Editorial Article
The 36-to-1 Clock: A Fleet Depot's Electricity Bill Is Decided in Fifteen Minutes and Paid Over Nine Hours
At 18:40 on a Tuesday in February, twenty-five vans come back to a depot and twenty-five drivers plug in. Nothing about that is unusual. It is the design of the operation: the vehicles must be charged by 06:00, the chargers are rated at 11 kW, and a van that arrives at 18:40 has eleven hours to absorb 60 kWh. The charging is not urgent. The bill is.
For the next eight hours the site will draw 275 kW, because the plugs are live and the vehicles are thirsty and nobody has told any of them to wait. At 02:00 it will still be drawing near enough 275 kW, because most of the batteries will still be filling. The energy is being bought at the cheapest hours of the day. The capacity is being bought at the most expensive moment of the month, and the two facts are recorded by two different meters on two different clocks.
That is the whole economics of fleet depot charging, and it is why a market worth USD 9,400.0m in 2025 grows at 12.78% a year to USD 24,600.0m in 2033 while the equipment inside it gets cheaper every year. The depot does not have an energy problem. It has a measurement problem.
The two clocks
Commercial and industrial electricity tariffs in most jurisdictions have two volumetric components. Energy is charged per kilowatt-hour, measured continuously. Demand is charged per kilowatt of maximum demand, measured — in the tariffs that matter for depots — across the single highest fifteen-minute average in the billing month.
Fifteen minutes against nine hours. The ratio is 36 to 1, and it decides everything downstream. One avoidable quarter-hour, on one evening, in one month, sets a charge that applies to every hour of that month. The depot can buy its energy at 2 a.m. at off-peak rates and still pay a peak-rate capacity charge for a spike it created at dinner time.
This is not a quirk of one utility. The Ontario Energy Board modelled current rate designs against realistic fleet load profiles and published the bill impacts. For a 25-vehicle bus depot the demand component ran 25% to 48% of the bill. For a ten-vehicle food delivery fleet it ran 29% to 52%. Beverage delivery ran 19% to 39%. The typical commercial and industrial customer without electric vehicles sits at 12% to 28%. Across the commercial electric fleet cases the OEB examined, the demand share reached 52%.
Two other datasets bracket the finding. The National Association of State Energy Officials and partners, working on rate-design assistance, found demand charges averaging 73.7% of the modelled monthly bill across the fleet cases examined, at roughly USD 10 per kW. Wang, Miller and Fulton’s 2025 study of depot charging for battery-electric trucks, published in The Electricity Journal, uses a California statewide average of USD 0.20 per kWh and USD 17 per kW-month.
The dispersion is itself a finding. Across the jurisdictions where figures are published, the same physical depot pays somewhere between USD 10 and USD 31 per kW of peak. That spread is larger than the spread in the price of the chargers, larger than the spread in vehicle efficiency, and larger than the spread in labour costs. A depot is a different business depending on where it is plugged in.
The arithmetic that splits the market in two
Take the twenty-five-van depot described above and give it the management layer the market is selling. The energy requirement is 1,500 kWh — twenty-five vans at 60 kWh. Unmanaged, the peak is 275 kW. Managed across a twelve-hour dwell into a flat 125 kW, it is 125 kW.
At USD 17 per kW-month the unmanaged depot pays USD 4,675 a month in demand charges. The managed depot pays USD 2,125. That is a cut of 54.55%, USD 2,550 a month, USD 30,600 a year — on a site whose monthly energy is 33,000 kWh. Expressed per kilowatt-hour, the demand charge alone is 14.17 cents unmanaged and 6.44 cents managed. On a New Jersey rate of USD 31.07 per kW, a published peak-demand charge, the same van depot saves USD 55,926 a year.
Now run the same exercise on twenty-five transit buses. A 350 kWh battery on a 50 kW overnight dispenser needs seven hours. The dwell is nine. The energy requirement is 8,750 kWh, the unmanaged peak is 1,250 kW, and the flattest achievable profile across nine hours is 972 kW.
