Global Commercial Office & Mixed-Use Garage Operations Market Report, Size, Share and Forecast 2026–2033: The Building's Vacancy Sets the Revenue and the Lease Sets the Bill
The garage under a commercial office building is not a parking business that happens to sit under an office building. It is the office building's most awkward asset: capital-intensive, code-mandated, labour-heavy, and priced by a lease clause rather than by a market. That distinction decides almost everything about how this sector behaves — why its revenue sits structurally short of the return its capital needs, why the two largest operators on earth account for 7.29 per cent of it, and why 75.37 per cent of its eight-year growth has to come from a price increase rather than from more cars.
This report sizes the market for operating garages attached to, or built to serve, commercial office and mixed-use buildings. It covers the transient and contract revenue those garages collect, plus the management, technology and service fees their owners pay to run them. It excludes curbside parking, standalone surface lots, airport and event parking, and hospital or university campus parking, each of which is sized in its own Pheonix report.
Table 1 — Market at a glance, 2025 and 2033
| Metric | 2025 | 2033 | CAGR |
|---|---|---|---|
| Market value, USD bn | 37.78 | 63.34 | 6.67% |
| Spaces addressed, million | 26.0 | 26.6 | 0.29% |
| Revenue realised per space per year, USD | 1,370.88 | 2,184.48 | 6.00% |
| Blended achieved monthly rate, USD | 168 | 246 | 4.88% |
| Paid utilisation | 68.0% | 74.0% | — |
| Contract and monthly revenue, USD bn | 18.53 | 26.15 | 4.40% |
| Transient hourly and daily revenue, USD bn | 17.11 | 31.96 | 8.12% |
| Operations and technology services, USD bn | 2.14 | 5.23 | 11.83% |
Source: Pheonix Research model. Space base derived bottom-up from competitive office inventory and parking provision, then extended to comparable mature markets. All arithmetic computed deterministically.
Three facts define the cycle. First, the buildings these garages serve are less occupied than they were designed to be: US office vacancy ended 2025 at 20.5 per cent on Cushman & Wakefield's national series, having sat at 20.6 per cent in Moody's second-quarter reading — the sixth consecutive quarterly record on that series. Second, the garages were built far beyond what is used. Where codes require four to six spaces per 1,000 square feet of office, the utilisation observed in the studies we hold sits at 1.834, meaning the structure is provisioned for between 2.18 and 3.27 times the cars that actually park in it. Third, the cost of that overbuild is recoverable from the tenant while the revenue from it is not shared with them, and that turns on a single clause.
We are explicit about where this model is soft. There is no authoritative census of office-attached structured parking spaces in any market — not in the United States, not in Europe, not anywhere. The 26.0 million space base is a Pheonix construction from competitive office inventory (5,436,490,728 square feet on Cushman & Wakefield's Q4 2025 US series), a built provision ratio, and a structured share. It is the single largest source of uncertainty in this report, and Section 5 shows what happens when it, the tariff or utilisation each fail in turn.
Sources and provenance
- Cushman & Wakefield, US Office MarketBeat, Q4 2025 — national vacancy, inventory, asking rent, sublease, construction pipeline.
- Moody's Analytics, US office vacancy series, second quarter 2025, reported July 2025.
- Kastle Systems, Office Occupancy Barometer, week of 8 December 2025 — 2,600 buildings, 41,000 businesses, ten markets.
- WGI, Parking Structure Cost Outlook for 2025 — construction cost per space, city index, EV provision, code-driven cost.
- ABM Industries Incorporated, Form 10-K for the fiscal year ended 31 October 2025 — Parking and Transportation revenue and segment operating profit.
- Metropolis Technologies, announcement of the closing of the SP+ acquisition, 16 May 2024; SP Plus Corporation 2023 revenue basis.
- US Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2023, SOC 53-6021 Parking Attendants.
- California Green Building Standards Code (CALGreen) 2025, Table 5.106.5.3.1 — EV capable and EVCS requirements.
- City and County of Denver, modernising parking requirements, effective 11 August 2025.
- Issaquah Land Use Code 18.604.180 — parking structures and structured provision.
- International Building Code 2021 and 2024; NFPA 88A, Standard for Parking Structures; NFPA 101.
- Pierce Engineers, Parking Structure Facility Specific Maintenance — service life and chloride-driven deterioration.
- AIA Philadelphia, convertible parking structure study — cost per space and conversion economics.
- THA Consulting, revenue per space threshold for debt service and operations.
- San Francisco Municipal Transportation Agency, Parking Garage Management, 18 March 2025.
- CapVeri, parking area maintenance lease language; Dain Torpy, treatment of parking fees and operating expenses.
- Urban Land Institute, Shared Parking, second edition — accumulation profiles by land use.
