an 8.38% compound annual growth rate. Two things follow immediately, and both are uncomfortable for anyone who arrived looking for an infrastructure story.
First, the operating layer is small against the asset it serves: 5.62% of capital in service, or roughly one dollar of annual operating contract for every eighteen dollars of concrete, steel and bond. The returns in this asset class accrue to whoever holds the paper, not to whoever holds the mop. Second, the growth is not mainly volume. Of the USD 1.32bn added between 2025 and 2033, USD 604m comes from more rental transaction days and USD 718m from a higher cost to operate each one — a market that grows because the unit gets more expensive, not only because there are more units.
| Metric | 2025 | 2033 | CAGR |
|---|---|---|---|
| Market value (USD bn) | 1.46 | 2.78 | 8.38% |
| Rental transaction days (m) | 240.0 | 339.2 | 4.42% |
| Operating cost per transaction day (USD) | 6.08 | 8.20 | 3.80% |
| Facilities in service (no.) | 55 | 70 | 3.06% |
| Capital in service (USD bn) | 26.0 | 40.2 | 5.60% |
| Operations value as % of asset value | 5.62% | 6.92% | — |
North America carries 86.85% of the value on 77.92% of the transaction days. The gap between those two numbers is the thesis of this report: the same rental transaction costs USD 6.78 to operate in North America and USD 3.29 in Europe, not because North American operators are less efficient but because in North America the car is processed in a separate, remote, multi-level building and in Europe it is processed in a garage attached to the terminal. The market is where the building is, not where the cars are.
The charge that funds all of it is political. Customer facility charges run from USD 4.50 per transaction day at Kahului to the USD 12.00 now permitted in California after Assembly Bill 1150 raised the alternative-CFC cap on 1 October 2025 — a 2.67-fold spread for an identical function. A charge that can be legislated upward on a Tuesday can be capped, ring-fenced or redistributed on another. The operators who survive here are not the ones with the best technology. They are the ones whose contracts were written for a revenue stream they do not control.
What this report does not claim. It does not reconstruct contract-level margins, because they are not disclosed. It does not model the rental companies' self-performed labour except where that labour is contracted out and a value exists; the boundary is drawn explicitly in Chapter Two and the excluded pool is sized. And it does not assert that the CONRAC model will travel: the evidence says it has not, and the report says so rather than forecasting an export market the procurement record does not support.
Table of Contents
- Executive Summary: A USD 1.46bn Operating Layer Under a USD 26bn Asset
- Table 1 — The market at a glance, 2025 and 2033
- The Chain: Who Is Paid to Do What Inside the Building
- Table 2 — Five cost pools: value, share and who performs the work, 2025
- Table 3 — Named facilities, disclosed capital cost and operating scope
- Competition: Five Primes and a Buyer Who Publishes Benchmarks
- Table 4 — The operating primes and their disclosed scopes
- Financing: The Bond Bought the Building and the Charge Pays for Both
- Table 5 — Disclosed programme costs and funding sources
- Table 6 — Pipeline of new and expanded facilities with disclosed values, 2026–2033
- Technology and Innovation: The Depots Electrified Before the Cars Did
- Table 7 — Technology cost pools and adoption, 2025–2033
- Market Risk: The Counterparty Is Losing Money and the Charge Is a Vote
- Table 8 — Sensitivity of the 2033 value to five variables
- Regulatory Landscape: A Charge Set by Statute, Audited Like a Tax
- Table 9 — CFC rate card and statutory caps at selected airports
Competitive Landscape
The competition happens once a decade, and then it is over
There is no continuous market in CONRAC operations. There is a procurement, held every seven to ten years per facility, after which the winner holds an exclusive mandate for the life of the contract and everyone else waits for the next airport to reach financial close. Charlotte’s current solicitation for consolidated rental car facility management services runs a three-year base with option renewals, and its pricing worksheet asks bidders to price the whole scope rather than a menu. That structure — long term, whole scope, single award — is the market. It is why competitive intensity is high at the bid and effectively zero in between, and why this report classifies the structure as moderately consolidated rather than competitive.
Conrac Solutions is the clearest specialist in the field: a developer and operator that describes itself as operating at 17 airports across 13 states, acquired by Meridiam in June 2023, with Joshua Blum appointed chief executive from July 2025 and the Reno-Tahoe facility under contract for a 2028 opening (Meridiam, Conrac Solutions). Its services run from facility operation to fuel operation to quick-turnaround management — the pool division described above, bid as one bundle. At Portland it acted as project manager on the common-use fast-charging installation in the quick-turnaround area, with Engie as general contractor and ChargePoint supplying equipment: a specialist operator assembling a supply chain rather than owning it.
