Editorial Article

Q-Park's Charging Ports Ran at 3.01 Per Cent Utilisation — That Is Correct for Availability and Fatal for Throughput

Updated November 20, 2026

Q-Park operated 7,310 charging ports across its European parking estate in 2025 and dispensed 21.2 GWh through them. Divide one by the other and every port delivered 2,900 kWh across the year. Set that against what an 11 kW post can deliver in 8,760 hours — 96,360 kWh — and capacity utilisation lands at 3.01 per cent.

The number circulates as an indictment of the charging industry. It is something more useful than that: an exact measurement of a product decision that nobody involved has ever had to state out loud.

One ratio, two products

Utilisation is output divided by capacity, and it carries no meaning until you know which product the capacity was built to sell.

An availability product is bought because a charger is there when the driver arrives. On that product a high utilisation rate is a defect: a port busy forty per cent of the time turns drivers away, and a car park that turns drivers away loses the parking revenue that paid for the port. A throughput product is bought for the kilowatt-hour. On that product, three per cent is not a shortfall. It is a catastrophe, because the capital has been deployed and the asset is not working.

The charging estate is paid on the second and regulated on the first. Everything below is what that costs.

The physics is the price

A 44 kWh top-up — a representative mid-size battery taken from a low state of charge to a workable one — takes 6.29 hours at 7 kW, 4.00 hours at 11 kW, 0.88 hours at 50 kW and 0.15 hours at 300 kW. The power rating a site selects is therefore not an engineering detail. It is the decision about how long a bay will be occupied, taken years before anyone knows what a bay-hour is worth.

Hold the parking tariff and the energy margin constant, and the consequence is arithmetic rather than opinion.

Power rating 44 kWh top-up Energy margin per session Revenue per available bay-hour
7 kW 6.29 hours USD 5.28 USD 4.84
11 kW 4.00 hours USD 5.28 USD 5.32
50 kW 0.88 hours USD 5.28 USD 10.00
150 kW 0.29 hours USD 5.28 USD 22.00
300 kW 0.15 hours USD 5.28 USD 40.00

The assumptions are Pheonix constructions and labelled as such: a USD 4.00 hourly parking tariff and a USD 0.12 per kWh energy margin. The gradient is robust to both. Change either and every row moves; the ratio between the top and bottom rows does not, because it is generated by dwell time alone. Revenue per available bay-hour runs from USD 4.84 at 7 kW to USD 40.00 at 300 kW — a factor of 8.26.

Two intermediate steps matter more than the endpoints, because they are the decisions operators actually face. Moving a bay from 11 kW to 50 kW multiplies revenue per available bay-hour by 1.88. Moving from 50 kW to 150 kW multiplies it again by 2.20. That is why the falling cost of ultra-fast equipment — roughly 20 per cent between 2022 and 2024 on the International Energy Agency’s figures, with units above 150 kW growing by more than 50 per cent in 2024 and now approaching a tenth of the global fast estate — strengthens rather than weakens the case for putting a small number of high-power posts into a large alternating-current car park.

Where the money is going

The market we size is USD 25.00 billion in 2025 rising to USD 63.60 billion in 2033 at 12.38 per cent. The composition moves faster than the total. Equipment and installation fall from 58.4 to 40.7 per cent of spend. Electricity resold rises from 29.9 to 39.8. Software and operations rise from 11.7 to 19.5. Of the USD 38.60 billion the market adds, energy supplies 46.2 per cent and the physical build 29.3.

That is a construction phase turning into an operating phase, and it changes what an asset is for. When two thirds of the value was steel and cable, the port was the product. When the largest single line is the electron, the port becomes a meter, and the bay it occupies becomes the thing actually being consumed.

Growth by unit count, not by monetisation

Ports grow faster than value: 3.40 million to 9.90 million at 14.29 per cent, against 12.38 per cent for value. The implication is rarely stated. Revenue per installed port falls from USD 7,352.94 to USD 6,424.24 — a decline of 12.6 per cent across eight years. Each additional port earns less than the one before it, because the ports being added are concentrated where the electrons are cheapest and the dwell is longest.

The estate was built at the slow end

Fifty-six per cent of UK public charging devices are rated between 3 and 8 kW. Twenty per cent are at 50 kW or above. That distribution was rational for the subsidy and grid-connection environment that produced it, and irrational for the bay-hour economics that now govern it. Every AC post installed in a car park is a decision to hold a bay for four hours, and the estate contains far more of those decisions than the traffic requires.

Why the wrong end got built

The answer is not incompetence. It is that the party who owns the bay and the party who earns the electron are, almost always, different companies. The car park operator owns the hours. The charge point operator owns the meter. They are joined by a space rental agreement that prices the land by the year — a fixed rent per port, a revenue share on the electricity, or both — and never by the hour. Neither party is paid for the bay-hour, so neither optimises it, and the cost of the resulting dwell lands on a driver who had no part in the decision.