- Mobility Places, US monthly parking rate survey across 128 cities.
- City of San Rafael, transportation impact study for a garage-and-office redevelopment, 2025.
Method statement. The secondary record supplies the demand, cost, code and operator evidence base — roughly seventy per cent of the analytical weight here. The remaining thirty per cent is our own primary work in this cycle: reading disclosed pricing schedules, management agreements, tender documents and asset-level leasing material across the office and mixed-use garage segment, and forming judgements from those documents and from the pattern of what operators and asset managers do rather than what they say. Where we did not have a document, we have said so instead of describing a conversation we did not have.
Provenance. Model, indexing and every derived figure: Pheonix Research. All arithmetic computed deterministically and rounded only at presentation. Market sizing excludes the segments listed above. Last verified 23 November 2026.
Table of Contents
- Two operators you can count, and the rest of the market nobody can
- Who sets the price: the building, not the gate
- The garage repays 22.9 years of itself
- The camera does not need the gate
- What a 33 per cent shortfall does to terminal value
- The requirement that is becoming illegal to build
- Sources and provenance
Tables
- Market at a glance, 2025 and 2033
- The revenue layers, 2025 and 2033
- Revenue per space against the debt-service threshold
- The chain, and who holds each decision
- The demand cascade, indexed to design capacity
- Monthly contract rates in selected markets
- Disclosed operators and their scale
- Four regulatory regimes compared
- Scenario arithmetic, 2033
Competitive Landscape
Two operators you can count, and the rest of the market nobody can
This is a thirty-six billion dollar revenue pool in which the two largest participants, measured together, hold 7.29 per cent. That is not a rounding problem in the data. It is the structure of the business, and it is the most important thing to understand about who competes here and how.
Table 7 — Disclosed operators and their scale
| Operator | Disclosed scale | Basis | Relevance to this segment |
|---|---|---|---|
| ABM Industries | USD 818.8m parking and transportation revenue, FY2025 | Form 10-K, year to 31 October 2025 | Office garage work sits inside its USD 430.3m business & industry line, not disclosed separately |
| SP+ / Metropolis | USD 1.78bn revenue before take-private | SP+ 2023 reporting; Metropolis closed acquisition 16 May 2024 | Largest pure-play parking operator, now private and vertically integrated with its own technology |
| Metropolis platform | 4,600+ locations, 28m members | Company disclosure | The acquiring platform, selling access control and payment into the acquired estate |
| LAZ Parking, Impark and regional operators | Not disclosed | Private | Material share of managed locations; no audited revenue in the public domain |
| Amano, Scheidt & Bachmann | Equipment revenue only | Corporate reporting | Sell hardware into operators; take no parking revenue risk |
Source: ABM Industries Form 10-K FY2025; Metropolis Technologies and SP Plus Corporation disclosures. Private operators are listed without figures because no audited figure exists.
Take the listed operator first, because its filing is the cleanest evidence available. ABM’s parking and transportation segment earned USD 818.8 million in the year to 31 October 2025, against USD 804.9 million the year before, and produced USD 61.2 million of segment operating profit — a 7.47 per cent margin. Within that number, aviation is USD 335.0 million, business and industry is USD 430.3 million, manufacturing and distribution is USD 53.1 million and education is USD 0.4 million. The office and mixed-use garage revenue this report is about is buried inside the business and industry line, which also carries janitorial and engineering work. The largest listed operator in the world cannot tell you, from its own accounts, how big its office parking business is.
Now the larger one, and the only transaction of genuine scale in the segment. Metropolis acquired SP Plus at USD 54.00 a share, a 52 per cent premium to the pre-announcement close, in a deal valued at roughly USD 1.5 billion and financed with USD 1.8 billion raised across a USD 1.05 billion preferred round, a USD 550 million term loan and a USD 175 million revolver. SP+ came with about 4,000 locations, roughly 20,000 employees, 50 million consumers and more than USD 4 billion of payments processed a year. The combined platform now reports more than 4,600 locations and 28 million members.
Note what was bought. Metropolis did not buy garages. It bought contracts, a labour force and a payment flow, and then put its own recognition technology into them — the platform is the acquirer and the operator is the acquired. Both halves of that platform claim are separately priced in our work: Mobile Parking Payment and Transaction Platforms finds the fee has no cost base and the session, not the space, is what is being sold; Automated License Plate Recognition and Vehicle Identity for Access finds the camera is the business and the law is the margin — an exposure that travels with the contracts into an office garage rather than staying with the landlord. That is the shape of consolidation in this segment: capital buys the operating layer and the transaction data, and leaves the concrete with the landlords who already own it.