Around the specialist sits a ring of large diversified firms that win the same work as a line item inside a bigger relationship. At Los Angeles the developer is a partnership of Fengate, PCL Investments and MVI Finance, with Johnson Controls as lead operations and maintenance provider and MVI Field Services managing the quick-turnaround area — a consortium in which the operations role is subcontracted to a building-services company, not held by the developer. At Atlanta the facility-management award went to a Cofely Services joint venture, now part of Engie. At Denver the airport has sought USD 150m for programme management over ten years, with Jacobs in the frame — the largest disclosed operating-adjacent mandate in the pipeline. ABM Industries and Siemens sit in the same ring: one selling labour, the other selling the electrical and controls layer a depot now needs.
| Party | Role disclosed | Where disclosed | Scope position |
|---|---|---|---|
| Conrac Solutions (Meridiam) | Developer and operator; facility, fuel and QTA operation | 17 airports, 13 states; Reno-Tahoe 2028 | Specialist, full bundle |
| Johnson Controls | Lead operations and maintenance provider | LAX ConRAC | Hard and soft FM only |
| MVI Field Services | Quick-turnaround area manager | LAX ConRAC | Turn servicing only |
| Engie (Cofely Services JV) | Facility management; general contracting | Atlanta rental car centre; Portland QTA charging | FM and delivery |
| Jacobs | Programme management, ten-year request | Denver, USD 150m | Delivery oversight, not operations |
| ABM Industries | Facility services labour | Comparable garage and transport assets | Soft FM |
| ChargePoint Holdings | Charging equipment and network | Portland QTA, USD 3.3m system | Technology, per station |
| Siemens | Electrical, controls and charging infrastructure | Depot electrification programmes | Technology and infrastructure |
The buyer is also the benchmark, the auditor and the competitor
Three things make this market unusually hard on the seller, and all three come from the same source: the buyer is a public agency with a statutory duty to disclose. Los Angeles publishes a triannual customer facility charge report that sets out its developer payments, its bond proceeds and its operating expense in one document. Sacramento publishes its forecast of sources and costs with an independent accountant’s report attached. Atlanta publishes gross receipts, transaction days and rent paid. A bidder cannot argue that its cost base is structurally higher when the last facility’s numbers are on the airport’s website and the airport’s own consultants have modelled the next one.
The second difficulty is that the tenant is a competitor. The rental companies that pay the facility charge are the same companies that could, and often do, perform the quick-turnaround work themselves. Tenants occupy roughly 100,000 square feet each of a Los Angeles building whose demised area is 4,658,106 square feet, and they staff it. Any operator proposing to expand its scope is proposing to take work from the organisation that sits on the committee reviewing its performance.
The third difficulty is that the operator’s revenue is capped by a charge the operator does not set. If the customer facility charge at a facility is USD 9.00 per transaction day, the entire pool available to service debt, run the building and renew it is USD 9.00 per transaction day. The operator’s fee is a residual inside that envelope, ranked behind debt service. The fee is therefore negotiated against a number fixed by council vote or statute, and the operator’s bargaining position is the strength of its cost model, not its pricing power.
What follows is a market with high barriers to entry and low returns to incumbency. Assembling a bid requires bonding capacity, a building-services supply chain, a quick-turnaround model and a municipal procurement record; winning requires a price that survives a public comparison. The specialist operators have responded by owning more of the value chain — Conrac Solutions bidding facility, fuel and QTA together, Meridiam providing the equity that lets it take development risk as well as operating risk. The diversified firms have responded by treating the work as a services line and competing on labour cost. Neither response creates pricing power, and neither is a moat. The moat in this market is a contract signature, and it expires.
One further observation, because it is easy to miss: the operator’s counterparty is not the airport alone. It is the airport plus the tenant committee plus the bond trustee. A concessionaire that fails to pay its facility charge is the operator’s problem as much as the airport’s, and the rental industry’s financial condition — covered in Chapter Six — flows directly into the operator’s working capital and into the reliability of the revenue stream the bond was sold against.
Value Chain
Five pools, one charge, and nobody paying for the same thing twice
The money inside a consolidated rental car facility is spent in five places, and the boundaries between them are where procurement goes wrong. The first is the building itself: structure, envelope, lighting, lifts, fire, water, cleaning, security and the energy that keeps 4.7 million square feet of parking deck lit and ventilated. The second is the turn — the fuel, wash, vacuum, movement and light maintenance that returns a car to the ready line. The third is renewal: the escalators, resurfacing, roof, membranes, signage and systems that a 25-year asset consumes whether or not anyone budgets for them. The fourth is transport: the bus fleet or the automated people mover that carries the customer between the terminal and the shed. The fifth is the small, growing layer of technology that decides who may enter the ready line, what the charge is, and how the charge is collected and audited.
