Editorial Article
The Tenant Pays for the Concrete and the Owner Keeps the Parking Revenue
The garage under an office building produces two numbers that almost never appear on the same page. The first is what it earns. The second is what it costs to own. Put them side by side and the gap is roughly a third — and the most useful question in this corner of commercial real estate is not how to close it, but who is currently paying it.
The answer is usually the tenant, and the instrument is a clause in a lease that was signed long before anyone re-ran the arithmetic.
One asset, two separate ledgers
In the contractual architecture that dominates commercial office and mixed-use buildings, parking revenue is a landlord revenue line while parking cost is a recoverable operating expense. The two are not netted against each other in the tenant’s bill. Where a landlord charges separately for parking, the costs attributable to owning and operating the garage offset against the revenue from the parking charge and are not treated as an operating expense at all; the garage’s own floor area is excluded from the denominator used to calculate a tenant’s proportionate share of the building; and the landlord typically reserves the right to raise the parking charge.
Read that sequence again, because it does something specific. The tenant’s share of building costs is calculated on a denominator from which the garage has already been removed. The garage’s costs are then recovered on a different basis, or not recovered at all, while the garage’s revenue stays with the owner. The tenant funds the asset. The owner keeps the income from it.
This is not a scandal and it is not hidden. It is the ordinary allocation of risk in a building where the garage exists to make the office space lettable. What it means practically is that a garage can return two-thirds of what its capital needs and nobody involved is behaving irrationally — because the return being underwritten is the rent upstairs, not the tariff downstairs.
Our market report on commercial office and mixed-use garage operations puts the numbers on this: USD 31,400 of median constructed cost per US space in 2025, USD 1,370.88 of realised revenue per space per year, and a benchmark requirement of USD 171.45 to USD 190.50 a month against USD 114.24 actually earned.
Three clauses, three different businesses
The same garage, with the same cars and the same posted tariff, produces three different answers depending on which form of the clause is in the document.
| Clause form | Where structural and capital cost sits | Where parking revenue sits | Commercial effect on the owner |
|---|---|---|---|
| Landlord-favourable | Inside operating expenses, recoverable, uncapped | Retained by the owner | Asset cost passes to tenants; parking income is margin |
| Balanced | Structural work treated as capital and amortised; parking revenue offsets the cost before allocation | Applied against cost first | Recovery is real but the tenant sees the revenue that offsets it |
| Tenant-favourable | Parking maintenance excluded from operating expenses | Credited back against operating expenses; rights inside base rent | The owner carries the asset and hands back the income |
Source: Pheonix Research, from disclosed operating-expense and parking-area lease language.
The spread between the first row and the third is the entire economics of the asset. In the first, the owner has converted a capital liability into a recoverable cost and kept a revenue stream. In the third, the owner has kept the capital liability and given away the revenue. Nothing about the physical garage changes between them.
This is why the lease, rather than the market, is the thing to read first. It explains why ABM Industries earned USD 818.8 million in parking and transportation revenue in the year to 31 October 2025 at a 7.47 per cent segment operating margin — a business that thin only makes sense if the operator is being paid a fee to run something whose real return accrues to someone else. It explains why the largest transaction in the segment, Metropolis Technologies‘ acquisition of SP+ at USD 54.00 a share in 2024 — a 52 per cent premium — bought contracts and payment flows rather than a single structure. Concrete only works as an investment if the lease lets it.
The parking management and concession operations report makes the related point from the other direction: where the contract is a concession rather than a management agreement, the operator takes the revenue risk and pays the owner a guaranteed rent, and the whole structure of the deal inverts. The office segment mostly does not do this, because the garage is an amenity rather than a business. The concession monetisation and financing work covers what happens when it does.
Where the clause meets the geometry
A mixed-use podium has one genuine structural advantage that almost nothing in this market exploits. Different land uses peak at different hours. Office demand concentrates at midday on weekdays. Residential demand concentrates overnight. Hotel demand arrives between six and eight in the morning and returns from ten at night. Retail peaks between one and two in the afternoon on weekdays and two and four at weekends.
| Land use in the podium | Peak window | Whose cars are in the structure |
|---|---|---|
| Office | Midday, Monday to Friday | Tenants and their visitors |
| Residential | Overnight | Residents, on contract, absent all day |
| Hotel | 06:00–08:00 and 22:00–00:00 | Guests, short dwell, high tariff tolerance |
| Retail and food | 13:00–14:00 weekday; 14:00–16:00 weekend | Visitors, transient, highest hourly rate |
Source: Urban Land Institute, Shared Parking, second edition — accumulation profiles by land use.
One structure can serve all four peaks because they never coincide. That is precisely how shared-parking analysis justifies building fewer spaces than the sum of the individual requirements — and it is the only mechanism in this segment that could raise utilisation without raising the tariff.
Tenant designation kills it. A tenant that has bought 120 bays has bought 120 bays, whether or not its people are in the building on a Friday, and the residents upstairs cannot use them. The pooled structure is the efficient structure, and the same lease that allocates the cost is what prevents the pooling. No operator discloses the designation profile of its own portfolio, so the capacity that designation strands is real and unquantified, and we have declined to put a number on it rather than invent one.
Then the regulator adds capital
The allocation is now being tested from outside. California’s 2025 green building standards code requires office and retail projects above 201 spaces to make twenty per cent of them EV-capable, with charging equipment installed at three-quarters of the capable spaces. The cost outlook we rely on puts the resulting construction cost increase at three to six per cent — roughly USD 942,000 on a 500-space garage, or about USD 1,884 a space, on an asset already earning two-thirds of its threshold.
Who pays for that turns on the same clause. The capital is the owner’s. The electricity sale, the session fee and the dwell-time premium accrue to whoever holds the asset and the contract. Our EV charging at parking assets report covers what the charger does to dwell time; the occupancy sensing and space guidance work covers what happens when the structure starts measuring itself instead of guessing.
None of it changes the underlying position. The manager of the asset — CBRE Group, Jones Lang LaSalle or Cushman & Wakefield — runs the building and lets the contract without carrying parking risk. The operator runs the garage on a thin fee. The owner carries the capital and the recovery. The tenant pays the recovery, and the parker pays the tariff.
The hospital and healthcare campus parking report reaches the same structural conclusion from a different starting point: a garage whose revenue is set by an institution rather than a market, whose cost is carried by the institution, and whose asset never repays itself either. That is now three segments in this cluster where the same arithmetic appears.
The curb and kerbside work completes the picture in reverse: a curb has no construction cost at all, and is priced by schedule rather than by asset. The mobile payment platforms that monetise both are, in this sense, the only part of the parking chain that earns a return on something other than concrete.
What to watch is not the tariff. It is the clause. Any shift in standard operating-expense language toward the tenant-favourable form would move a third of this market’s cost off the tenant’s ledger and onto the owner’s, at which point a garage returning 66.63 per cent of its threshold stops being a lettability condition and starts being a stranded asset. The arithmetic has not changed in twenty years. Its allocation has, repeatedly, and that is what decides the value.