Everything else is fragmented, and the reason is the unit of competition. Nobody competes for a market; everybody competes for a building. The instrument that would make a building-level contest possible is also the one that usually is not fitted: our Parking Occupancy Sensing and Space-Guidance report finds that the sensor which gets bought is the one that does not get installed, because guidance pays back in driver experience while the owner is paid on the bay either way. A management agreement on a single 600-space garage under a 400,000 square foot office tower runs for one to three years, is frequently bundled into a wider facilities contract that includes cleaning and engineering, and is renewed on relationships and price. The operator’s real competitor is usually the incumbent facilities contractor, not another parking company. Scale at corporate level buys procurement and technology, and very little share at street level. That is the capital-markets version of the same fact, and our Parking Concession Monetisation and Revenue-Stream Financing report prices it: a long-dated bay revenue stream is valued off the discount rate rather than the tariff, so what a buyer acquires is duration — and duration does not consolidate a market made of one-to-three-year agreements.
The property managers sit above this and take none of the risk. CBRE, JLL and Cushman & Wakefield let garage contracts on behalf of owners and are paid for administration, which means the firms with the deepest client relationships in commercial office have no direct exposure to whether the garage makes money. The equipment makers sit below — Amano and Scheidt & Bachmann among the hardware suppliers into this segment — and they are paid on capex, so their incentive is the specification, not the utilisation. The supplier-side version of that incentive is in our Parking Access and Revenue Control Systems report: the gate stopped being sold by the lane and started being sold by the transaction, which moves the vendor’s revenue onto the operator’s throughput rather than onto anything that improves utilisation.
The competitive wedge being sold into this market right now is not price. It is the claim that the transaction layer can be made to pay. Metropolis markets its deployments on no upfront capital cost and a thirty-day installation, and states that asset managers see a 15 per cent increase in net operating income. That is the company’s own commercial claim about its own product, made by its own business development team; it is not an audited result and we do not treat it as evidence of market-wide returns. What we do treat as evidence is the direction of travel: a platform that installs at zero capex and takes a share of the uplift is a platform that has decided the owner will not fund the upgrade, and it is betting that recovery on the transaction is worth more than the hardware. The same bet is being made one layer down in EV Charging at Parking Assets, where charging turns a ninety-minute bay into a four-hour bay and nobody has repriced it: the upgrade arrives, the asset’s use changes, and the tariff stays where it was.
The absence of a reliable share table is a refusal, not an omission. LAZ Parking and Impark operate materially across this segment and neither publishes audited revenue; the regional operators below them number in the hundreds and publish nothing. Any table ranking them would be assembled from press releases and self-description, and we will not publish a share figure built that way. What can be said with confidence is what the two disclosed participants earn, and that together it is 7.29 per cent of the pool.
That leaves the competitive landscape with an unusual shape: extremely high intensity at the level of the individual contract, very low concentration at the level of the market, thin margins at the largest disclosed operator, and a technology layer trying to insert itself between the owner and the transaction. The next chapter explains why the owners tolerate a 7 per cent margin business underneath their buildings at all — and the answer is that they are not buying parking revenue. They are buying the right to let the space above it. That is the Hospital and Healthcare Campus Parking Operations result in a different institution: a structure whose tariff is set by the institution that owns it rather than by the market, and which therefore never has to repay itself out of the demand it was built to hold.
Value Chain
Who sets the price: the building, not the gate
Follow a single dollar of parking revenue through an office building and it becomes obvious why this market behaves differently from every other form of parking. The parker pays at a barrier. The money reaches the owner’s rent roll. Between those two points sit six positions, and only one of them can actually raise a price.
The owner holds the asset and decides the tariff ceiling, because the owner carries the capital and the debt service on it. The property manager — CBRE Group, Jones Lang LaSalle, Cushman & Wakefield and their peers — runs the building day to day, negotiates the leases and lets the garage contract, and takes no parking risk whatsoever; the fee is for administration. The operator does the work: staffing, collection, enforcement, maintenance, technology. Below that sit the platform and hardware layers — access control, licence-plate recognition, payment, the equipment made by Amano or Scheidt & Bachmann — which sell into the operator rather than to the market. Then the tenant, who buys parking rights either inside a lease or at the posted rate. Then the parker, who has no choice at all.
Table 4 — The chain, and who holds each decision
| Position | Holds | Decides | Bears |
|---|---|---|---|
| Owner / landlord | Freehold, debt | Tariff ceiling, capex, contract form | Construction cost, structural repair, vacancy |
| Property manager | Management mandate | Contract letting, lease terms | Nothing on parking |
| Operator | Management agreement or lease | Staffing, collection, enforcement, technology | Labour, compliance, the fee at risk |
| Platform / hardware | Equipment, software | Pricing of the transaction layer | Product liability |
| Tenant | Lease, designated bays | Whether to take bays, and how many | Recoverable operating expense |
| Parker | Nothing | Whether to drive | The tariff |
Source: Pheonix Research, from disclosed management agreement and lease structures.
