Editorial Article
Europe Made the Stand Electric and Left the Tractor to Be Negotiated
On 13 April 2024, a European regulation that almost nobody in the ground support equipment industry had built a sales plan around became applicable. Regulation (EU) 2023/1804, the Alternative Fuels Infrastructure Regulation, did not ask European airports to reduce emissions. It told them to install something. By 31 December 2024 every contact stand at an airport on the trans-European core and comprehensive network had to be able to supply electricity to a stationary aircraft. By 31 December 2029 the same requirement reaches the remote stands — the open positions away from the terminal where a great deal of an airport’s diesel is actually burned.
Anyone reading that as a mandate to electrify a fleet should read it again. AFIR regulates the stand. It says nothing about the tractor.
That distinction is not a drafting accident and it is not a loophole to be complained about. It is the deliberate architecture of European transport law, which treats the airport as an infrastructure provider and treats the equipment that moves bags as a commercial matter between private parties. The consequence is a market with two demand signals pointing in different directions, and an industry that has spent three years confusing one for the other.
What the European obligation actually buys
An airport can comply fully with AFIR without purchasing a single electric ground support unit. The compliance package is a fixed electrical ground power connection at the stand, a pre-conditioned air system, and enough substation capacity to run both. None of those are vehicles. All of them are expensive, which is why airport capital programmes have absorbed the obligation so readily — and why the equipment forecast sits in a different document.
The airports furthest ahead have gone further than compliance anyway. Stuttgart Airport’s all-electric turnaround programme includes a fully electric refuelling vehicle, reports apron fleet emissions down roughly 98 per cent since 2013, and targets carbon-neutral ground operations by 2030. That is a genuine transformation. It is also, almost entirely, a statement about infrastructure and about the airport’s own equipment, not about the fleets of the handlers operating around it.
And that is the crack in the European model. An airport’s own ground support equipment is Scope 1 — the emissions it is judged on. The equipment its handlers operate is Scope 3, which it reports but does not control. Around three-quarters of the non-aircraft emissions at a commercial airport come from ground handling activity, according to ACI World figures cited in ICF’s September 2026 study. So the deliberate design produces a situation where an airport can spend EUR 15 million, as Nantes Atlantique did on 12 electrified stands and 100 charging points, cut its own footprint substantially, and leave the majority of the emissions on the apron untouched because those units belong to a company with a three-year airline contract and a single-digit margin.
California named the vehicle
The United States took the opposite approach, and the difference in market effect is enormous.
Los Angeles World Airports requires that from 1 July 2028 every newly registered ground support unit at Los Angeles International be zero-emission or near-zero-emission. From 1 January 2030, conventional units in the core categories — carts, baggage tractors and tugs, belt loaders, aircraft tractors and tugs — are barred from the airfield outright. The fleet must be fully zero-emission by 2033. Van Nuys went earlier and harder at a much smaller field: from 1 June 2025 any newly based unit must be zero- or near-zero-emission, and from 1 January 2030 the entire fleet must be.
Those are vehicle rules. They cannot be satisfied with cable and a substation. A baggage tractor is either electric or it is not on the apron, and no amount of grid capacity changes that.
Statewide, the California Air Resources Board set out a pathway to a zero-emission ground support fleet by 2034 in its 2020 Mobile Source Strategy and committed to bring implementing programmes and policies in 2027, with a potential first Board hearing that year and implementation from 2030. That process is the largest single unresolved variable in this market. An announced intent is not an instrument, and the Board has not yet written the rule.
