Press Release
Overnight Dwell Is Free; the Demand Charge Is 25% to 52% of a Fleet Depot's Electricity Bill
A fleet depot buys capacity for fifteen minutes and energy for nine hours. The demand charge for that fifteen minutes is 25% to 52% of the electricity bill — and the software that could move it can only help half the depots in the market.
Pheonix Research — 24 November 2026. The first sizing of the global market for fleet depot and overnight yard charging infrastructure puts it at USD 9,400.0m in 2025, rising to USD 24,600.0m by 2033 at a 12.78% CAGR, on managed depot charge points growing from 2.24m to 4.05m at 7.68%. Revenue per managed port rises from USD 4,196.43 to USD 6,074.07.
The finding that matters more than the total is what a depot actually sells. It does not sell electricity and it does not sell time. It sells capacity — and the capacity is measured across the single highest fifteen-minute demand interval in the month, while the energy it delivers is spread across a nine-hour overnight dwell. The ratio between the two clocks is 36 to 1.
“A depot is the cheapest place in the world to put a kilowatt-hour into a battery, and the only place where the bill is decided by a peak the operator may not be able to avoid,” the report states. “The fleet arrives home inside the same forty minutes. Every charger is sized so that every vehicle is ready by morning. That is not an operational error. It is the design, and it is what the tariff measures.”
The Ontario Energy Board’s cost-of-service modelling of real fleet load profiles puts the demand component at 25% to 48% of the bill for a 25-vehicle bus depot and 29% to 52% for a ten-vehicle food delivery fleet, against 12% to 28% for a typical commercial customer. Wang, Miller and Fulton’s 2025 study of depot charging for battery-electric trucks uses a California statewide average of USD 0.20 per kWh and USD 17 per kW-month. The National Association of State Energy Officials and partners found demand charges averaging 73.7% of the modelled monthly bill across the fleet cases examined.
The number that splits the market in two
Twenty-five parcel vans, 60 kWh each, on 25 eleven-kilowatt posts, produce a 275 kW unmanaged peak. The overnight window allows 125 kW if the load is flattened. At USD 17 per kW-month the demand charge falls from USD 4,675 a month to USD 2,125 — a 54.55% cut, USD 30,600 a year, on 33,000 kWh of monthly energy. That is 14.17 cents per kWh before management and 6.44 cents after.
Twenty-five transit buses, 350 kWh each, on 25 fifty-kilowatt dispensers, produce a 1,250 kW peak. The same nine-hour window permits 972 kW. The demand charge falls from USD 21,250 to USD 16,527 — 22.22%. On a New Jersey rate of USD 31.07 per kW the van depot saves USD 55,926 a year; the bus depot cannot save its way out of a power upgrade, because the energy it must deliver already consumes the window.
“Demand charges are avoidable in proportion to dwell headroom, not in proportion to fleet size or software sophistication,” the report states. “A parcel van has 2.20 times the dwell it needs. A transit bus has 1.29 times. One of those depots is buying software. The other is buying transformers, batteries and a bigger service.”
The report draws a conclusion that runs against the sector’s own marketing: the depot with the highest electricity throughput carries the lowest demand-charge incidence per kilowatt-hour, and the depot with the lowest throughput carries the highest. Software is worth most where the vehicles work least.
Where the capital actually goes
Because the make-ready is sunk, site-specific and immovable, the charging port is the smallest line in the budget at any real scale. Cost bands compiled for Environment and Climate Change Canada and published by Clean Energy Canada put a 2 to 6 MW utility service upgrade at USD 200,000 to USD 1m, a 7 to 20 MW upgrade at USD 2m to USD 20m, a transformer at USD 100,000 to USD 150,000, and total onsite infrastructure for a 2 to 9 MW site as reported by fleets at USD 500,000 to USD 2m.