What makes the office garage unusual is that its profit and loss account is not really its own. Under the contractual architecture that dominates this segment, parking revenue is a landlord revenue line while parking cost is a recoverable operating expense. The two do not net against each other in the tenant’s bill. Where a landlord charges separately for parking, the costs attributable to owning and operating the garage offset against the revenue from the parking charge and are not treated as an operating expense; the garage’s own floor area is excluded from the denominator used to calculate a tenant’s proportionate share; and the landlord typically reserves the right to raise the parking charge. The tenant therefore funds the asset through recoveries while the owner keeps the income from it.
The clause is not standard, and its three common forms produce three different businesses. In the landlord-favourable form, all parking costs — including structural repair and the amortisation of capital — sit inside operating expenses, uncapped. In a balanced form, structural work is treated as capital and amortised over its life, and parking revenue offsets the cost before allocation. In the tenant-favourable form, parking rights sit inside base rent, parking maintenance is excluded from operating expenses, and parking revenue is credited back against them. The same garage, the same cars and the same tariff produce three different answers to the question of who is paying for the concrete.
That is why the gate sets almost nothing. The operator cannot raise the price — the owner does — and the owner cannot raise it far, because the tenant is the counterparty and the tenant can move. What the owner can do is decide how the cost is recovered. In this market the recoverable-expense mechanism, not the parking transaction, is what makes the asset financeable at all.
The second consequence is that the price is local in a way that has nothing to do with cost. The median constructed cost of a space varies by 1.50 times between the cheapest and dearest US cities in WGI’s 2025 index, but the achieved monthly rate varies by far more than that.
Table 6 — Monthly contract rates in selected markets
| Market | Average monthly rate, USD | Market | Average monthly rate, USD |
|---|---|---|---|
| New York | 566 | Washington DC | 285 |
| Brookline | 464 | Seattle | 247 |
| Manhattan | 453 | Los Angeles | 206 |
| San Francisco | 412 | Austin | 185 |
| Hoboken | 386 | National average, 128 cities | 129 |
| Boston | 370 | — | — |
| Philadelphia | 300 | Canton, Ohio | 35 |
Source: Mobility Places, survey of 128 US cities. New York to Canton is a 16.2 times spread.
New York’s USD 566 and Canton’s USD 35 are sixteen times apart, and no part of that gap is a cost difference. It is income, land value and the number of people who would rather pay than hunt for a space. For historical scale: Colliers’ last full parking rate survey, for 2012, put the US average monthly unreserved median at USD 166.26 across 56 central business districts, with Midtown Manhattan at USD 562. The dispersion has not narrowed in fourteen years; it has widened.
The third consequence is the one operators find hardest to argue with. A mixed-use podium has a genuine structural advantage: office demand peaks at midday on weekdays, residential demand overnight, hotel demand between six and eight in the morning and again from ten at night, retail demand between one and two in the afternoon on weekdays and two and four at weekends, on the accumulation profiles in the Urban Land Institute’s Shared Parking methodology. One structure can serve three peaks that never coincide — which is precisely how shared-parking analysis justifies building fewer spaces.
Tenant designation destroys that. A law firm that has bought 120 bays has bought 120 bays, whether or not its people are in the building on a Friday, and the residential tenants upstairs cannot use them. The pooled structure is the efficient structure and the lease is what prevents it. We have not published a figure for the capacity that designation strands, because no operator discloses the designation profile of its own portfolio and we would be inventing one.
Which brings the value chain to its real output. A garage in this segment does not primarily produce parking revenue. It produces lettability — the condition on which the office space above it can be leased to tenants who require parking, and the condition on which the building satisfies its own planning consent. That is why an asset returning two-thirds of the revenue its capital needs continues to be built, and why the price is set by the building rather than by the gate.
Investment Activity
The garage repays 22.9 years of itself
WGI’s 2025 cost outlook puts the median US constructed cost of a parking space at USD 31,400 — USD 93.85 a square foot, up from USD 29,900 in 2024, a five per cent annual increase on a structure whose own cost index rose 8.4 per cent in the year and 13.7 per cent since 2022. The spread between cities is 1.50 times: USD 26,847 in Dallas against USD 40,380 in San Francisco, with New York at USD 39,658 and Kansas City at USD 30,960 on an index of 100. Add soft costs and the number rises by a further 15 to 25 per cent.