Our estimate puts USD 512m of the USD 1.46bn 2025 total in the first pool, USD 452m in the second, USD 330m in the third, USD 126m in the fourth and USD 40m in the fifth. Facility management is the largest single pool at 35.07%, and that fact alone explains most of the market’s behaviour. The cost driver is the building, and the building’s size, level count and envelope are fixed at design, not at operation.
| Cost pool | 2025 (USD m) | Share | Typical performer | Contract length |
|---|---|---|---|---|
| Facility management, hard and soft FM | 512 | 35.07% | Prime contractor or FM specialist | 5–10 years |
| Quick-turnaround servicing: fuel, wash, vacuum, ready line, light maintenance | 452 | 30.96% | Rental companies in-house; subcontracted to QTA operators | Annual to 5 years |
| Major maintenance and lifecycle renewals | 330 | 22.60% | Developer under DBFOM, or airport direct | 25–30 years |
| Common-use transport operations | 126 | 8.63% | Airport, APM O&M contractor, or bus operator | 5–10 years |
| Facility technology and revenue control | 40 | 2.74% | Systems vendor, priced per transaction | 3–7 years |
| Total | 1,460 | 100% |
The unit of account is the transaction day, not the transaction
A rental transaction at Seattle-Tacoma International averaged 4.70 transaction days in calendar 2025, and the airport counted 1,321,868 transactions against 6,213,304 transaction days (Port of Seattle, Rental Car Revenue Report 2025). Atlanta’s disclosure for fiscal 2024 gives 7,670,587 transaction days and a gross receipt of USD 67.84 per transaction day, against Seattle’s USD 66.28. Two airports, two accounting systems, one unit that survives the comparison. That is why this report is denominated in transaction days. A one-day rental and a nine-day rental consume almost the same counter time and almost the same return processing, but they occupy a car, a bay and a share of the building for very different lengths of time, and the facility charge is levied on the day.
The unit also makes operating cost visible. At USD 1,460m across 240.0m transaction days, the world spends USD 6.08 to operate a transaction day. That number is the report’s price spine and the most useful benchmark a buyer can hold, because it is comparable across facilities, operators and contract forms, and because every 2033 figure here is that unit multiplied by a volume.
What the disclosed contracts do and do not tell you
Published values for CONRAC operating contracts are not comparable, and the honest treatment is to say so rather than average them. Los Angeles discloses total facility operating and maintenance expense of USD 20,305,000 for fiscal 2026 across 4,658,106 square feet of demised premises — USD 4.36 per square foot per year — but that figure sits inside a design-build-finance-operate-maintain structure with a 28-year term and carries the full scope of the building envelope. Atlanta’s rental car centre has been run under a facility-management award reported at USD 21m across five years, a very different number for a very different scope, because utilities, soft FM and lifecycle sit elsewhere in the airport’s own budget. Comparing the two as productivity differences would be an error. Comparing them as scope differences is the point: the buyer who does not define the boundary buys the same square footage twice.
| Facility | Opened | Disclosed capital or contract value | Disclosed operating scope |
|---|---|---|---|
| Los Angeles (LAX) | 2024 | USD 2,028.3m DBFOM not-to-exceed; USD 2,879.6m total programme cost through FY2060 | Full O&M at USD 20.305m in FY2026; 4,658,106 sq ft demised; 18,000 cars |
| Newark Liberty (EWR) | 2023 | USD 500m | Eleven rental brands in one building |
| Denver (DEN) | Planned | USD 1.2–1.7bn programme; USD 150m programme-management request | Eleven brands; removes 250,000 shuttle trips a year |
| Kahului (OGG) | 2019 | USD 340m, funded solely by a USD 4.50 per day charge | Consolidated counter and return |
| Sacramento (SMF) | Programme | USD 485m programme cost including debt service | Charge rising to USD 12.00 per day in 2026 |
| Grand Rapids (GRR) | 2026 | USD 156m | Michigan’s first consolidated facility, on 15 acres |
| Hartford (BDL) | 2022 | USD 210m | 1.5m sq ft; 36 fuelling positions; 9 car washes; 9 brands |
| San Francisco (SFO) | 1998 | USD 131m | 1.2m sq ft; 8 firms at opening |
| Atlanta (ATL) | 2009 | USD 21m facility-management award over five years | 7,670,587 transaction days in FY2024 |
The pool this report excludes, and why the exclusion is stated
Quick-turnaround work is the second-largest pool and the least contracted. Most rental companies wash, fuel and move their own cars at their own facility, using their own service agents, and that labour appears nowhere in an airport’s accounts. We include it in the market because it is real operating expenditure on the facility, we size it from the turn count implied by transaction volume at roughly USD 9.80 a turn, and we do not pretend to know the split between self-performed and contracted work beyond the disclosure that a dedicated operator such as Conrac Solutions runs fuel and quick-turnaround services across a portfolio of airports. Where a reader wants only the procurable market — the slice an operator can actually bid for — we put that at 48% of the total, or USD 700.8m in 2025. The rest is performed by the tenant.