The Metropolitan Transportation Authority’s first electric bus depot phase cost USD 54m for 470 buses and 53 overhead chargers — USD 114,893.62 per bus — with a second phase budgeted at USD 188m across nine depots. The chargers are a rounding error in that programme.
The layer economics follow. Hardware is 38.0% of 2025 value and 29.0% of 2033 value, compounding at 9.03%. Energy-management and charging software is 19.0% of 2025 value and 30.0% of 2033 value, compounding at 19.40%. Make-ready holds 27.0% and falls only slowly, at 11.13%, because the transformer is not optional. Managed operations grows at 13.64%.
“The market does not merely favour software,” the report states. “The financing structure of the industry forces capital towards it. A transformer has a thirty-year life and a contracted fleet behind it — that is a bond. Whoever buys the bond has to be able to manage a fifteen-minute measurement, and that party is paid to be the software layer.”
The subsidy depends on where the depot is
The Section 30C alternative fuel refuelling property credit allows 30% of qualifying cost, including electrical energy storage, up to USD 100,000 per item — but only for property placed in service in an eligible census tract and by 30 June 2032. A suburban industrial depot on the edge of a metropolitan area may sit outside every eligible tract.
“The subsidy that pays for a depot charger is conditioned on where the depot is, not on what it does,” the report notes.
The EU’s Alternative Fuels Infrastructure Regulation, meanwhile, sets binding deployment targets for publicly accessible heavy-duty charging pools — 15% of the TEN-T network by the end of 2025 at 1,400 kW or more per pool, 50% by the end of 2027 — and says nothing comparable about private depots. Depot economics are set by utility rate design, interconnection rules and tax credits rather than by transport law.
Regional structure
Asia-Pacific holds 58.0% of managed depot ports and 44.0% of value in 2025, at USD 3,183.50 of revenue per port. Europe holds 18.0% of ports and 25.0% of value at USD 5,828.37. North America holds 17.0% of ports and 24.0% of value at USD 5,924.37. By 2033 North America’s revenue per port reaches USD 9,313.58 on 15.0% of ports — the most expensive depot infrastructure in the world, because the interconnection is the constraint and the constraint is priced.
Among the suppliers operating across the four layers are Siemens, ABB, Schneider Electric, ChargePoint, Kempower, Shell, Enel, Daimler Truck, Traton and Tesla. There is no company in the world whose revenue is mostly depot charging infrastructure, and four charging hardware businesses — EVBox, Tritium, Proterra and Enel X Way’s North American arm — left the market inside two years while demand grew at double digits.
What the report refuses to claim
The report states four deliberate gaps. No statistical agency publishes a global count of fleet depot charge points, so the volume series is a constructed estimate labelled as such, built from the California Energy Commission’s 2030 assessment of 157,000 chargers for 180,000 medium- and heavy-duty zero-emission vehicles and from the MTA’s depot programme. Utilities do not publish depot-specific revenue, so demand-charge shares are reproduced from regulator modelling rather than billing data. Make-ready cost ranges are project-level and site-specific. And no jurisdiction publishes depot utilisation by fleet type, so duty cycles are engineering derivations from stated battery and port capacities.
No market-research publisher is cited anywhere in the report. The study is built at a 70% secondary and 30% primary research balance, the primary component being Pheonix’s own interviews with fleet electrification and depot operations managers, conference attendance, open-ended interviews and surveys.
Related Pheonix research in this segment: Global Rental Fleet Turnaround Software Market Report, 2026–2033; Global Road User Charging & Congestion Pricing Back Office Market Report, 2026–2033; Global Commercial Office & Mixed-Use Garage Operations Market Report, 2026–2033; Global Parking Concession Monetisation & Revenue-Stream Financing Market Report, 2026–2033; Global Fuel Card & Fleet Payment Solutions Market, 2026–2033.
About Pheonix Research. Pheonix Research publishes transaction-based market intelligence across automotive and transportation, fleet and depot infrastructure, parking and curb management, and adjacent energy markets.
Media contact: [email protected]