Against that, the average addressed space in this market realises USD 1,370.88 a year. Divide one by the other and the structure costs 22.9 years of its own gross revenue. Across the entire eight-year forecast it recovers 34.93 per cent of its build cost. Those are gross revenue figures, before labour, energy, insurance, maintenance or debt service.
Table 3 — Revenue per space against the debt-service threshold
| Measure | USD per space per month | Basis |
|---|---|---|
| Revenue realised, 2025 | 114.24 | Pheonix model: USD 1,370.88 a year |
| Threshold needed to cover debt service and operations, low | 171.45 | THA Consulting USD 135, indexed to 2025 prices |
| Threshold needed to cover debt service and operations, high | 190.50 | THA Consulting USD 150, indexed to 2025 prices |
| Realised as a share of the low threshold | 66.63% | Shortfall of 33.37% |
| Constructed cost per space | 31,400 | WGI 2025 median, before soft costs |
| Years of gross revenue equal to build cost | 22.9 | Derived |
Source: Pheonix Research model; WGI; THA Consulting. The threshold is a benchmark rather than an observed figure and is indexed, not measured, for 2025.
Set the two together and the finding is unavoidable. A space needs somewhere between USD 171 and USD 190 a month to carry its own debt service and operating cost. It earns USD 114. The gap is 33.37 per cent, and it cannot be closed by operating better, because operating cost is already inside the threshold. It can only be closed by tariff, by paying off the debt, or by someone else paying for the asset.
Someone else does. That is the whole reason this market exists in the form it does. A garage under an office building is not underwritten as a parking investment; it is underwritten as a condition of the building above it. A building that cannot offer parking cannot be let to a large share of the tenants who might otherwise take it, and in most jurisdictions the building cannot be consented at all without the spaces. The capex is therefore attributable to the office revenue, not to the parking revenue, and the parking line is free to run at a level that would be indefensible as a standalone business. Once that is understood, the 33 per cent shortfall stops looking like a failure and starts looking like the design.
The recoverable-expense mechanism is what completes it. Under a landlord-favourable clause the structural repair and the amortisation of that capital sit inside recoverable operating expenses, while the garage’s own area is excluded from the tenant’s proportionate-share denominator. The tenant funds the asset. The owner keeps the parking revenue. The shortfall is not absorbed; it is allocated.
This is also why the only transaction of scale in the segment bought the platform rather than the property. Metropolis acquired SP Plus in May 2024 at USD 54.00 a share, a 52 per cent premium, financed with USD 1.8 billion of preferred equity, term debt and a revolver. Private capital did not buy concrete. It bought contracts, labour and payment flows, because those earn a return that does not depend on the space ever servicing its own construction cost.
Where the arithmetic does break, the asset is removed rather than refinanced. US office inventory fell by 20.7 million square feet over six quarters as demolitions and conversions outran new construction; deliveries in 2025 were 17.9 million square feet, and the pipeline is below 20 million square feet for the first time this century, at roughly 15 per cent of its first-quarter 2020 peak of 136 million. Some of what is coming down is the garage itself.
The conversion arithmetic is not attractive but it is occasionally better than the alternative. AIA Philadelphia’s study of a convertible garage in the 2025 metro Philadelphia market puts the cost of designing for conversion at about USD 35,000 a space — slightly above the median cost of simply building the garage — with demolition at USD 41.79 a square foot and replacement residential construction at USD 596.94 a square foot. A garage-and-office site in San Rafael, California, has been brought forward as 238 homes against 396 retained parking spaces where 132,360 square feet of office had stood. Those are not the economics of a landlord choosing to convert. They are the economics of a landlord choosing the least bad of the options available on a structure that never repaid itself.
The investment conclusion therefore runs against the revenue conclusion. Revenue grows at 6.67 per cent and almost all of it is tariff. Capital does not follow the revenue, because the revenue cannot carry it. What capital does follow is the operating layer — management contracts, labour, technology and the payment flow — and the evidence for that is that the only large cheque written in this segment went to a platform buying operators, at a 52 per cent control premium, and not to a single parking structure anywhere.
Technology & Innovation
The camera does not need the gate
Parking technology has been described for a decade as an exercise in removing the barrier. The more accurate description is that it removes the transaction, and the barrier is only the most visible part of the transaction. A ticket machine, a cashier, a payment terminal and an exit queue are all the same function performed four times. Recognition-based access performs it once, at entry, and settles later.
That matters here because of where the money sits. The operations and technology services layer is the smallest of the three revenue layers and the fastest growing: USD 2.14 billion in 2025 reaching USD 5.23 billion in 2033, an 11.83 per cent compound rate against 4.40 per cent for the contract book. It grows because it is charged as a percentage of a transaction the technology has made cheaper to process, and because the platform selling it has learned to charge against the uplift rather than the hardware.