That division is the structural fact of this market. Half of the operating spend inside a consolidated facility belongs to the company that rents the car, not to the company that runs the building, which means the operating contract is smaller, more defensible and more narrowly scoped than the physical asset suggests — and it means an operator who wins the facility mandate has won the right to compete for the other half, one tenant at a time, for as long as the lease runs.

Investment Activity
The building was never on the airport’s balance sheet, and that is the point
A consolidated rental car facility is usually financed by a bond that the rental customer pays off. The mechanism is the customer facility charge: a fixed amount per transaction day, added to the rental bill, pledged to debt service, and backed by nothing except the airport’s right to keep levying it. At Los Angeles, the Series 2022A CFC revenue bonds produced net proceeds of USD 434.6m, capitalised interest of USD 28.3m and a debt service reserve of USD 55.5m, and the airport’s own schedule of uses and sources puts the whole programme at USD 2,879.6m through fiscal 2060 against forecast revenues of USD 6,092.5m (LAWA CFC Triannual Report, May 2025). Within that total sit USD 526.6m of milestone payments, USD 1,235.4m of availability payments and USD 921.8m of debt service.
Read those three numbers again in order of size. The construction milestones are the smallest of the three. The availability payments — the money the operator receives for making the building available, year after year, whether or not it is used — are the largest single line after debt service, and they are paid from the same charge. The airport has converted a capital problem into an annual payment stream, and the operating contract is the instrument that converts it.
| Programme | Disclosed value | Funding route | Structure |
|---|---|---|---|
| Los Angeles (LAX) | USD 2,879.6m through FY2060 | Series 2022A CFC revenue bonds, net proceeds USD 434.6m; CFC at USD 9.00 per transaction day | Design-build-finance-operate-maintain, 28-year term; contract not to exceed USD 2,028.3m |
| Sacramento (SMF) | USD 485m programme | CFC rising to USD 12.00 per day in 2026; airport bond debt | Financing shifted from a public-private partnership to traditional airport bonds |
| Kahului (OGG) | USD 340m | CFC at USD 4.50 per day, sole funding source | Airport-funded; completed on time and on budget in 2019 |
| Denver (DEN) | USD 1.2–1.7bn | CFC | Programme management, ten-year request of USD 150m |
| Grand Rapids (GRR) | USD 156m | Not disclosed in the opening announcement | Airport-funded; opened July 2026 |
| Newark Liberty (EWR) | USD 500m | Not disclosed | Delivered inside the Terminal A programme; opened 2023 |
The finance costs more than the building, and the schedule says so
Sacramento’s forecast of sources and costs, published with an independent accountant’s report, is the clearest disclosure of what a programme actually costs across its life. It shows forecast revenue of USD 803.1m, and against that revenue three cost lines: USD 71.97m of design and construction, USD 648.5m of debt service, and USD 82.7m of capital reserve funding. Across the forecast period the airport pays roughly nine dollars of debt service for every dollar of construction it built (Sacramento International Airport, Forecasted Sources and Costs, 2026).
That ratio is not a scandal; it is arithmetic. A 30-year amortisation of a large principal at municipal rates multiplies the sticker price, and the schedule covers the period in which the debt is outstanding rather than the construction period in which it was drawn. But it is the fact that reorganises how a reader should think about this market. The building is cheap relative to the obligation it creates. The obligation is what the charge exists for. And the operating contract is the only line in the structure that can be reduced without renegotiating a bond covenant — which is precisely why it is procured competitively and priced against a public benchmark.
