Editorial Article
The Garage Costs 22.9 Years of Its Own Revenue
There is a number that should stop a property committee in its tracks, and it is not a market forecast. It is a division sum.
The median US parking space cost USD 31,400 to build in 2025. The average space in a commercial office or mixed-use garage realised USD 1,370.88 of revenue that year. Divide the first by the second and the structure costs 22.9 years of its own gross revenue — before a single hour of labour, a single kilowatt-hour, a single insurance premium or a single dollar of debt service. Across the eight years to 2033 the asset recovers 34.93 per cent of its build cost.
That is the arithmetic. The more interesting question is why anyone keeps building it, and the answer turns out to explain almost everything else about this market.
What the space costs and what it earns
The construction figure comes from WGI’s 2025 cost outlook: USD 31,400 a space at USD 93.85 a square foot, up from USD 29,900 in 2024. Parking structure costs rose 8.4 per cent in that year and 13.7 per cent since 2022. The spread between cities is 1.50 times, from USD 26,847 in Dallas to USD 40,380 in San Francisco, with New York at USD 39,658 and Kansas City at USD 30,960 on an index of 100. Soft costs add a further 15 to 25 per cent on top.
| Measure | Value | Basis |
|---|---|---|
| Median constructed cost per space, 2025 | USD 31,400 | WGI cost outlook, before soft costs |
| Revenue realised per space per year | USD 1,370.88 | Pheonix model |
| Revenue realised per space per month | USD 114.24 | Derived |
| Years of gross revenue equal to build cost | 22.9 | Derived |
| Build cost recovered across 2025–2033 | 34.93% | Derived |
| Monthly revenue needed to cover debt service and operations | USD 171.45–190.50 | THA Consulting benchmark indexed to 2025 |
| Realised as a share of that threshold | 66.63% | Shortfall of 33.37% |
Sources: WGI, Parking Structure Cost Outlook for 2025; THA Consulting; Pheonix Research model. The threshold is a benchmark rather than an observed figure.
The benchmark on the last two rows is the one that matters. A space needs somewhere between USD 171 and USD 190 a month to carry its own debt service and operating cost. It earns USD 114. The gap is 33.37 per cent, and it cannot be closed by operating more efficiently, because operating cost is already inside the threshold. It can only be closed by a higher tariff, by retiring the debt, or by someone else paying for the asset.
Someone else does. That is the whole design.
Why a 33 per cent shortfall is not a failure
A garage under an office building is not underwritten as a parking investment. It is underwritten as a condition of the building above it. A building that cannot offer parking cannot be let to a large share of the tenants who might otherwise take it, and in most jurisdictions the building cannot be consented at all without the spaces. Code has required four to six spaces per 1,000 square feet of office; observed utilisation in the studies we hold runs at 1.834. The structure is built for between 2.18 and 3.27 times the cars that actually park in it.
So the capex is attributable to the office revenue, not to the parking revenue. The parking line is then free to run at a level that would be indefensible as a standalone business — and the recoverable-expense mechanism completes the picture. Under a landlord-favourable operating-expense clause, structural repair and the amortisation of capital for the garage sit inside recoverable operating expenses, while the garage’s own area is excluded from the tenant’s proportionate-share denominator. The tenant funds the asset. The owner keeps the parking revenue.
Once that is understood, the 33 per cent stops looking like a failure and starts looking like the design. It also explains a fact that otherwise looks odd: the only large transaction in this segment bought the platform, not the property. Metropolis Technologies acquired SP+ in May 2024 at USD 54.00 a share, a 52 per cent premium, financed with USD 1.8 billion of preferred equity, term debt and a revolver. Private capital did not buy concrete. It bought contracts, labour and payment flows, because those earn a return that does not depend on the space ever servicing its construction cost.
ABM Industries, the largest listed operator, earned USD 818.8 million in parking and transportation revenue in the year to 31 October 2025 and USD 61.2 million of segment operating profit — a 7.47 per cent margin. Thin, and still better than the concrete it operates.
Where the arithmetic breaks, the asset is removed
US office inventory fell by 20.7 million square feet over six quarters as demolitions and conversions outran new construction. Deliveries in 2025 were 17.9 million square feet, and the pipeline is below 20 million square feet for the first time this century, at roughly 15 per cent of its first-quarter 2020 peak of 136 million. Some of what is coming down is the garage itself.
The conversion arithmetic is not attractive, but it is occasionally better than the alternative. AIA Philadelphia’s study of a convertible garage puts the cost of designing for conversion at about USD 35,000 a space in the 2025 metro Philadelphia market — slightly above the median cost of simply building the garage — with demolition at USD 41.79 a square foot and replacement residential construction at USD 596.94 a square foot. A garage-and-office site in San Rafael, California is being brought forward as 238 homes against 396 retained spaces where 132,360 square feet of office had stood.
| Route | Cost | What it delivers |
|---|---|---|
| Build a conventional space | USD 31,400 median | A bay earning USD 114.24 a month |
| Build a space designed for later conversion | About USD 35,000 | The same bay, with an exit option |
| Demolish the structure | USD 41.79 per sq ft | Vacant land, and no revenue at all |
| Rebuild as residential | USD 596.94 per sq ft | A use that can price above its cost |
Sources: WGI; AIA Philadelphia convertible parking structure study. Costs are at different dates and are not a single-scenario comparison.
The technology does not fix the fraction
The instinct at this point is to say that technology will improve the return. It improves a different number. The US Bureau of Labor Statistics counted 118,130 parking attendants in May 2023 at a median annual wage of USD 32,840 — a national wage bill of USD 3.88 billion, which is 31.71 per cent of the US share of this market. That is the addressable cost, and it is what the transaction layer is chasing.
The PARCS market has already repriced around this: the barrier is no longer what is sold, the transaction is. The licence plate recognition layer is where the identification cost has gone, and Amano and Scheidt & Bachmann sell the equipment into operators who then sell the transaction back to the owner. The occupancy sensing and automated and robotic parking reports cover what happens when the structure starts measuring itself and when it stops needing a ramp at all.
None of it changes the fraction. Recognition removes the cashier; it does not remove the person who sweeps the decks, clears a spill or stands at the barrier when a camera misreads a plate and forty cars are behind it. The saving is real and it accrues to whoever holds the contract, which is usually not the tenant paying the recovery and usually not the parker paying the tariff.
The full market report sets this against the demand side: 20.5 per cent US office vacancy, 56.3 per cent average weekly attendance against a pre-pandemic baseline, and a forecast in which 75.37 per cent of the growth in the parking pool comes from tariff. The healthcare campus and management and concession operations reports reach the same structural place from different institutional settings.
Owners who carry these assets — Boston Properties and Vornado Realty Trust among the US office REITs — are not running a parking business that happens to have a building on top. They are running a building whose lettability requires a parking structure that will never repay itself, and the skill is in the allocation rather than the operation. The EV charging at parking assets report shows what happens when a new regulatory cost lands on that structure: it is added to the asset, and then allocated by the same clause.
The number to hold onto is 22.9. It is not a forecast and it is not a projection. It is what the concrete costs in units of what it earns, and everything else in this market — the fragmentation, the thin operator margins, the recoverable-expense clause, the 7.29 per cent share held by the two largest operators in the world — follows from it.