Table 2 — The revenue layers, 2025 and 2033
| Layer | 2025, USD bn | 2033, USD bn | CAGR | Share of the pool added |
|---|---|---|---|---|
| Contract and monthly parking | 18.53 | 26.15 | 4.40% | 29.79% |
| Transient hourly and daily parking | 17.11 | 31.96 | 8.12% | 58.11% |
| Operations and technology services | 2.14 | 5.23 | 11.83% | 12.10% |
| Total | 37.78 | 63.34 | 6.67% | 100% |
Source: Pheonix Research model. The services layer is computed as a share of the parking pool, rising from six to nine per cent across the forecast.
The labour case is the one that can be measured. The US Bureau of Labor Statistics counted 118,130 parking attendants in May 2023, at a median annual wage of USD 32,840 and a mean of USD 32,700. That is a national wage bill of USD 3.88 billion. Against the US share of this market — 32.38 per cent of the pool, or USD 12.24 billion — attendant wages alone are 31.71 per cent of the revenue available. That is the addressable cost, and it explains why the transaction layer is being installed at zero upfront capital and paid for out of the saving.
But the saving is narrower than the pitch. Recognition replaces the cashier. It does not replace the person who sweeps the decks, jumps a flat battery at eight in the morning, clears a spill, walks a lone customer to a car at midnight, or stands at the barrier when a camera misreads a plate and forty cars are behind it. Those tasks are inside the same labour line and outside the reach of the technology. What the platform actually removes is the revenue-handling step — the part of the job where money is taken, mistakes are made and cash leaks.
That leakage is the honest basis for the uplift claims being made. Metropolis markets its deployments on no upfront capex, a thirty-day installation and a stated 15 per cent increase in net operating income for asset managers, with more than 4,600 locations and 28 million members on the platform. This is a vendor’s own claim about its own product and we do not treat it as an audited return. What we do note is that a 15 per cent uplift on the US pool would be USD 1.84 billion — roughly half the entire US attendant wage bill — and that the mechanism which could produce it is the elimination of unbilled and misbilled time, not a higher tariff.
The second technology front is electrical, and it is being imposed rather than sold. California’s 2025 green building standards code requires, for office and retail projects with 201 or more parking spaces, that twenty per cent of the total be EV-capable, with charging equipment installed at three-quarters of those capable spaces. WGI’s cost outlook notes that EV provisions historically accounted for one to two per cent of spaces, that some jurisdictions now require 25 per cent or more for commercial work and up to 100 per cent in multifamily, and that the resulting construction cost increase runs from three to six per cent. On a 500-space garage at the 2025 median that is about USD 942,000, or roughly USD 1,884 a space, on an asset already returning 66.63 per cent of its debt-service threshold.
Who captures the charging revenue turns on the same clause as everything else. The capital is the owner’s; the electricity sale, the session fee and the dwell-time premium accrue to whoever holds the asset and the contract. Under a management agreement that is usually the owner; under a lease or concession it may be the operator. The technology is not the variable. The contract is.
Two things are notably absent from the disclosed record, and we are stating them as refusals rather than filling them. First, no operator in this segment discloses its technology revenue split between software licence, transaction fee, valet and maintenance, so the composition of the USD 2.14 billion services layer is a Pheonix construction from contract structures, not an observed breakdown. Second, no operator discloses a per-location revenue uplift that has been independently verified. The claims exist; the audits do not. Until they do, the correct reading is that the transaction layer is growing quickly, that its economics are better than the concrete it sits on, and that the size of the prize is bounded by a wage bill of USD 3.88 billion rather than by the price of parking.
Market Risk
What a 33 per cent shortfall does to terminal value
The demand for a garage in this segment comes through a chain of reductions, and each reduction is somebody else’s decision. The structure was built for a design occupancy. The building is leased to some fraction of its area. The tenants bring some fraction of their people in. Only then does anyone drive into the garage — and the garage is paid on whatever survives all three.
US office vacancy ended 2025 at 20.5 per cent, so 79.5 per cent of the area was leased. Attendance is a separate and worse number: Kastle Systems’ barometer, measured across 2,600 buildings and 41,000 businesses in ten markets, recorded a 56.3 per cent weekly average in the week of 8 December 2025 — its highest reading since early 2020 and still only just above half — with a single-day all-office record of 66 per cent. Peak-day occupancy in the best buildings reached about 79 per cent, and Tuesdays in A-grade stock exceeded 95 per cent.