The financing model has also shifted in the last three years, and the shift runs against the private-equity narrative. Sacramento moved from a public-private partnership structure to traditional airport bond debt, choosing the airport’s own balance sheet and the bond market over developer equity. That is the opposite of the direction a reader might expect from the volume of infrastructure capital looking for airport assets, and it tells you something about who bears residual risk: the airport, because the charge is its own revenue power, and the bondholder, because the charge is pledged. The developer holds construction and availability risk for a term, then hands back a building with a renewal obligation attached.
| Facility | Timing | Disclosed value | Note |
|---|---|---|---|
| Denver (DEN) | Construction phase | USD 1.2–1.7bn | Eleven brands; removes 250,000 shuttle trips a year |
| Reno-Tahoe (RNO) | 2028 target | Not disclosed | Operator contracted |
| Grand Rapids (GRR) | Opened July 2026 | USD 156m | Michigan’s first consolidated facility |
| Boise (BOI) | 2026 | Not disclosed | New consolidated facility |
| Northwest Arkansas (XNA) | 2026 | Not disclosed | New consolidated facility |
| Syracuse (SYR) | Development | Not disclosed | New consolidated facility |
| Punta Gorda (PGD), South Bend (SBN), Greenville-Spartanburg (GSP) | 2025 | Not disclosed | Smaller-market conversions from on-airport lots |
| Pheonix pipeline estimate, 2026–2033 | USD 14.2bn (range 9.0–19.0bn) | Fifteen new facilities and eight major expansions |
What the pipeline does to the operating market
Fifteen new facilities and eight major expansions over eight years is USD 14.2bn of capital, taking the installed base from USD 26.0bn to roughly USD 40.2bn by 2033. The operating market does not grow in proportion, because a new building adds operating value only from the day it opens and because the newest buildings are the most efficient per transaction day. But the direction is unambiguous, and the composition matters more than the total: every new facility adds a full facility-management contract, a quick-turnaround mandate and a lifecycle obligation at once, which is why the pipeline is worth more to an operator than its capital value suggests.
The investment conclusion is uncomfortable for anyone seeking the operating layer as an asset class. The capital in this market is attracted by the charge, not by the service contract; the equity Meridiam deployed to buy Conrac Solutions in 2023 bought a platform, not a yield; and the operating margin is capped by a fee negotiated against a publicly disclosed benchmark. What the pipeline does create is a fifteen-year runway of procurement events, roughly two a year, in which a specialist can win a mandate without competing for it continuously. That is a modest prize, and it is the real one.
Technology & Innovation
The depot was electrified before the fleet was
In December 2024, Portland International Airport completed a common-use direct-current fast-charging system in the quick-turnaround area of its rental car facility: twenty charging stations, a spare capacity allowance of roughly 1,600 amps, equipment from ChargePoint, Engie as general contractor, and Conrac Solutions as project manager. The system cost USD 3.3m and was funded by the rental car consortium and reimbursed through the customer facility charge (Airport Improvement, July 2025).
That project is the shape of the next decade in this market, and its financing structure is more interesting than its technology. The rental companies were not asked to fund a shared asset out of their own capital; the charge funded it, and the charge is paid by the renter. So the depot gets electrified whether or not the fleet’s residual values support the cars that will use it. That decoupling is why charging infrastructure is the fastest-growing line in this report even while the rental industry is writing down electric vehicles. Avis Budget took a charge of roughly USD 500m in the fourth quarter of 2025 against the value of its electric fleet (Travel Weekly, March 2026). The charger still got built, because it was not on Avis’s balance sheet.
Why the quick-turnaround area is the hardest place in the building to charge a car
A rental car does not park. It arrives, is cleaned, is fuelled or charged, and is moved to a ready line where it waits for a customer who has not yet booked. That means the dwell time available for charging is unpredictable, the number of vehicles on site at any moment is large — eighteen thousand at Los Angeles — and the electrical load arrives in blocks when a return wave lands rather than spread across the day. A depot that adds chargers naively buys capacity for a peak that occurs four hours out of twenty-four and pays a demand charge for the privilege.
The engineering response is the one Portland adopted: common-use equipment with spare amperage so that a single operator does not have to size for its own worst hour, plus managed charging that sequences vehicles against departure schedules. The commercial response is harder. A common-use charging asset shared by eleven brands requires an allocation rule — who pays for the session, who pays for the capacity, and who pays when a car sits on a charger because its keys are at the counter. None of those questions is technical, and all of them are settled inside the facility operating contract.
| Technology pool | 2025 | 2033 | What drives it |
|---|---|---|---|
| Charging infrastructure operations and managed charging | 6 | 48 | Quick-turnaround electrification, shared-capacity allocation |
| Access control and vehicle identity: plate recognition, credential, ready-line entry | 14 | 42 | Charge audit, tenant access, revenue protection |
| Revenue control, payment and charge collection | 12 | 34 | Priced per transaction; grows with volume |
| Building systems: monitoring, lighting, energy management | 8 | 31 | Energy cost, deferred maintenance visibility |
| Total technology pool | 40 | 155 |
The counter did not change; the depot did
It is worth separating what technology has changed inside a consolidated facility from what it has not. The customer-facing experience is essentially unchanged: walk in, queue, present a licence, sign, collect a key, walk to a bay. Self-service kiosks and mobile check-in have reduced queue time without changing the process, and the automated people mover has replaced the bus without changing the journey. The building still has one counter hall and one ready line.