Q-Park names the consequence in its own reporting: an electric vehicle “may also occupy an EV charging point even when it is fully charged,” which it describes as an “operational as well as a commercial challenge.” That is the overstay problem stated by the operator that experiences it, and it is a direct output of a contract structure in which nobody is charged for the time.

Underneath sits a specification error that recurs across the estate. On alternating current the vehicle’s onboard charger is usually the limiting device, and 11 kW is the practical ceiling for most passenger EVs now on the road. Fitting a 22 kW AC post to an 11 kW-capable vehicle delivers 11 kW. The hardware cost rises, the dwell does not fall, and the bay-hour economics are exactly unchanged. It is the most expensive mistake in this market that looks like an upgrade.

What actually moves the number

Three mechanisms, in order of how quickly they can be deployed.

Buffering. Where the grid cannot deliver the capacity requested — and in constrained urban networks the New York State Department of Public Service has documented waits of one to ten years and costs in the millions to remedy — the technical answer is to stop asking for it. A battery behind the meter absorbs a trickle from the network and delivers a fast charge to the vehicle. The economics are unusual: the battery does not make the energy cheaper, it makes the bay-hour cheaper, by letting a site offer 150 kW dwell economics on a 50 kW connection. In a market where the bay-hour varies 8.26-fold, that is among the highest-value applications of storage available.

Load management and flexibility. Forty AC ports on a 100 kW connection cannot all run at 11 kW at once; a management system that rotates them can, and the vehicle does not notice because it is parked for four hours regardless. Slow charging is inherently interruptible — a 300 kW session cannot be paused without the driver noticing, a four-hour 11 kW session can be paused for twenty minutes without consequence — which makes the AC estate the natural provider of demand flexibility, and payment for that flexibility a second income stream on a port that is otherwise three per cent utilised.

Contracting the hour. Vehicle-to-grid and vehicle-to-building have been technically feasible for years and commercially marginal, for a reason this analysis makes obvious: bidirectional charging needs a long, predictable dwell, which is precisely the dwell profile that destroys parking revenue. That inversion is the opening. A site that sells grid services during a four-hour session monetises the duration itself rather than the electrons — which is the repricing the market has been missing.

The portfolio shape that follows is the barbell APCOA has disclosed without naming it: 11–50 kW alternating and direct current across the estate, plus a separately funded programme of a thousand high-power stations. Volume in the middle, margin at the top, and no attempt to be everything at 7 kW.

The metric to manage

Three point zero one per cent is not a failure of the charging industry. It is an accurate reading of a business that never chose which product it sells — availability priced like throughput, throughput delivered at availability’s power rating, and the scarce resource in the middle, the bay-hour, carrying no price at all.

An operator who has not computed revenue per available bay-hour does not know whether their estate is performing or destroying value, and occupancy data will not tell them. The figure is derivable from four inputs: available bays, available hours, revenue and power rating. Almost nobody computes it. That is the gap in which this market’s next phase of returns will be decided.

Method and sources

This article draws on the Pheonix report Global EV Charging at Parking Assets Market 2026–2033, and on the parent analyses that sit around it: on-street enforcement and digital permitting, parking management and concession operations, curb and kerbside management, occupancy sensing and space guidance, airport pre-booked reservation platforms and parking access and revenue control systems.

Roughly 70 per cent of the underlying weight is secondary. Q-Park’s Annual CSR Report 2025 supplies the 7,310 ports, the 21.2 GWh and the overstay commentary. APCOA’s ESG Report 2025 supplies the estate ratings and the high-power programme. The International Energy Agency’s Global EV Outlook 2025 supplies ultra-fast growth and cost deflation. The Department for Transport and Zapmap public charging device statistics for 1 October 2025 supply the 56 and 20 per cent distributions. The New York State Department of Public Service capacity-constraints filing of December 2025 supplies the interconnection timelines. Jenn (2025) in Transportation supplies the utilisation context.

Roughly 30 per cent is Pheonix primary work: 27 semi-structured interviews across six markets, nine conference-floor interviews, one closed roundtable with operators and asset owners, and 41 survey responses, conducted through 2025 and early 2026. The bay-hour table, the USD 4.00 tariff, the USD 0.12 margin, the 3.40 million port base and the 18.70 TWh volume figure are Pheonix constructions and are labelled as such wherever they appear.

Revenue per port, the 12.6 per cent decline, the 8.26-fold gradient and the 1.88 and 2.20 step multiples were computed from the disclosed figures rather than quoted.

References

  • Pheonix Research, Global EV Charging at Parking Assets Market Report 2026–2033.
  • Q-Park N.V., Annual CSR Report 2025.
  • APCOA Parking Holdings GmbH, ESG Report 2025.
  • International Energy Agency, Global EV Outlook 2025.
  • Department for Transport and Zapmap, Public electric vehicle charging device statistics, 1 October 2025.
  • New York State Department of Public Service, capacity-constraints filing, December 2025.
  • Jenn, A. (2025), Transportation.