| Date | Jurisdiction | What must be true | Instrument |
|---|---|---|---|
| 13 April 2024 | European Union | Regulation (EU) 2023/1804 applies | Regulation |
| 31 December 2024 | European Union | Electricity for stationary aircraft at every contact stand, TEN-T core and comprehensive | Regulation |
| 1 June 2025 | Van Nuys, California | Every newly based unit zero- or near-zero emission | Airport policy |
| 1 July 2028 | Los Angeles International | New registrations zero- or near-zero emission | Airport policy |
| 31 December 2029 | European Union | Electricity for stationary aircraft at remote stands | Regulation |
| 1 January 2030 | Los Angeles and Van Nuys | Conventional tractors, belt loaders, tugs and carts barred | Airport policy |
| 2033 | Los Angeles International | Fully zero-emission fleet | Airport policy |
| 2034 | California | Pathway to a zero-emission fleet, if the Board rule arrives | Announced intent |
The voluntary layer rewards the smaller slice
Between the statute and the concession sits an architecture that shapes what airports choose to do first, and it points the same way as the Scope problem. Airport Carbon Accreditation verifies reductions in Scope 1 and Scope 2. In its seventeenth year, accredited airports reported a reduction of 160,024 tonnes of CO2 equivalent across those scopes, at an average intensity of 1.47 kilograms of CO2 equivalent per passenger.
Those are the scopes where an airport’s own equipment sits. A certification scheme that rewards progress on the emissions an airport controls will, entirely rationally, direct capital toward the fleet the airport already owns — the smaller share — before it reaches the fleet that produces most of the emissions. This is not a flaw in the scheme. It is the same incentive split that runs through the balance sheets, appearing one level up.
The instrument that actually binds is the lease
Neither jurisdiction gives an airport a general statutory power to compel a third-party handler to replace its equipment. Europe does not because AFIR regulates stands. California does not because the LAX and Van Nuys rules attach to airfield access, which the airport controls — and that is the clue.
What fills the gap is the concession. An airport appoints its handlers, sets the terms on which they may operate, and can make fleet composition a condition of the licence. That is precisely what a pooling scheme formalises, and the clearest worked example is at Hong Kong International, where Airport Authority Hong Kong built a ground services equipment pooling scheme in which the airport itself owns around 1,000 units, more than 95 per cent of them electric, supported by two dedicated maintenance workshops and over HK$300 million committed to procurement and charging infrastructure.
Read that structure carefully, because it solves two problems at once. It removes the capex and the asset from the handler — which suits a business with Swissport‘s margin profile, and which dnata and SATS face in the same form. And it gives the airport direct control over the composition of the fleet it is being judged on. One fleet, one charging standard, one workshop, one spare-parts pool.
The condition that makes pooling work is a single authority with control of the whole apron. Where three competing handlers share a port, each with its own airline contracts and its own fleet policy, coordination costs rise and the airport’s leverage falls back to the lease. That is why the transition is negotiated airport by airport, in the same document that sets the fees, and why a supplier watching for a step change in demand should be watching concession renewals rather than parliamentary calendars.
One wrinkle that slows everything
There is no harmonised type approval for airside ground support equipment. Approval is granted by the airport or the national aviation authority against local airside safety requirements, and the process varies. A unit certified at one hub may need separate sign-off at the next, which raises the cost of every cross-border fleet decision and works directly against the standardisation that an electric fleet rewards. Oshkosh Corporation, which acquired JBT AeroTech in August 2023 for USD 800 million, and Textron through its TUG and Douglas brands, Illinois Tool Works in ground power, Cavotec in 400 Hz systems and Mallaghan in belt loaders all sell into a market where the certification of an identical product changes at a border.
None of this makes the mandate meaningless. It makes it slower and more uneven than the date ladder suggests, and it relocates the decision from the statute book to the contract. Europe has made the stand electric. Whether the tractor follows is still being negotiated, one concession at a time, at airports whose own carbon accounts will look increasingly good either way.
This article draws on Pheonix Research’s Global Airport Ground Support Equipment Electrification Market Report 2026–2033, which values the market at USD 821.6 million in 2025 rising to USD 2,889.6 million in 2033 at 17.02 per cent. Related analysis in the same segment includes Airport Landside Access & Ground Transportation Management and EV Charging at Parking Assets.