Everything that has changed is on the back side. Plate recognition at ready-line entry replaced a clipboard and now produces an auditable record of when a car left the line and which tenant moved it — which matters because the quick-turnaround area is where vehicles are damaged, and because the charge is apportioned against transactions that someone must be able to count. Revenue control has moved to the same per-transaction pricing logic that governs the rest of the parking and mobility market, and the facility’s building systems increasingly report energy consumption by tenant, because energy is a line the tenant can be billed for.
The economically important point is the relative size of these pools. Technology is the fastest-growing component of the market and the smallest: USD 40m in 2025 rising to USD 155m in 2033 adds only USD 115m to a growth of USD 1,320m, or 8.7% of the increase. A vendor reading a high growth rate as a large prize will be disappointed by the absolute number. A facility operator reading it correctly will see something more useful — that the technology layer is the part of the contract where scope is expanding while the fee is not yet set, and that the operator who defines the common-use charging allocation rule in year one sets the terms under which every tenant buys energy for the next twenty-five years.

Market Risk
The tenant is losing money, and the tenant pays the charge
Avis Budget Group reported revenue of USD 11,652m for 2025 and a net loss of USD 995m, across 175.1m rental days and 38.0m transactions worldwide; its Americas segment ran 129.45m rental days at USD 8,900m of revenue, a revenue per day of USD 68.80 and an operating cost of USD 42.79 per rental day (Avis Budget Group, Form 10-K for 2025). Hertz Global Holdings reported revenue of USD 8,505m and a net loss of USD 747m. Between them the two largest listed operators hold roughly 39% of the United States market; Enterprise holds around 55%. Neither listed operator covered its cost of capital in 2025, and both responded by shrinking fleet rather than by raising price.
This matters to a facility operator in three distinct channels, and they are worth separating because they fail at different times. The first is the concession fee, which is a percentage of gross receipts — ten percent at Seattle and at Atlanta, where USD 52.0m of rent was paid on USD 520.4m of gross in fiscal 2024. A price war reduces that line immediately, because it is levied on the dollar. The second is the customer facility charge, which is levied on the transaction day. It is insulated from price competition and exposed to volume: a company that cuts its fleet to defend margin cuts transaction days, and transaction days are the airport’s revenue. Add the charge to the rent and the airport captures 17.36% of the tenant’s gross receipts before the tenant pays a wage — with the important qualification that the charge is passed through to the customer and the rent is not.
The third channel is the one operators feel first and disclose least: the tenant’s willingness to fund its own share of the building. Quick-turnaround labour, service agents, counter staff and depot equipment are the tenant’s cost, and at USD 28.59 of facility operating cost per transaction against USD 201.11 of the rental company’s own operating cost, the facility layer is 14.22% of what a transaction costs to run. That is a visible, bounded, attackable line. Every negotiation an operator has with a tenant committee starts there.
What actually breaks the forecast
Five variables move the 2033 number, and only two of them are within the market’s control. The first is transaction-day volume, which we hold at 4.42% a year. If the rental industry’s fleet contraction persists and volume grows at 2.0%, the 2033 value falls to USD 2.31bn; if airport traffic and penetration both run hot at 6.0%, it reaches USD 3.14bn. The second is unit operating cost, held at 3.80% a year. At 2.0% the market reaches USD 2.42bn; at 5.0%, USD 3.05bn. Note the asymmetry: a volume miss costs more than a price miss of the same size, because volume carries the whole unit cost with it.