Table 5 — The demand cascade, indexed to design capacity
| Stage | Index, design capacity = 100 | Denominator |
|---|---|---|
| Spaces built | 100.0 | Design provision at construction |
| Area leased | 79.5 | Share of office area under lease, Q4 2025 |
| Peak-day attendance | 66.0 | Against pre-pandemic occupancy level |
| Weekly average attendance | 56.3 | Against pre-pandemic occupancy level |
Sources: Cushman & Wakefield Q4 2025; Kastle Systems, week of 8 December 2025. The last two rows are measured against a pre-pandemic baseline, not against leased area, so they are not a subset of row two and should not be multiplied into it.
That caveat matters more than it looks. Attendance is measured against a pre-pandemic occupancy level, not against leased floor area, so the indices cannot simply be multiplied together. But the direction is unambiguous and one comparison is decisive: a garage is provisioned for the parked fleet that existed when it was designed, and that fleet is now arriving at 66 per cent of its old size on the best day of the year and 56.3 per cent on an average one.
Which brings the model to a disclosure it owes the reader. The utilisation assumption used throughout this report is 68 per cent in 2025, rising to 74 per cent by 2033. Sixty-eight per cent is above the 66 per cent peak-day attendance figure. That is not an error, but it is an assumption with a consequence: it means the model implicitly requires every garage in this market to sell capacity to someone who is not the office tenant — a retailer’s customers, a hotel’s guests, a hospital’s visitors, the residents above. The moment a garage relies only on the building it sits under, it cannot reach the utilisation this report assumes. The mixed-use half of the title is not decoration; it is the assumption holding the revenue up.
Table 9 — Scenario arithmetic, 2033
| Scenario | 2033 value, USD bn | CAGR from 2025 | What fails |
|---|---|---|---|
| Base case | 63.34 | 6.67% | — |
| Tariff held flat at 2025 levels | 42.28 | 1.42% | No price recovery; utilisation still reaches 74% |
| Space base held flat at 26.0 million | 61.91 | 6.37% | No net new construction; tariff and utilisation unchanged |
| Utilisation held at 68% | 58.20 | 5.55% | No demand recovery; tariff and space unchanged |
Source: Pheonix Research model. Each scenario holds one driver flat and leaves the others at base. These are not probabilities.
The sensitivities are lopsided, and that is the risk finding. If the space base never grows again — if Denver’s abolition of minimum parking requirements becomes the national norm and nothing is built — the market still reaches USD 61.91 billion and only 0.30 points of growth are lost. If utilisation never recovers, it reaches USD 58.20 billion and loses 1.12 points. If the tariff cannot rise, the market reaches USD 42.28 billion, growth collapses to 1.42 per cent, and USD 21.06 billion of the 2033 market disappears. Of the USD 22,464 million added to the parking pool across the forecast, 16,930 million — 75.37 per cent — is tariff and 20.97 per cent is utilisation. Only 3.66 per cent is space.
A market whose growth is three-quarters price is a market that is making a bet on pricing power. So the question becomes: how much pricing power does an office garage actually have? The rate dispersion says the answer is entirely local — USD 566 a month in New York, USD 35 in Canton, Ohio, a 16.2 times gap with no cost basis behind any of it. There is no national price to raise. Each owner negotiates against a local tenant pool that is smaller than it was, and the tenant can substitute by not driving.
The public evidence on tariff power is not encouraging. The San Francisco Municipal Transportation Agency reported in March 2025 that its garage revenues remained 20.5 per cent below pre-pandemic levels, with the decline concentrated in its downtown garages. Its response was to raise hourly rates across the board on 1 February 2025 — the first broad increase since the pandemic — and selected monthly rates on 1 March, together worth about USD 2.5 million in annual net revenue. That is a rate increase delivering a fraction of what demand took away, and it is what pricing power looks like when a public body is doing the pricing.
The risk that is not in the table is physical. A parking structure is a chloride environment with embedded steel, and Pierce Engineers’ maintenance work is blunt about the consequence: deterioration is exponential rather than linear, which means the cost of deferring work rises faster than the cost of doing it. Service life is thirty to forty years for a freestanding structure and longer where it sits under a building. An asset built on a thirty-to-forty-year horizon, in a market whose underlying demand fell by about a fifth inside five years, is depreciating against a curve that has already moved underneath it. That is where the 33 per cent revenue shortfall eventually lands — not in a year’s cash flow but in the terminal value of a structure that cannot be re-let, cannot be re-priced and can only be demolished or converted.
Regulatory Landscape
The requirement that is becoming illegal to build
A parking structure in this segment exists because four separate bodies of law and code put it there. Zoning or planning requires the spaces. Building and fire codes dictate how the structure must be built. Energy and environmental code increasingly dictates what must be installed in it. And the lease, which is private law, decides who pays for all of it. Three of those four are now moving, and they are not moving in the same direction.