The demand charge falls from USD 21,250 a month to USD 16,527. That is 22.22%, not 54.55%. And the reason is not that the software is worse. It is that the bus depot has 1.29 times the dwell it needs and the van depot has 2.20 times. There is almost nothing to flatten. The energy the fleet must absorb already occupies the window.
| Depot | Energy per night | Unmanaged peak | Managed peak | Dwell headroom | Demand charge cut |
|---|---|---|---|---|---|
| 25 parcel vans, 60 kWh, 11 kW posts, 12 h window | 1,500 kWh | 275 kW | 125 kW | 2.20x | 54.55% |
| 25 school buses, 100 kWh, 19.2 kW posts, 14 h window | 2,500 kWh | 480 kW | 179 kW | 2.69x | 62.8% |
| 25 transit buses, 350 kWh, 50 kW dispensers, 9 h window | 8,750 kWh | 1,250 kW | 972 kW | 1.29x | 22.22% |
| 25 Class 8 tractors, 900 kWh, 150 kW dispensers, 10 h window | 22,500 kWh | 3,750 kW | 2,250 kW | 1.67x | 40.0% |
Pheonix derivation on stated battery and port capacities and a USD 17 per kW-month demand charge. The third row is the one that matters for anyone selling software into transit.
The conclusion nobody markets
Put the two depots side by side and a relationship appears that runs against everything the managed-charging industry says about itself. The bus depot moves 227,500 kWh a month and the van depot moves 33,000. The bus depot’s demand charge is therefore a smaller number per kilowatt-hour — 9.34 cents unmanaged, 7.26 cents managed — than the van depot’s, at 14.17 and 6.44. High throughput dilutes a fixed capacity charge.
So the depot with the lowest utilisation carries the highest demand-charge incidence, and the depot with the highest utilisation carries the lowest. Software is worth most where the vehicles work least. Parcel operations, postal rounds, service fleets, school districts and municipal pools are where a scheduling product earns its subscription. A transit garage is where storage, a substation and a long conversation with the utility earn theirs.
That has a commercial consequence the sector has been slow to accept. The addressable market for managed charging is not the fleet electrification market. It is the subset of the fleet electrification market whose duty cycle leaves slack in the overnight window — and that subset skews to light commercial vehicles, which happen to be the cheapest thing to electrify and therefore the fastest-growing part of the parc.
What the software is actually doing
The intervention is prosaic. A depot does not need to deliver less energy; it needs to avoid delivering it simultaneously. Start times are the lever and they are free. Where the dwell is more than twice the recharge requirement, a scheduler staggers arrival across the night, holds the site’s import at a fraction of the sum of the nameplate ratings, and never touches a vehicle.
The technology beneath that has commoditised in a way that has been commercially brutal for the hardware vendors. Open Charge Point Protocol 2.0.1 gives a management platform vendor-neutral control over start, stop and current limit, which means any competent charger can be told what to do by any competent platform. ISO 15118 adds plug-and-charge authentication and, in its second edition, bidirectional power transfer. The charger is becoming a socket with a modem, and the intelligence is migrating one layer up.
That migration is visible in the numbers. In the depot charging market, energy-management and charging software is 19.0% of 2025 value and 30.0% of 2033 value, compounding at 19.40% — the only layer to gain more than five points of share. Hardware, at 38.0% of 2025 value, grows at 9.03% and loses nine points of share even as its absolute revenue nearly doubles. Make-ready holds 27.0% and compounds at 11.13%, because a transformer is not optional and nobody has found a way to ship one as a subscription.
The vendors most exposed to that shift are the ones with the strongest brand recognition. Siemens, ABB and Schneider Electric can compete on hardware because they also sell the switchgear behind it; ChargePoint and Kempower have to defend a hardware margin in a market where the protocol layer is open. The energy majors are buying the position instead: Shell through Greenlots, Enel through an e-mobility arm it has since partly retrenched, bp through AMPLY Power. The logic is that whoever sells the fleet its electricity can also manage its peak.