| Variable | Base assumption | Downside and 2033 value | Upside and 2033 value |
|---|---|---|---|
| Transaction-day growth | 4.42% a year, USD 2.78bn | 2.0% a year, USD 2.31bn | 6.0% a year, USD 3.14bn |
| Unit operating cost growth | 3.80% a year, USD 2.78bn | 2.0% a year, USD 2.42bn | 5.0% a year, USD 3.05bn |
| Lifecycle funding rate | 1.38% of asset value, USD 2.78bn | 1.00% of asset value, USD 2.63bn | No credible upside without a covenant change |
| Pipeline conversion | 15 new facilities, USD 14.2bn | 8 conversions: smaller asset base and fewer mandates | 20 conversions: asset base above USD 45bn |
| Outsourced share of quick-turnaround | 48% of the market procurable | 35%: procurable value under USD 0.6bn | 60%: procurable value above USD 1.0bn |
The third variable is lifecycle funding. Our base case assumes renewal spend runs at 1.38% of asset value a year, which is the number implied by the 2033 lifecycle line of USD 555m against a USD 40.2bn asset base. If renewals are funded at 1.00% instead — the more typical public-asset behaviour when a building is 15 years old and nothing has visibly failed yet — the 2033 market falls to USD 2.63bn. There is no symmetrical upside, because deferred maintenance is not a strategy: it is a liability with a date on it. California’s decision to make major maintenance of a rental facility an eligible use of the charge is, in our reading, evidence that at least some facilities have reached mid-life without a funding route, and that airports have noticed.
The risks the numbers do not capture
Construction cost. Denver’s programme is described as a USD 1.2bn to USD 1.7bn range — a 42% spread on a single project before ground is broken. Los Angeles discloses both a contract not to exceed USD 2,028.3m and a total programme cost of USD 2,879.6m through fiscal 2060; those are not a cost overrun and a budget, they are a contract value and a cost of ownership, and confusing them is the most common error made about this asset class. Whoever holds the fixed-price obligation during construction holds the risk; whoever holds the availability payment after handover holds a different one.
Concentration. Five organisations win most of the mandates in this market, and each award lasts seven to ten years. A specialist that loses two bids in a row loses the platform that made the third bid credible. The Meridiam acquisition of Conrac Solutions in 2023 is what a specialist does about that: it buys the balance sheet that lets it survive a bid cycle in which it wins nothing.
Transport obsolescence. Denver’s new facility is expected to eliminate 250,000 shuttle trips a year — a 684 trips a day reduction in a single city, achieved by moving cars instead of people. Every facility that replaces buses with a people mover or with walkable access removes a bus operation from the market and adds an automated system service contract. The direction of travel in the transport pool is fewer vehicles, more automation, and higher capital per unit.
Substitution risk, finally, is low but not zero. A rental company that moves to a smaller, closer, walkable facility, or an airport that decides to leave rental cars on the curb in return for a higher concession percentage, would not be defeated by anything an operator did. It would simply not have a building to run. That is why the operating market’s fortunes are so tightly bound to a planning decision taken decades earlier by someone else, and why the honest risk statement in this report is not about competition, technology or labour. It is that the market exists because of a building, and buildings are decisions.
Regulatory Landscape
Two charges, two statutes, one revenue stream
The customer facility charge exists because airports needed a revenue source that could be pledged to a bond without touching airline rates and charges. In California it exists in two forms: a standard charge under Section 50474.21 and an alternative charge under Section 50474.22, both of which cap what an airport may levy per day. Assembly Bill 1150, chaptered on 1 October 2025, changed both. It raised the alternative charge’s daily maximum from USD 9.00 to USD 12.00 with effect from 1 January 2026, allowed the aggregate of charges to fund major maintenance of the rental car facility, permitted bonds backed by the charge to cover that maintenance, and removed an earlier authorisation relating to terminal modifications (California Legislative Information, AB 1150).
Read as a credit event, that is a meaningful improvement. A charge that can fund a mid-life roof is a charge that protects a 30-year bond from a capital call the airport cannot otherwise meet. Read as a market event, it is more interesting: the state has effectively told airports that the renewal obligation described in Chapter Two is now financeable through the same instrument as the building, which converts a deferred liability into an operating line. Sacramento’s response was to propose USD 12.00 per day for 2026, up from USD 9.00 in 2025 and USD 8.00 in 2023.
| Airport or jurisdiction | Charge per transaction day | Basis | Note |
|---|---|---|---|
| Kahului, Hawaii (OGG) | USD 4.50 | Airport | Sole funding source for a USD 340m facility |
| Atlanta, Georgia (ATL) | USD 5.00 | Airport | Levied on 7,670,587 transaction days in FY2024, or USD 38.35m |
| Portland, Oregon (PDX) | USD 6.00 | Port | Reimburses quick-turnaround charging for rentals up to ten days |
| Los Angeles, California (LAX) | USD 9.00 | Board | Pledged to the Series 2022A CFC revenue bonds |
| California alternative charge, statutory maximum | USD 12.00 from 1 January 2026 | Statute | Raised from USD 9.00 by AB 1150; major maintenance now eligible |
| Sacramento, California (SMF) | USD 12.00 proposed for 2026 | Board, within state cap | Up from USD 9.00 in 2025 and USD 8.00 in 2023 |
The spread from USD 4.50 to USD 12.00 is a 2.67-fold range for an identical function, and it is not explained by cost. It is explained by what each facility has to repay. Kahului built a USD 340m facility on a charge of USD 4.50 with no debt structure beyond the airport’s own; Sacramento is funding a USD 485m programme whose forecast schedule carries USD 648.5m of debt service. The charge is not a price for a service. It is an amortisation schedule with a political authorisation attached.