Start with the requirement itself, because it is the one that is being withdrawn. Denver eliminated its minimum parking requirements with effect from 11 August 2025, joining a group of North American cities that have removed the mandate and left provision to the market. The significance for this report is not the spaces that will now be built in Denver. It is that the mechanism keeping the space base growing has been switched off in the most direct way available to a regulator.
The numbers explain why the mandate mattered so much and why its removal is so consequential. Codes in force across most North American jurisdictions require four to six spaces per 1,000 square feet of office. Observed utilisation in the studies we hold runs at 1.834 per 1,000. The structure is therefore built for 2.18 to 3.27 times the cars that actually use it, and it is only built at all because the requirement compels it. Remove the compulsion and no rational developer replicates that ratio. Our base case assumes the addressed space base grows at 0.29 per cent to 2033 — barely more than nothing — and that assumption already contains the effect of withdrawal.
Table 8 — Four regulatory regimes compared
| Regime | Instrument | What it does to the space base | Cost consequence |
|---|---|---|---|
| Denver, Colorado | Zoning amendment, effective 11 August 2025 | Removes the minimum; provision becomes a commercial choice | Removes the obligation to build spaces that cannot be let |
| Issaquah, Washington | Land use code 18.604.180 | Retains minimums and requires 50% structured provision for office, 90% in the vertical mixed-use overlay | Converts a surface obligation into a structural one, multiplying cost per space |
| California | CALGreen 2025, Table 5.106.5.3.1 | Does not cap provision; mandates what must be installed within it | At 201+ spaces in office and retail: 20% EV-capable, charging at 75% of those; adds about USD 942,000 to a 500-space garage |
| Fire and life safety | IBC 2021/2024; NFPA 88A; NFPA 101 | No effect on quantity | Sprinklers required above 48,000 sq ft footprint or 55 ft height, and in all parking structures under NFPA 88A |
Sources: City and County of Denver; Issaquah Land Use Code; CALGreen 2025; International Building Code; NFPA 88A and NFPA 101; cost effect from WGI’s 2025 cost outlook.
Read the Issaquah row against the Denver row and the whole regulatory story is visible. Issaquah retains the minimum and then requires that half of the office provision be structured — ninety per cent inside the vertical mixed-use overlay. Denver removes the minimum entirely. One jurisdiction mandates the most expensive possible way of satisfying a requirement; another has abolished the requirement. Both are North American, both are current, and a developer’s cost per space differs between them by roughly the ratio of a surface bay to a structural one, before the building and fire code is applied to either.
The building and fire codes are the part of the regime nobody proposes to change, and they are the reason the structure costs what it costs. The International Building Code, in its 2021 and 2024 editions, requires sprinklers where a parking structure exceeds 48,000 square feet in footprint or 55 feet in height; NFPA 88A requires them in all parking structures, and NFPA 101 addresses them as a separate occupancy. WGI’s 2025 outlook puts a USD 31,400 median cost on a space that satisfies all of this, in an environment where parking structure costs rose 8.4 per cent in a year and 13.7 per cent since 2022. The code that makes the structure safe is also the code that makes it three times the cost of the surface lot it replaced, which is why the zoning mandate and the construction cost cannot be analysed apart.
The energy code is now the fastest-moving instrument, and it is additive. California’s 2025 green building standards code requires projects above 201 parking spaces to make twenty per cent of them EV-capable, with charging equipment installed at three-quarters of the capable spaces in office and retail — a materially higher installation rate than for other occupancies. WGI records that EV provision historically accounted for one to two per cent of spaces, that some jurisdictions now mandate 25 per cent or more for commercial work, that multifamily requirements can reach 100 per cent, and that the resulting construction cost increase runs three to six per cent. On a 500-space garage at the 2025 median that is about USD 942,000, or USD 1,884 a space.
Every one of these costs lands on the owner and is then allocated by the lease. That is the fourth body of law and the one that decides the outcome. Under a landlord-favourable operating-expense clause the EV equipment, the structural repair and the amortisation of the capital behind them are recoverable from tenants, with the garage’s area excluded from the proportionate-share denominator. Under a tenant-favourable clause the parking rights sit inside base rent, garage costs are excluded from operating expenses, and the revenue is credited back. The regulator does not choose between those outcomes. The lease does, and it was signed before the regulator acted.
Two refusals. We do not publish a jurisdiction-by-jurisdiction series of parking-minimum status, because no consolidated and current register exists and any table we built would be a snapshot of press releases rather than of adopted code. And we do not put a figure on the average cost of a parking variance or a design review, because those costs are negotiated case by case and are not disclosed anywhere we can verify. What can be said is that the direction of regulation now runs against the space base in zoning, against the cost per space in building and energy code, and in favour of the tenant in the only instrument that decides who pays.