And the manufacturers are being pulled in because the depot is now a constraint on the vehicle sale. Daimler Truck and Traton bundle charging-as-a-service with the truck. Tesla does it inside one balance sheet — vehicle, stationary storage, megawatt-class charging and the software that binds them — which is the only fully integrated position in the market and, notably, not one that any of its competitors can copy quickly.
When the software cannot help
A transit depot with a 1.29-times headroom has one option left and it is physical. A behind-the-meter battery can absorb the arrival peak and release the energy across the night, converting the 1,250 kW peak into a 972 kW one without asking any bus to wait. At USD 17 per kW-month, shaving 278 kW is worth USD 4,726 a month, and the only question is what the pack costs per kilowatt of shaved peak and how long it lasts.
That is a financeable asset in a way that a scheduling subscription is not, because the saving is a deterministic function of a published tariff rather than a behavioural change in a depot manager’s routine. It is also why the two halves of this market are converging on different buyers: software sold to the fleet operations director, storage sold to the finance director.
What would change the arithmetic
The entire software thesis rests on the demand charge surviving in its present form. Regulators in several jurisdictions are considering alternatives — higher fixed charges, capacity subscriptions, coincident-peak charges measured across a portfolio rather than a site. A move to coincident-peak recovery would gut site-level optimisation, because the peak would no longer be measured at the depot. That is the sector’s most under-discussed risk and the one that would do most damage to the fastest-growing layer in the market.
The second variable is dwell itself. Every increment of port power buys scheduling slack and raises the site peak. A depot that installs 150 kW dispensers instead of 50 kW gets 4.7 hours of slack per bus and pays three times the demand charge for it. At USD 17 per kW-month on 25 bays that is USD 17,000 a month for flexibility that may be used twice. Whether that trade is worth making is the actual engineering decision in this market, and almost nobody accounts for it explicitly.
The third is the tariff’s own structure. A narrow on-peak window rewards a scheduler who can shift load by two hours. A broad peak with a ratcheted demand charge rewards nobody. As electrification grows, utilities are already redesigning periods to reflect the new evening peak, and every redesign changes the value of a software subscription without a line of the software changing.
The depot is a parking asset with a factory’s bill
The framing that makes this market legible is that a depot was priced as a parking asset and is billed as a utility. Land, dwell and access were treated as free or near-free because that is what a yard is. The electricity arrives on a commercial and industrial tariff whose demand component is set by a peak the yard was never designed to manage, because a yard is where vehicles stand still and a factory is where a peak gets made.
That mismatch is a market. It is worth USD 9,400.0m in 2025 growing to USD 24,600.0m in 2033, and the reason it grows faster than the port count is that the mismatch is what gets sold back to the operator — as scheduling, as storage, as a delivered kilowatt-hour at a fixed price. The charger was never the product. The fifteen-minute measurement is.
Related Pheonix research: Global Fleet Depot & Overnight Yard Charging Infrastructure Market Report, 2026–2033; Global Rental Fleet Turnaround Software Market Report, 2026–2033; Global Road User Charging & Congestion Pricing Back Office Market Report, 2026–2033; Global Commercial Office & Mixed-Use Garage Operations Market Report, 2026–2033; Global Fuel Card & Fleet Payment Solutions Market, 2026–2033.
Sources. Ontario Energy Board, cost-of-service modelling of electric vehicle charging rate designs. Wang, Miller and Fulton, “The infrastructure cost for depot charging of battery electric trucks”, The Electricity Journal, 2025. National Association of State Energy Officials and partners, demand charge analysis for commercial electric fleets. National Renewable Energy Laboratory and Argonne National Laboratory, breakeven cost of delivered electricity to charge Class 8 electric tractors. Pheonix Research, Global Fleet Depot & Overnight Yard Charging Infrastructure Market Report, 2026–2033. No market-research publisher is cited.