Two revenue streams from one transaction, and an audit that sees both
An airport with a consolidated facility takes money from the rental transaction twice. The concession fee is rent — a percentage of gross receipts, frequently with a guaranteed minimum, ten percent at Seattle and at Atlanta — and it is revenue to the airport’s general fund. The facility charge is a dedicated levy, collected on the same bill, pledged to a specific bond, and auditable against the transaction count. At Atlanta in fiscal 2024 those two streams produced USD 52.0m and USD 38.35m respectively on USD 520.4m of gross receipts, or 17.36% combined before any operating cost.
Because the charge is dedicated, it is audited like a tax rather than disclosed like a fee. Los Angeles files a triannual customer facility charge report setting out developer payments, bond proceeds, reserves and operating expense, with the reconciliation between what was collected and what was spent. Sacramento publishes a forecast of sources and costs with an independent accountant’s report attached, covering the forecast period rather than the year. Those documents are the reason this report can be built bottom-up at all, and they are also the reason the market is hard to enter: a bidder is pricing against a cost base that the buyer has already modelled and published.
The surrounding regulation is ordinary airport law with unusual consequences. Airports that accept federal grant money must use airport revenue for airport purposes and offer access on reasonable and non-discriminatory terms, which constrains how a facility can favour or exclude a tenant and how the charge can be structured across brands. Procurement is competitive by statute and by practice — Charlotte’s facility-management solicitation prices the whole scope in a single worksheet — and the award is a public record. The combined effect is a market with high compliance cost, low information asymmetry and a buyer who cannot quietly renegotiate.
Why the model never left North America, in one paragraph
The regulatory explanation for this market’s geography is simpler than the commercial one. A European or Asian airport that consolidates its rental counters and its return garage does so inside or beside the terminal, because land is scarce, rail access already exists, and there is no political benefit to releasing a remote site for development. It funds the result out of aeronautical and commercial revenue, sets the rental concession as rent, and never creates a dedicated per-day charge. Without a dedicated charge there is no pledge, without a pledge there is no bond, and without a bond there is no separate building with a separate operating contract. The CONRAC is a financing instrument before it is a building, and the instrument exists in North America because the statutory architecture for it does. Where that architecture is absent, the operating market this report describes does not exist — which is why 86.85% of its value sits in one region and why the forecast does not assume an export.
The regulatory risk that follows is specific rather than general. It is not that the charge will be abolished. It is that the eligible-use definition, the daily cap and the ring-fence will be adjusted by legislatures responding to a rental bill their constituents can see. AB 1150 moved all three in the operator’s favour; a future bill can move them back, and the operating contract will be repriced against whatever the new envelope allows.
Frequently Asked Questions
How large is the CONRAC operations market?
USD 1.46bn in 2025, rising to USD 2.78bn in 2033 — an 8.38% compound annual growth rate. That is the annual value of the services that operate consolidated rental car facilities: facility management, quick-turnaround servicing, common-use transport, facility technology and lifecycle renewals. It is not the value of the buildings (USD 26.0bn of capital in service) and it is not rental revenue.
Why is the operations market so small relative to the facilities themselves?
Because a CONRAC is a low-labour, low-energy building with a high fixed cost of construction. Annual operating spend equals 5.62% of the capital in service. The money in a CONRAC is in the bond, which is repaid from a customer facility charge (CFC) on each rental transaction day; the operating contract is a comparatively small line sitting on top of a very large capital structure, and it ranks behind the bondholders.
What is a customer facility charge and who sets it?
A per-transaction-day charge, typically USD 4.50 to USD 12.00, added to a rental bill at a facility airport and dedicated to building and running the consolidated facility. It is set politically, not commercially: by council vote, airport board, or state statute. California's Assembly Bill 1150, chaptered on 1 October 2025, raised the state's alternative-CFC daily maximum from USD 9 to USD 12 and made major maintenance of the rental facility an eligible use.
Does the CONRAC model exist outside North America?
Only in a weaker form. European and Asian airports consolidated the rental counter and the return garage but kept them inside or beside the terminal, so there is no separate building to operate and no facility-scale operating contract. North America carries 86.85% of global operating value on 77.92% of global transaction days — the market is where the building is, not where the cars are.